Current location - Recipe Complete Network - Catering franchise - Infrastructure of Laiyang Economic Development Zone
Infrastructure of Laiyang Economic Development Zone
Laiyangji Development Zone adheres to high starting point planning, high standard construction and high efficiency management, and has completed the construction of more than 80 kilometers of road network and supporting facilities with "five horizontals and five verticals" as the main body. All the built-up areas have achieved "seven connections and one leveling", and social security, financial insurance, education and health services are readily available, which has rapidly improved the carrying capacity of the park and continuously enhanced its charm.

Water supply. At the northeast of Laiyang Development Zone 15km, there is a bathing reservoir with a storage capacity of10.50 billion cubic meters. Laiyang Water Supply Company has a daily water supply capacity of 90,000 cubic meters, water supply pipeline 180 kilometers, and a total water supply area of 36 square kilometers. At the end of 200 1 year, a new water plant with a daily water supply of 50,000 cubic meters will be built. Bath reservoir, the main water source, with a total storage capacity of10.87 billion cubic meters.

Communication. Posts and telecommunications are developed, all-digital optical cable transmission is realized, and broadband access is opened. The total capacity of program-controlled switching equipment in the city has reached more than 900 thousand lines, and the transmission is optical cable. At present, color video teleconference system, IC card phone, voice mail, telephone voice service, 600VPN virtual private network, 800 called centralized pay phone, international program-controlled phone, EMS express and other services have been opened. Data communication service: CHINADDN has been opened, which can provide customers with 2.4KBPS-2MBPS digital data private line service. CHINAPAC network is suitable for financial and trade units. CHINANET is interconnected with the Internet and can provide all Internet business services.

Heat. The thermal power plant with an installed capacity of 4.8 MW has completed the planning demonstration, with an annual heating capacity of 4,759,800 Ji Jiao.

Power supply. Laiyang Power Grid is merged into Shandong Power Grid, with a power supply capacity of 6.5438+0.8 million KVA and an annual power supply of over 600 million kWh. At present, a 220kV substation is being built at the southern end of the Economic Development Zone, which will further improve the power supply capacity and quality of Laiyang.

Discharge sewage. Rainwater and sewage are discharged separately, and rainwater is collected through rainwater pipes and discharged into nearby rivers. Domestic sewage of all users in urban areas and industrial sewage meeting discharge standards are discharged into sewage pipelines and incorporated into sewage treatment plants for treatment. At present, the sewage treatment plant with a daily treatment capacity of 40,000 tons in Laiyang City has been put into operation.

Genius. At present, there are 4 key universities, 7 vocational schools and 58 ordinary middle schools, including Laiyang Agricultural College, College of Traditional Chinese Medicine, Laiyang Health School and Laiyang Normal School, and there are tens of thousands of graduates for enterprises to choose from every year. Donglai, Leto, Rice and Heavy Machinery Factory have many technicians and retired technicians for enterprises to choose from.