What are the quality assurance measures?

What are the quality assurance measures?

Hello! Quality assurance measures are rarely different for different manufacturers. Here are some examples:

In order to ensure the pipeline project, our company makes the following commitments:

1. Product quality

1. Raw materials

All raw materials of our products are made of high-density polyethylene 2481H produced by Shandong Qilu Petrochemical Company, which fully guarantees the product quality and various excellent properties of pipes.

2. Technology

Our company adopts the most advanced technology in the country for production, and all of them have passed the ISO 9111: 2111 quality and environmental system certification.

3. Equipment

Our company has 14 extruder production lines imported from Germany and 16 extrusion production lines of various injection pipes made in China, with an annual production capacity of 36,111 tons, which fully guarantees the product quality and the needs of various markets.

4. product testing

the products produced by our company strictly implement the national standard GB/T13663-2111 for product production and testing, and entrust the National Chemical Building Materials Testing Center for regular testing to ensure the stability of product quality.

5. Inspection report and certificate of conformity

Every batch of raw materials used by our company has inspection report, and every batch of pipes produced by our company also has inspection report and certificate of conformity.

2. Installation quality

1. Our company has established a complete set of construction plans, plans, organization of construction and acceptance.

2. Do a good job in organizing construction, pipe supply, material preparation, employment procedures and other preparatory work before construction.

(1) do a good job of the blue prints.the design seriously and be familiar with the drawings;

(2) master the engineering characteristics and welding quality requirements;

(3) Arrange technicians, do a good job in the blue prints.the design, be familiar with the drawings

(4) Provide perfect mechanical fixtures and auxiliary equipment

3. Carry out the construction in strict accordance with the welding process of high-density polyethylene (PE) pipes.

4. The pipes should be cleaned before installation, and there should be no dirt and other sundries in the pipes. The installed pipes should be temporarily blocked before coming off work.

5. Installation of valves and flanges

(1) Check the valve model according to the regulations, and check the appearance without defects. Make sure that the valve closure and other sundries are clear. The valve installation should be carried out in the closed state, and the valve handwheel cannot be used as the key point for hoisting.

(2) The end face of the installation flange should be aligned with the hole of the balance flange, the screw hole should be matched with the bolt, and the nut should be on the same side. After the bolt is tightened, the 1-3 button of the nut is exposed.

(3) Construction should be carried out in strict accordance with the installation technical operation procedures.

(4) At the same time of construction, fill in the construction records, and after completion, sort out the construction materials for filing and acceptance by relevant departments, and submit them to Party A in duplicate.

6. Civilization and safety in construction

(1) In construction, unity and cooperation should be achieved, and civilized construction should be carried out. Don't say anything uncivilized with construction, don't do anything uncivilized with construction, and respect each other.

(2) Strictly carry out safety operation procedures during construction to ensure engineering quality and construction safety.

(3) During the construction, double safety of equipment and personnel should be ensured to prevent all accidents.

(4) Warning signs and warning lights shall be used during night construction, and necessary protective measures shall be taken.

(5) This project belongs to outdoor operation, and cables must be moved frequently. All equipment should have protective measures, temporary lighting should be safe and reliable, and there should be special personnel to monitor when power is connected.

7. Choose skilled and hard-working workers to carry out the construction, so as to ensure that the project is completed on time and with good quality.

3. After-sales service

1. We guarantee that the * * * products meet the purpose, characteristics, materials, technical data and performance parameters required by the buyer.

2. We promise to provide after-sales service, track the quality, and pay a regular return visit to solicit opinions.

3. If there is any quality problem with pipes, I will repair and replace them free of charge.

4. Lifelong maintenance (materials will be charged at ex-factory price during the warranty period).

5. We have full-time staff to deal with business dealings with customers and after-sales service, and solve various difficulties of users in time.

thank you for reading!

What are the quality assurance systems and measures?

Quality assurance systems and measures:

Project construction quality objectives.

be clear and meet the requirements of the overall quality objective. The decomposition of project quality objectives is mainly carried out from the perspective of time and space.

project construction quality plan.

it should be compiled according to the enterprise's quality manual and project quality objectives. The project quality plan can be divided into construction quality work plan and construction quality cost plan according to the content.

ideological guarantee system.

With the ideas, viewpoints and methods of total quality management, all staff can truly establish a strong quality consciousness.

organization guarantee system.

establish and improve organizations at all levels, with division of responsibilities, so as to give priority to prevention and combine prevention with inspection to form an organic whole with clear tasks, responsibilities, authorities, mutual coordination and mutual promotion.

job guarantee system.

quality control is carried out through construction preparation stage, construction stage and completion acceptance stage.

Note:

Quality assurance means should adhere to the combination of management and technology, that is, repeatedly check whether the enterprise has sufficient technical assurance ability and management assurance ability, both of which are indispensable.

quality assurance system is not synonymous with institutionalization and standardization, and should never be a written and documented quality assurance system.

quality information management is the driving force for the normal operation of the quality assurance system. Without quality information, the system is static and only a formal system.

the depth and breadth of the quality assurance system depends on the quality objectives, and there is no fixed quality assurance system that can adapt to different quality levels.

a quality assurance system is established mainly for products or services provided, and can also be established for working procedures (or processes).

What are the commonly used quality control measures in the laboratory?

1. External quality control

External quality control, as its name implies, is a way to ensure the test results by using quality control means outside the laboratory, which is generally divided into capability verification and inter-laboratory comparison.

1.1 competence verification

competence verification refers to the evaluation of the competence of participants according to the pre-established criteria by comparison between laboratories, which is one of the necessary conditions for accredited institutions to join and maintain the international mutual recognition agreement (MRA) and an important and effective external quality control activity of laboratories.

every year, the laboratory can check the annual proficiency testing plan on the official website of China National Accreditation Committee for Conformity Assessment (CNAS) and select the items to participate in the proficiency testing. Laboratories participate in the verification and receive test samples by way of registration, and feed back to the organization of capacity verification within the specified time after completing the test according to the specified scheme. The organization of capacity verification issues a capacity verification result report after statistical analysis according to the test results of all participating laboratories, and the laboratory should evaluate its testing capacity according to the result report. The evaluation methods of capability verification include: 1. Evaluation parameters (En) of magnitude comparison: if | en | ≤ 1, it is satisfactory and passed; If | en | > 1, dissatisfied, not passed. 2. Test comparison evaluation parameter (z): | z | ≤ 2, satisfactory and passed; | z | ≥ 3, dissatisfied and failed; 2< |Z|< 3, suspicious.

when the results of competency verification are unsatisfactory, the laboratory should deeply analyze the reasons, implement corrective measures and verify the effectiveness of the measures; When suspicious results appear, the laboratory should analyze the reasons and take corrective measures when necessary according to its severity and influence scope.

Participating in proficiency testing is a very effective external quality control method, which can not only determine and monitor the ability and sustainability of laboratory testing, but also effectively identify the problems existing in the laboratory. However, due to the restriction of the annual plan, sometimes some testing items in the laboratory are out of the plan and the ability cannot be confirmed, so it is necessary to carry out inter-laboratory comparison to supplement it.

1.2 interlaboratory comparison

interlaboratory comparison refers to the organization, implementation and evaluation of the same or similar test samples by two or more laboratories according to the pre-specified conditions, so as to identify the problems existing in the laboratories and the differences between the laboratories.

Generally, there are two ways to carry out inter-laboratory comparison, one is to organize independently, and the other is to participate as a participant. As the organizer, the laboratory should first choose a suitable comparison laboratory. In order to ensure the credibility of the comparison results, it is suggested to choose a laboratory that has been recognized by CNAS, metrological certification or authoritative in the industry as far as possible; The laboratory should also make a reasonable comparison plan, which should include the methods adopted, test items, data analysis and processing methods, sample quantity and necessary information, experimental requirements, test results and other contents, and reach an agreement with the participating laboratories; Finally, the organizer prepares the comparison report according to the test results, and makes clear the conclusion of the comparison, the problems to be improved and the improvement measures.

through the comparison between laboratories, the laboratory can find out the existing problems and the differences with other laboratories in time, so as to find out the reasons and improve them in time. Compared with capability verification, it is more flexible and can be used as a common means of external quality control in laboratories.

2. Internal quality control

Internal quality control refers to the quality control carried out by the laboratory with its own resources to ensure the effectiveness of the test results, which generally includes methods such as using standard monitoring, personnel comparison, instrument comparison, method comparison, sample re-testing, and analyzing the correlation of results with different characteristics of articles.

2.1 personnel comparison

refers to the ability comparison between laboratory testing technicians. Different testing technicians use the same instrument, use the same method and test the same special substance under the same testing conditions, and evaluate the obtained data. It can be used as a means to verify the technical ability of new employees after training, and can also be carried out in laboratories with multiple inspectors.

2.2 instrument comparison

refers to the comparison between testing instruments. Different testing instruments, the same tester, the same method and the same testing conditions are used to test the same testing sample, and the obtained data are evaluated to determine the differences between the instruments. When the laboratory has different equipment, the method of instrument comparison can be used to carry out quality control, especially when one instrument obtains satisfactory results in capacity verification, which can be used to measure the credibility of other instruments.

2.3......> >

specifically, what are the four measures to ensure safety, quality, efficiency and standardization?

Safety: 1. Formulate reasonable safety rules and regulations and reward and punishment measures. 2, designated persons for safety supervision and management. 3, timely check and eliminate unsafe hidden dangers. 4. Strengthen safety education and improve personnel's safety awareness. 5, regular inspection of hazards. 6, put an end to habitual illegal operation.

quality: 1. raw materials are strictly controlled when entering the factory. 2, formulate reasonable production process, quality inspection standards and reward and punishment measures. 3. Mutual inspection between production processes. 4, product sampling in the production process. 5. Strengthen the sense of responsibility of quality inspectors.

high efficiency: 1. make a detailed and executable production plan. 2. Reasonable arrangement of construction period. 3. The working procedure and process are reasonable. 4. Formulate reasonable reward and punishment measures. 5. The personnel arrangement is reasonable. 6, strengthen the quality inspection process, reduce the probability of waste and unqualified products.

specification: 1. Customize a unified and reasonable standard. 2. Standardize the operation method. 3. Strengthen the training of employees' normative behaviors.

What are the technical organization measures to ensure the project quality?

1) Measures to ensure the accuracy of the positioning, setting-out, axis size and elevation measurement of the proposed project.

2) Relevant technical organization measures taken to ensure the bearing capacity of foundation soil meets the design requirements.

3) Quality measures for various foundations, underground structures and underground waterproof construction.

4) ensure the quality requirements of the main construction process of the main load-bearing structure and the inspection of various materials, semi-finished products, prefabricated components and concrete.

5) Put forward quality assurance measures for the construction operation of new materials, new structures, new processes and new technologies.

6) Quality measures for construction in winter and rain.

7) Quality assurance measures for roof waterproof construction and various decoration

construction.

8) put forward and implement the evaluation and acceptance system of engineering quality.

quality control measures

the company has a sound quality assurance system, and its quality assurance capability meets Party A's requirements. Through ISO system certification, it can continuously improve the quality system and enhance its quality assurance capability. Have the necessary testing facilities, strengthen incoming inspection, and ensure the product quality meets the requirements. Quality control should be focused on people, machines, materials, methods, environment and measurement. A quality information transmission system is established to ensure that quality information can be quickly transmitted to the corresponding departments and quality problems can be dealt with in time. Hold quality work meetings regularly or irregularly to study product quality, find measures to improve product quality, and make quality improvement plans.

what are the quality control measures for building materials?

1. Quality control of materials before entering the site

Read carefully the engineering design documents, construction drawings, construction contracts, construction organization design and other documents related to engineering materials, and be familiar with the provisions and requirements of the documents on material varieties, specifications, models, strength grades, manufacturers and trademarks.

carefully check the quality standards of the materials used, understand the basic properties, application characteristics and scope of application of the materials, and provide reasonable suggestions to the owner on the selection of main materials, equipment and components when necessary. Master the material information and optimize the supplier. Grasping the information of material quality, price and supply capacity, and choosing reliable suppliers can obtain good quality and low price material resources, and help to ensure the engineering quality and reduce the engineering cost. Provide timely information on the materials supplied by the owner; For the materials supplied by the contractor, the order declaration should be examined and demonstrated in time, and the order can only be placed after being reported to the owner for approval.

2. Quality control of materials entering the site

The material list must be consistent. When materials enter the site, it is necessary to check whether the actual situation of the materials present is consistent with the required materials in terms of variety, specification, model, strength grade, manufacturer and trademark, and whether the production number or batch number, model, specification and production date of the products are consistent with the product quality certificate. In case of any inconsistency, it is necessary to request a return or request the supplier to provide materials. Materials with unclear marks can be returned (or sampled). All kinds of raw materials, semi-finished products and components entering the construction site must have corresponding quality assurance materials. Including: production license or use license; Product certificate, quality certificate or quality test report. The certificate of conformity must be stamped with the red seal of the production unit or supplier, and indicate the factory date, production batch number and factory certificate.

3. Quality control after materials enter the site

All raw materials, semi-finished products and components used in the project.