Juye coalfield is planned to have one of seven pairs of mines. Liangbaosi Mine is the first pair of mines developed by Feikuang Group in the first phase, and Liangbaosi Project in the second phase. The design capacity is 2 million tons per year. If it is 2.4 million tons, the service life is 59.8 years.

The total industrial site of Liangbaosi Coal Mine is 9.6 hectares, and the mine field area is about 9 1km2. The main projects under construction include: raw coal production system, coal preparation plant workshop, belt conveyor trestle, raw coal bunker, coal storage plant, quasi-rail railway station, administrative office building, task interpretation room, lighting room and toilet joint building, 1 10kV substation, staff canteen, single dormitory, domestic sewage treatment station, mine water treatment station, boiler room, material warehouse and industrial building.

On September 1 day, 2065438, Qiao Naichen, deputy director of the Provincial Coal Industry Bureau, led a team to Liangbaosi Energy Company to verify the mine production capacity. Sun, general manager of the group company, Zhai Minghua, deputy general manager, heads of relevant offices and members of the team of Liangbao Temple Company greeted the inspection. Sun introduced the basic situation, production organization and related technical transformation of Liangbaosi Energy Company to the leaders of the provincial bureau. Subsequently, the inspection team conducted an on-site inspection of the relevant post points above and below the well and the relocation village of Yamei Village, and carefully consulted relevant information. Through the audit, the inspection team agreed that Liangbaosi Energy Company has greatly improved its equipment level, ventilation system and transportation upgrading ability through a series of technical transformation, and at the same time, its supporting facilities and engineering facilities are relatively perfect, basically having an annual production capacity of 3 million tons. The provincial bureau will carefully analyze and consider the above factors and complete the audit of the production capacity of Liangbaosi Energy Company as soon as possible.

Liangbaosi Coal Mine is a low gas mine, the third mining area is an abnormal gas area, and the fourth mining area is a key gas control area. At present, the treatment is ok, and the monthly per capita is about 4000. The service life of the other eight mines of Feikuang Group has basically ended. At present, there are new mines in Angelababy, Chenmanzhuang and Liangbaosi 2# wells.