1. Determine the chief project supervision engineer and set up the project supervision organization.
The supervision unit shall appoint competent personnel as the chief supervision engineer of the project according to the scale and nature of the construction project and the owner's requirements for supervision. The chief supervision engineer is the chief supervision of the construction project, and he is responsible for the supervision unit internally and the owner externally.
The personnel composition of supervision institutions is an important content in supervision bidding, which is recognized by the owner in the process of bid evaluation. When establishing a project supervision organization, the chief supervision engineer should establish it according to the supervision outline and the contents of the entrusted supervision contract signed, and make timely adjustments in the implementation of supervision planning and specific implementation plan.
2, the preparation of construction project supervision planning
Construction project supervision planning is a programmatic document to carry out project supervision activities.
3. Standardize supervision.
The standardization of supervision work is embodied in:
(1) Timing of work. This means that all the work of supervision should be carried out in a certain logical order.
(2) The rigidity of division of responsibilities. The supervision of construction projects is completed by experts of different majors and levels. Among them, strict division of responsibilities is the premise of coordinating supervision work, and it is also an important guarantee to achieve supervision objectives.
(3) the certainty of work objectives. On the basis of the division of responsibilities, the specific objectives of each supervision work should be determined, and the time limit for completion should also be stipulated, so as to check and evaluate the supervision work and its effect through the report materials.
4, participate in the acceptance, sign the construction project supervision opinions.
After the completion of the construction project, the supervision unit shall organize the pre-acceptance before the formal acceptance, and communicate with the construction unit in time for the problems found in the pre-acceptance, and put forward the rectification requirements. The supervision unit shall participate in the project completion acceptance organized by the owner and sign the opinions of the supervision unit.
5. Submit the construction project supervision files to the owner.
After the completion of construction project supervision, the supervision files submitted by the supervision unit to the owner shall be agreed in the contract documents of entrusted supervision. If there is no clear stipulation in the contract, the supervision unit shall generally submit: design changes, engineering change materials, supervision mandatory documents, various visa materials and other files.
6, supervision work summary
After the supervision work is completed, the project supervision organization should summarize the supervision work in time from two aspects. The first is the summary of supervision work submitted to the owner, which mainly includes: an overview of the performance of the entrusted supervision contract, the evaluation of the completion of supervision tasks or objectives, the list of office buildings, vehicles and test facilities provided by the owner for supervision activities, and the instructions indicating the end of supervision work. Secondly, the supervision work summary submitted to the supervision unit mainly includes: (1) supervision work experience, which can be the experience of adopting some supervision techniques and methods, the experience of adopting some economic and organizational measures, the experience of entrusting supervision contract execution or how to deal with the relationship with owners and contractors; (2) Problems existing in supervision work and suggestions for improvement.