The possible cause of the trip should be that a large number of single-phase loads in the hotel are unevenly distributed in the three-phase power supply, which leads to the overload of a certain phase and leads to the trip.
Solution: When the load is maximum, measure the three-phase currents respectively, and adjust part of the load of one phase with excessive current to the other two phases, so that the three-phase currents of the line are basically balanced.