Lao Wang has lived in Liangjiaying Village for more than 30 years. He used the bungalow facing the street to open a canteen beside Daba Road in Han Qing. "The road is rotten, chaotic and difficult to walk" is Lao Wang's most intuitive impression of this road. "There was a bumpy dirt road in front of the door. It is gray on sunny days, muddy on rainy days, and it is particularly inconvenient to travel. "
Now, Lao Wang is beaming at Daba Road in Han Qing, which has been built and taken on a new look. "Now the road is good, there are more people coming and going, and the business of our store is good."
On April 8, the reporter saw at the scene that Liangjiaying Village is on the south side of the road section, and on the north side is a primary school and residential area. Now the roads are spacious and flat, the street lamps stand tall, and the cars stop in order, which makes the surrounding residents travel smoothly and comfortably.
As the construction unit, Wang Qingqing, director of the Engineering Construction Division of Baotou Urban and Rural Construction Development Group Co., Ltd., said in an interview, "The road project of Han Qing Dam (Jiankang South Road to Jianguo Road) entered the site on August 7, 2020, with a total length of 56 1 meter. In mid-June 2020, road engineering, lighting engineering and traffic facilities engineering will be completed. Resumption of work in March this year 10, and the remaining hardening paving and greening projects are expected to be completed by the end of June. "
The reporter learned that in accordance with the requirements of the overall urban planning of Baotou City in 2020, under the unified deployment of the Municipal Party Committee, the Municipal Government and the Municipal Housing and Construction Bureau, Baotou Urban and Rural Construction and Development Group Co., Ltd. organized and implemented the construction projects of Han Qing No.8 Road, Huayuan Road in Jiuyuan District and Duantou Road in Xihe East Road in Donghe District.
"These three road projects were established in March 2020. Due to the epidemic situation, the start-up time is relatively lagging behind. We give the strength of the whole company, and jointly organize with Jiuyuan District, Donghe District Government and Housing Construction Bureau. In August 2020, the construction of three roads started, and by the end of 1 1, all of them had motor vehicle traffic conditions and were delivered for use. " Wang Qingqing said that in March this year, three roads were fully resumed, and the rest of the projects were completed.
Subsequently, the reporter went to the scene of the road widening and reconstruction of Huayuan Road (Shahe East Road to Erdenii Street) in Jiuyuan District, and saw that the construction workers were laying bricks on the sidewalk, while the motor vehicles passed smoothly on the spacious and flat new road.
Wang Qingqing told reporters that before Garden Road, this road was very narrow, surrounded by many residential quarters and restaurants. It is also the main road connecting Jianshe Road, Shahe Street and Huanghe Street, and the traffic jam is very serious in the morning, middle and evening. "The total length of this road is 860 meters. Originally, there was only one main road 7 meters wide. Now the main road has been increased to 9 meters, adding 4 meters of non-motor vehicle lanes and sidewalks, which can alleviate the traffic congestion problem. "
"After living for so long, I finally look forward to the widening and transformation of this road." "I don't have to worry about the traffic jam after work and I can't go home." "After the road is repaired, you can rest assured that the children can go to school by themselves." The surrounding residents sincerely praised the road reconstruction.
At this time, the remaining hardened pavement, lighting project and greening project are also being carried out in an orderly manner in the road projects of Xihe East Road and Institute Lane in Donghe District. The total length of this road is 745 meters. Before the construction, it was a dirt road, just like Daba Road in Han Qing, which brought a lot of inconvenience to the residents nearby. Last year, road engineering and traffic facilities engineering were completed.
"These three broken roads are important traffic relief roads and important livelihood projects. It is expected to be completed from the end of June to the end of July and will be delivered in full. " Wang Qingqing said that opening three broken roads is only a good start. In the next step, Baotou Urban and Rural Construction and Development Group Co., Ltd. will fully promote the successful completion of various key tasks with a solid working spirit. (□ Reporter Li Na)