What are the precautions for hotel decoration acceptance? Acceptance structure: The first step is to accept the house structure, check its area, check its location and orientation, measure the public area, and check whether some outdoor facilities are in good condition. If it is found to be inconsistent with the contract, it should be raised with the real estate agent, and the resistance can also be reflected to the relevant government departments. Acceptance materials: pay attention to whether the materials used are consistent with the contract, whether the brand, model and style correspond, etc. Balcony acceptance: the closure of the balcony is a concern of many owners after the house is closed, so the owners should consider it when buying a house. If the balcony is closed in the future, then some layout needs to be changed. Bathroom acceptance: check whether the ceiling and bathtub will leak water, and whether the external wall close to the bathroom has bubbles and paint peeling; The toilet and washstand should be polished to see if they are smooth and smooth. Check the water supply and drainage pipes in the bathroom to see if the drainage pipes are smooth; In addition, it is often neglected to leave the exhaust holes in the bathroom, so it should be suspended to check whether the pipes are installed in place. Kitchen acceptance: attention should be paid to whether the kitchen utensils are cracked, scratched and enamel falls off, whether the cupboard door is open and closed freely, whether the screws fall off, whether the vegetable washing pool is blocked by foreign bodies, whether the water connected to the faucet is rusted, whether the position of the drainage pipe is reasonable, whether there are traces of water seepage around it and so on. Acceptance of electricity consumption: "Two-way power supply, lighting and power system shunt" is the most basic requirement of household electricity consumption, and its total household electricity consumption is limited, which should usually be reflected in the wiring layout of distribution box. At the time of acceptance, it is necessary to do a power-off experiment. First, pull down the main brake to see if the indoor power is completely cut off; Then close the brake separately, and see if all the branch lines are completely controlled. Of course, we must also pay attention to whether the single circuit has changed, whether the circuit capacity is enough to load electrical equipment, whether the power panel on the wall is enough, whether the position is reasonable, and whether the power supply of the kitchen and bathroom is safe. Turn on all the lamps and lanterns switches to see if they are all on. If conditions permit, you should also use a multimeter to check whether there is electricity in the socket. Acceptance of lamp caps: check whether the lamp caps and sockets in each house have electricity, and whether the telephone sockets, broadband sockets, TV antenna sockets and first-aid sockets are accurate and unobstructed. If necessary, they can be inspected together with the developers. Acceptance of air conditioner: the outdoor unit of air conditioner should reserve seats, the air conditioner should reserve pipeline holes, and the air conditioner pipeline channel should be reserved in the fully enclosed space. Gas acceptance: gas pipelines should usually be exposed, so that gas leakage can be found and maintained in time. Of course, the degree of water, electricity and gas meters should be checked at the time of acceptance. Acceptance of "sky, ground and wall" requires attention to many details of the house "sky, ground and wall", whether the ground is flat or not, of course, this will also be reflected from all surfaces of the house, which will also have a greater impact on the overall beauty and function. Of course, after the renovation of small high-rise buildings, there will sometimes be such a problem. The story height does not match the developer's promise. Small high-rise buildings that were already nervous before the renovation are more likely to become depressed after the renovation. Wall acceptance: pay attention to whether the wall is flat, whether there are cracks, whether its corner line is straight, etc. Whether there is an empty drum on the wall, tap it with a small hammer to hear whether there is an empty drum below. Acceptance of suspended ceiling: the installation of suspended ceiling requires that the top corner line should be closely matched with the surrounding walls, and the connection between gusset plates should be consistent, and there should be no big cracks and warping, and the suspended ceiling should look flat and smooth. Floor acceptance: when the floor is accepted, it needs to be coordinated as a whole, and its foot feeling should be consistent. The floor should not have bulging deformation or serious color difference; Whether the floor is tilted, whether there are bubbles and scratches on the surface, and whether the floor inspection paint film is smooth; Listen to whether the floor is hollow, whether there are obvious gaps and unevenness on the floor, and whether the joint between the floor and the skirting board is tight; Pay attention to check whether the moisture content of the floor meets the requirements, etc., and pay attention to whether the floor is noisy when it is trampled. Acceptance of wall tiles: it is acceptable to tap the wall with a small hammer when detecting wall tiles, and it is acceptable to have an empty drum with an area below 1.5% under a single wall tile. In principle, there is no empty drum when paving floor tiles; You can also look around the wall or touch it with your hands to check whether the wall is flat and clean and how hard you paint it. Pay attention to the relevant position to leave air conditioning pipe holes. 12. Acceptance door, window, ladder door, window, ladder door, window, ladder door, window and ladder are key components in interior decoration, which not only have beautiful decorative effect, but also have important practical functions and are essential in home life, so it is of great practical significance to do a good job in acceptance of doors, windows and ladders. Acceptance door: The inner surface of the wooden door frame should be smooth, and the flatness should be less than 2 mm every 2 meters. Poor veneering or unfavorable post-protection will make it uneven. When it is accepted, it is necessary to check whether the veneer of the door frame is parallel to the wall. Acceptance of doors and windows: the door and window cover should not feel empty and soft by hand, to see whether the right-angle joint is tight, whether the surface is smooth and whether it will automatically close or open if it is not locked. In addition, whether the marble on the windowsill is cracked or not, you can touch the windowsill with your hand and take the principle of not scraping your hand.