A, floor drain installation steps graphic tutorial
1, the newly replaced floor drain will show the effect of the finished product after installation. It's just finished. It hasn't been cleaned yet. Please make do with it:
2. First of all, you need to remove the original floor drain and cut it between the floor tiles with a cutting machine.
3. In the process of cutting, spraying water can better complete straight cutting.
4. After the cutting is completed, knock the floor drain and the cutting part with a hammer, so that there is looseness between the floor drain and the floor tile, and it is easier to take out the floor drain that needs to be replaced;
5. After removing the floor drain, it was found that there were many sundries attached to the floor drain, which led to poor drainage and odor in the bathroom.
6, throw the floor drain aside, and then find a rag to plug into the sewer, a fortress must be sealed, mainly to prevent cement, sand and so on. When cleaning the trench, prevent it from falling into and blocking the sewer.
7, clean up the sand, cement and other sundry.
8. After cleaning, take out the rag and put it in the floor drain to check whether the height of the floor drain is appropriate.
9. If there is no problem, take out a proper amount of waterproof material and mix it evenly. Use waterproof material here, otherwise water may seep into the next layer.
10, and then apply the evenly stirred waterproof material around the groove and the new floor drain.
1 1. Then put the floor drain into the trough. Note that the groove is about 1mm lower than the surrounding floor tiles.
12. After waiting for about 10 minutes, put the filter shaft dipped in water into the floor drain base, and rotate it appropriately to fully combine the silica gel around the filter shaft with the base.
13, put the filter and clean the floor drain.
14, You're screwed.
Second, the floor drain installation matters needing attention
1, the center line of the main core of the floor drain must coincide with the center line of the pipeline to ensure that the product always maintains drainage efficiency.
2. The floor drain should be slightly lower than the ground to avoid water accumulation. The floor drain must be located at the floor.
3. All kinds of foreign objects should be avoided in the whole decoration process, especially the cement slurry entering the pipeline through the floor drain, which can avoid the blockage of the pipeline in the home caused by the entry of decoration garbage.
4. Please properly handle the floor drain packaging to avoid environmental pollution.
The above is a graphic tutorial on the installation steps of floor drain and an introduction to the matters needing attention in floor drain installation. After reading it, do you think it is still possible to fix the floor drain installation? Please follow the above steps and precautions when you install the floor drain yourself. I believe that the floor drain installed by yourself is definitely better than that installed by the decorator.