How many days does it take for Shenyang site to resume work?
Usually within three working days.

To resume work, it is necessary to prepare the construction permit, resume work report, organization design including schedule (long-term shutdown), whether the engineering contract and safety contract need to be extended, all safety permits and other related procedures.

The State Council responded to the joint prevention and control mechanism of epidemic situation in COVID-19, and issued the Notice on Effectively Strengthening the Scientific Prevention and Control of Epidemic Situation and Doing a Good Job in Enterprises' Resumption of Work (hereinafter referred to as the Notice). The "Notice" pointed out that targeted measures should be formulated in accordance with the principles of scientific rationality and moderate effectiveness. It is necessary to do a good job in epidemic prevention and control after returning from the Spring Festival and returning to work to ensure the safety and health of the people; It is also necessary to coordinate and solve the difficulties and problems in the resumption of work and production in time, resume normal production as soon as possible, provide sufficient material guarantee for epidemic prevention and control, and provide strong support for stabilizing the overall economic and social situation.