How to check and accept the house decoration after it is decorated?

after the house is renovated, it is not all right. There is another very important thing, that is, the acceptance work. After the acceptance, the decoration company will complete the delivery of the new house. Therefore, the acceptance of the decoration is a very critical work. Only by finding the problems missed in the decoration process in time and negotiating can we avoid losses. So how to check and accept the house decoration, what are the precautions for the house decoration acceptance, what should I do if the decoration acceptance is unqualified, and what is the decoration acceptance standard? Let's get to know it together!

1. How to check and accept the house when it is decorated

1. Check and accept whether there is water seepage in the wall

When checking and accepting the new house, the first thing to look at is the acceptance of the wall, mainly whether there is water seepage in the wall. In addition, we need to see if there is water seepage in the window in rainy days, especially if there is water seepage in the wall below every household, then we should pay attention to it in typhoon days.

2. Is there any crack in the wall

In addition, when checking the wall, besides checking the water seepage, we should also check whether there is any crack in the wall. In addition, if there is a door-shaped crack in the wall, it is likely to be left by the construction elevator, which leads to this phenomenon.

3. It is recommended to check and accept in rainy days

Usually, before handing over the house, the owner is advised to check and accept it the day after it rains, so that if there is water seepage on the wall or window, we can immediately see it and deal with it in time.

4, waterproof acceptance

for the decoration of the room, after the decoration is completed, waterproof acceptance must be done, especially for the kitchen and bathroom waterproof. For some waterproof projects, we must verify the waterproof quality.

5. Conduct waterproof test after acceptance

For our living room, we must make a new waterproof layer on our floor, because it can better prevent water seepage. In order to prevent water leakage in the later period, we must conduct waterproof treatment.

2. Precautions for acceptance of house decoration

1. Whether the objects are damaged

The decoration of a house can be said to be a big project, and many decoration projects are carried out by stages. Some objects, such as ceiling, door frame and paint, are often damaged due to improper construction operation. This requires special attention when the villa decoration is accepted.

2. Whether the hardware parts are loose

The installation of hardware parts mainly depends on whether they are loose, such as sliding rails, whether they slide smoothly and whether they are fixed.

3. Is there a stain

Different decoration materials have their own advantages and disadvantages, so not all decoration materials can get along well. For example, if paint accidentally falls on a wooden board, the stain is extremely obvious. This is the improper operation of villa decoration workers. Check carefully when accepting.

4. Construction of kitchen and bathroom

The acceptance of kitchen and bathroom is a very important link. During the inspection, it is necessary to check whether the faucet interface of water pipe is good, whether the cabinet is installed in place, and whether there will be water leakage or not, otherwise it will be very troublesome to maintain it later.

5. Can the switch sockets be used normally

Switches are indispensable in the decoration of our rooms, so we must test whether the switches are connected and whether each socket can be used normally during the acceptance, otherwise it will bring great trouble to your room.

3. What should I do if the decoration is unqualified?

What should I do if the decoration is unqualified? Decoration acceptance means that when the developer completes the house, the owner can only pay the money and sign it when handing it over to the owner. Decoration acceptance includes indoor, outdoor, water, electricity and heating, etc. You must first accept it and sign the payment. If you find that the decoration acceptance is unqualified, please remind everyone here that you must not sign it if it is unqualified, and you must safeguard your rights and interests.

IV. Acceptance criteria for decoration

1. Acceptance criteria for water supply and drainage pipeline installation

The quality of pipelines and pipe fittings should meet the current standards; Valve installation should be correct and switch should be flexible; After water pressure test, all pipes, valves and joints should be free of water seepage and water leakage.

2. Acceptance standard of electrical engineering

The leakage switch is installed correctly and used normally; The installation and fixation of electrical devices and equipment shall be firm and smooth; Electrical appliance power-on test, lamp lighting test and lamp control performance are good; Switches, sockets, terminal boxes and other devices are in good appearance, insulation devices are free from cracks, and the installation is firm and upright, and the installation conforms to the regulations; The deviation of the terminal boxes of switches and sockets installed in parallel, and the clearance around the panels and boxes of concealed switches, sockets and terminal boxes conform to the regulations; The weak current system has complete functional rights, meets the use requirements, and the appliances are installed firmly and uprightly.

3. Acceptance standard of pasting project

Only after the pasting project is completed and dried can it be accepted; When accepting, check whether the variety, color and pattern of materials meet the design requirements; Wallpaper and wall covering must be pasted firmly, and the surface color is consistent, and there can be no bubbles, hollows, cracks, wrinkles and stains, and there is no glue mark when squint; The surface is smooth, without ripple, wallpaper, wall covering, hanging mirror line, top corner line, batten board, skirting board, batten board, curtain hanging box, at a distance of 1.5 meters, there shall be no obvious gap by visual inspection; Each piece of stitching is horizontal and vertical, and the patterns and patterns at the stitching are consistent, without leaving the seam or overlapping; The corner of Yin and Yang is vertical and angular, and the corner of Yin is overlapped and smooth, and the corner of Yang is seamless; Wallpaper, wall covering edge straight and tidy, can not have paper wool, flying thorn; There shall be no leakage, subsidy and delamination.

4. Acceptance criteria for ornamental design works

Only after ornamental design works are completed and dried can they be accepted; Check whether the varieties, specifications and patterns of ornamental design meet the design requirements when accepting ornamental design works; The ornamental design should be installed firmly, and its quality requirements and allowable deviation should meet the following requirements: the horizontal and vertical allowable deviation of strip ornamental design should not be greater than 3 mm; The allowable deviation of the position of a single ornamental design shall not be greater than 11 mm; The surface of ornamental design should be smooth, with clear patterns and tight joints, and there should be no defects such as cracks, warpage, lack of edges and corners; The surface of the decoration should be smooth, with clear patterns and no cracks.

5. Acceptance standard of suspended ceiling project

The variety, specification, color, basic structure and fixing method of materials used in suspended ceiling project should meet the requirements of relevant design specifications; Cover panel and keel should be closely connected, the surface should be smooth, and there should be no defects such as pollution, cracking, lack of edges and corners, hammer injury, etc., the joints should be uniform, the pasted cover panel should not have delamination, and plywood should not have gouging; The shelved cover panel shall be free of leakage, penetration and warping.

6. Acceptance standard for wooden floor installation

The materials shall meet the requirements of residents and the current product standards; Floor installation (bonding) should be firm, silent and loose; The surface of the wooden floor should be planed and polished, without gouging marks, gouging residues and burrs, and the pattern (wood grain) of the varnished floor should be clear; Joints of parquet floor should be aligned, with the same gap width, clean surface and no glue overflow; The skirting board is closely connected with the floor; The upper edge of the skirting board is straight, and the total height difference should be no more than 3 mm, which is close to the wall without seam.

7. Acceptance standard for construction quality of plastic surface course

Materials, colors and paving should meet the requirements of residents; The surface shall be flat, smooth and wrinkle-free, and shall not be warped or bubbled; The color is consistent, the seams are tight, and the four sides are straight. The degumming place shall not be greater than 21mm, and the spacing between them shall not be less than 511mm. The joint with the pipeline should be tight, firm and smooth; The skirting board is closely connected with the plastic board, and the upper edge of the skirting board is straight, and the overall height difference is not more than 3 mm, and it is close to the wall without seam.

8, plate surface construction quality acceptance standard

The material and pattern meet the requirements of residents, and the product quality meets the national standards and technical regulations; The shop is stuck firmly, not loose, and the ground leveling elevation difference is not more than 1.5 mm; The paving pattern is clear, and there is no stain or pulp mark; Seam straight, pull through seam inspection, deviation is not more than 2 mm; The joint width is not more than 1.1 mm; The joint height difference between blocks is not more than 1.5mm..

the above is about how to check and accept the house decoration, and the matters needing attention in the house decoration acceptance. I hope it can help everyone!