Current location - Recipe Complete Network - Catering franchise - What are the kitchen plumbing remodeling materials? Kitchen remodeling to pay attention to these small details
What are the kitchen plumbing remodeling materials? Kitchen remodeling to pay attention to these small details
A, kitchen plumbing remodeling materials which

Water part

PPR water pipe, washing machine faucet, bathroom basin faucet, kitchen basin, pedestal basin, toilet, single rod towel rack, double rod towel rack, towel rack, paper holder, makeup mirror, toilet brush, water: auxiliary triangle valve.

Circuit part

Wire: wire, single-core wire, single-core wire, network cable, telephone cable, video and audio cable, network crystal head. Accessories: electrical conduit, tee, dark box, elbow spring, into the box connector locking, into the box connector locking, direct head, direct head, waterproof insulating tape, waterproof tape, broadband network TV one point two point TV splitter box, circuit breaker, horizontal pipe. telephone socket, audio socket, whiteboard.

Lamps

Kitchen work lamps, main bathroom lamps, south balcony lamps, north balcony lamps, living room lamps, dining room lamps, master bedroom lamps, Nikkong lamps, Nikkong lamps, Nikkong lamps, master bathroom mirror headlamps, downlamps, cold light lamps, cold light lamps transformers, guest bedroom bedside lamps, master bedroom bedside lamps.

Gas part

Galvanized pipe, galvanized outer wire, galvanized pipe elbow, galvanized outer wire, galvanized pipe tee, galvanized pipe elbow, ball valve.

Two, 100 square meters of plumbing and electrical renovation prices

Open wall groove patchwork

100 square meters of residential, the need to open the water, wire grooves about 65-85 meters, according to the code requirements, water, electrical wiring must be in the wall, the slot of the water pipe must be taken to the wall and within the ceiling, with the exception of one place is a toilet with a sewage pipe, where, because of the Corner of the wall and sewage pipe location is very close, not easy to water pipe welding, so usually go to the ground.

Currently on the market brick walls and concrete walls mixed calculation of trenching labor costs, can be calculated at an average price of 8-10 yuan are reasonable, dressing involves cement, sand, glue, etc. to fill the groove, the tools are now usually involved in the saw blade, scraper, etc., within 8 yuan are reasonable.

Gas pipe

The pipe from the gas meter to the stove and shower is usually within 12 meters. This part of the general use of labor pipe factory Galaxy brand 6 points of pipe, because it is a factory run by the Bureau of Labor Reform, the quality is too high. Gas pipe laying safety involves safety issues, I recommend that the gas company can be responsible for laying. This part of the cost incurred mainly pipe and elbow, etc., labor will not exceed 10 yuan / meter.

Switches and sockets

According to the number of homeowner demand configuration, 100 square meters of about 55-65 configuration, air conditioning, kitchen outlets are recommended to install switched outlets, so that many electrical appliances do not have to go back and forth to plug and unplug. This part of the labor cost 3 yuan / a, but also to occur in the dark box, octagonal box and hoses and other costs, dark boxes and other medium quality in 1.6 or so a, the labor cost is not more than 1.5 yuan / only, but also some electrician dressings and so on.

Hole in the wall

Because of the need to wear pipes indoors, each household to play a hole in the wall 5-20. The market price of 15-25 yuan / a, but some neighborhood property designated hole-punching people, charging 45 yuan / a. As the number of holes and the price can not be determined before the start of construction, you can let the construction staff to help contact the hole-punching workers, so that the price is affordable.

Three, the kitchen remodeling to pay attention to these small details

Socket

(1) weigh: in line with national standards of the socket used inside the copper wire more than the copper thick, plastic shell tight, so the weight is heavier, and substandard socket jerry-built will obviously feel much lighter.

(2) Repeatedly press the switch: can be repeated several times to try to press the socket switch, qualified socket open and close freely and sound crisp; unqualified sockets feel hard and easy to stagnant.

(3) try plugging force: qualified socket not only each hole plugging feel moderate elasticity, and each jack plugging feel consistent; unqualified socket plugging effort is too loose or too tight, poor elasticity and easy to loosen, each hole will feel different.

(4) pull the power cord: qualified socket power cord feel soft and hard moderate, solid and reliable connection with the socket; and unqualified socket power cord feel softer, and the socket connection is not solid and very easy to pull off.

Sink

(1) sink general water height is 40-50cm from the ground, spacing is generally 15cm, buried piping is 4 ppr pipe. Sink downpipe is generally in the middle of the cabinet can be, the general pipe is 40 or 50 pvc pipe.

(2) under the sink socket, the sink below the general need to leave a 5-hole socket, convenient garbage disposal, KitchenAid, water purifier and dishwasher and other electrical power, socket height is generally about 50cm from the ground, if you are below the connection of more, such as everyone and then connected to the water purifier, and then connected to the dishwasher, it is best to leave two five-hole better, parallel.

(3) dishwasher water can be left alone a ppr pipe, and the first sink parallel on it, and then install the time to leave an angle valve or faucet are available, easy to enter the water can be. Height is still 40-50cm from the ground, the installation location, dishwashers are generally installed close to the sink, so the socket and faucet are installed at the bottom of the sink, easy to control.

Conventional to consider, inlet that is cold water, outlet that is hot water, vapor pipe, potential. In and out of the water generally from the ground up to 1 meter 5, hot and cold water bit the distance between this 10 centimeters. Vapor pipe is generally not buried, potential according to your hot and cold water location to determine, do not affect the installation of the water heater can be. Should also consider the exhaust, the size of the water heater.

Four, kitchen remodeling considerations

(1) general renovation and remodeling we think in advance is certainly the design, especially the more practical kitchen. First of all, you should consider your own home in the kitchen need some electrical equipment, such as: oven, microwave oven, KitchenAid, disinfection cabinet, and even the refrigerator, rice cooker, etc., on this basis, the placement of the above items to turn the location of the determination, and professional plumbing and electrical designers to collude, to come up with plumbing and electrical remodeling program.

(2) to a reasonable arrangement of kitchen equipment there is a most important cabinet, cabinet size should also be considered and designed into. General kitchen cabinets operating height is 800-850mm; operating surface to the bottom of the hanging cabinet, high size is about 600mm, too high too low are not good; hanging cabinet thickness of 300-400mm, the height of the range hood in the cooker surface to the bottom of the distance of 750mm.

(3) Nowadays, kitchen renovation in general will consider the hot water supply problem, washing dishes and cooking what is a lot more convenient. In the original district centralized hot water burning or their own burning on the basis of determining their own home kitchen hot water supply method is to use the KitchenAid or gas stove or electric water heater or other ways, so as to determine the direction of the water pipe and positioning.

(4) whether to do waterproofing this issue, the general bathroom is definitely need to do waterproofing, then the kitchen? According to the norms of the house without a floor drain is not necessary to do waterproof, then we buy washbasin, try to choose a water basin with overflow, to avoid leakage of faucet guide their own homes and downstairs suffer, so as to avoid the occurrence of unnecessary compensation.

(5) Today's kitchen appliances are getting bigger and bigger, more and more power, so there is no good solution? At present, some of the new buildings have a part of the kitchen power line is 4 square, and some are 2.5 square. Some families in the kitchen may use "oven, microwave, KitchenAid" and other high-power appliances, which may involve the problem of wire replacement. If the kitchen appliances are more powerful, it is recommended that you use the national standard 4 square wire or more, otherwise over time, the heat burns the wire, resulting in short circuits, fires, bringing you a lot of trouble.

(6) for your family's safety and property safety, remember that kitchen appliances must be grounded to prevent electrical leakage caused by personal safety accidents.

(7) We all know that after the water and electricity remodeling should be accepted, how to accept it? General acceptance of the waterway need to pressure test, water pressure 1.5 times the working pressure (0.5-0.8MP), pressure for half an hour without seepage and leakage, drop pressure of no more than 0.05MP for qualified.

(8) the same circuit also needs acceptance, circuit acceptance is mainly on the strong and weak power test. Weak telecommunication signal line to ensure that the signal is smooth, strong electrical insulation resistance value to meet the family electrical use standard, to ensure safety, the kitchen is suitable for splash-proof.