summary of personal work of technical director
Time flies, and 21 years have passed in a flash. Under the leadership of leaders and with the support and cooperation of colleagues, I kept learning theoretical knowledge, summed up my work experience, strengthened my ideological cultivation, strived to improve my comprehensive quality, strictly observed various rules and regulations, and completed various duties of my post. Here, I will report my thoughts and work in this year as follows:
In 21 years, I served as the technical director of municipal engineering in _ _ _ _ District of Beijing and the post of engineering technician in _ _ _ _ _ District of Beijing. The total length of municipal engineering road alignment is _ ____m, including rainwater engineering, sewage engineering and reclaimed water engineering. At this stage, _ _ _ The construction area of the project is about _ _ _ ㎡, and it is now in the stage of pile foundation construction.
as a technical manager, I implement the company's rules and regulations and finish all the management work in the construction on time and in quality:
Technical management: In the coming year, I participated in a series of technical work such as the blue prints.the design work, scheme preparation, technical disclosure, safety disclosure and so on of the _ _ _ project, as well as the resident construction and scheme preparation of the goaf shanty town.
due to the particularity of the _ _ _ _ project, the drawing time was seriously delayed. Even by the end of the project, the formal design drawings of rainwater pipeline, sewage pipeline and reclaimed water pipeline had not yet come out, and the road design drawings were only received when the road bed construction was about to enter. According to the actual situation, I organize relevant personnel to prepare the corresponding technical scheme in time after the blue prints.the design according to the bidding drawings.
There are many difficulties in drawing joint review, scheme preparation, construction organization design and so on without formal construction drawings, as well as in guiding on-site construction. In the construction, due to the lack of the bidding drawings to meet the use function, the project has to spare manpower and energy to investigate the demand of the surrounding users on the construction site < P > for the three pipelines, and then make changes to the drawings according to their needs. For the changes and negotiations that often occur during the construction process, the visa changes that can be made before the construction are signed in time and accurately, while most of them can't be signed before the construction. After the construction is completed, the supervisor will be asked to sign the visa immediately, and all the information in the construction will be synchronized with the construction and filled in and collected in time.
during the construction of municipal engineering in _ _ _ _ in 21 years, it was praised and recognized by the owners and supervisors, which laid a good foundation for the next project in _ _ _.
during the construction of the _ _ _ _ project in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ But after all, I am a professional in industrial and civil architecture, and I can understand the structural drawings and architectural drawings, so I won't bump into them like a fly. I believe that as long as I use snacks myself, I will soon master the skills in housing construction.
quality management: the technical knowledge learned from books and accumulated experience in the past can't meet the actual needs of construction. In the construction, especially in municipal engineering, we are required to treat quality inspection work without being overstaffed. Instead, we should treat our work with a down-to-earth and rigorous attitude. Those who don't understand are good at learning, and those who already know should strive for perfection, because technology is constantly improving and updating. Only through continuous learning, supplemented by refinement and pragmatism, can they be competent for their jobs.
cooperate with and obey the supervision and guidance of the supervision engineer, and strictly abide by the engineering supervision instructions issued by the supervision engineer.
the construction shall be carried out in strict accordance with the specification requirements, and the process management point control method shall be adopted for the quality control of the construction process. Ensure the engineering quality of divisions and subdivisions (units) with the process quality. Those who fail to meet the process quality standards
will be resolutely reworked until they pass the inspection, and then can be transferred to the next process.
seriously implement the "three inspections" system. That is, the initial inspection of the team, the re-inspection of subcontractors and the final inspection of the project department. In the new year, I will make efforts and do a good job from the following points:
1. Strengthen the study of business knowledge and continue to improve the management level: with the progress of the times and the application of new technologies, we must re-educate professional and technical knowledge. Therefore, in the new year, I intend to strengthen the study of professional knowledge first. I believe that as long as you work hard, there will be results. On the other hand, we should actively learn from the advanced points of others, foster strengths and avoid weaknesses, further improve our ideological understanding and broaden our horizons. Of course, while strengthening the study of technology, we should also constantly learn other knowledge, especially the business budget, so as to achieve all-round development and lay a good foundation for future work.
2. Further do a good job in construction management:
In the 21 _ year work, although the project I am responsible for has made some achievements, there are still many shortcomings. In the process of management, I lack the initiative of bold management. In the future, I should strengthen my study and constantly improve my management level, and constantly sum up experience in my work. Make their own abilities better play.
In short, in the new year, I will further improve myself, study and improve the construction management methods and business level, and make contributions to the development of the company.
Summary of Personal Work of Technical Director Part II
21_ years' work is coming to an end. Since I became the technical director of the project, I have been afraid to neglect my work because of my lack of professional skills and management experience, and I have adhered to the working attitude of being cautious, down-to-earth, serious and pragmatic and efficient. According to the actual situation of my own work, I made an analysis and evaluation of my own work, so as to foster strengths and avoid weaknesses in my future work and provide a basis for continuously improving my working methods and improving my work efficiency in the future.
1. Participated in the decoration in the later period of Chenggu site, presided over the foundation acceptance of three buildings in Yan 'an site and the construction of the main structure. At present, the main bodies of the three buildings have all been capped, and masonry construction and decoration will be carried out in the next stage.
2. Various special construction schemes have been worked out and perfected.
Due to the particularity of the project, the change of drawings and the scattered drawing, it has caused many difficulties to the joint review of drawings, the preparation of scheme and construction organization design, and on-site construction. According to the actual situation, the corresponding technical and safety schemes should be worked out in time. And technical and safety disclosure to relevant personnel. Special construction schemes such as Special Treatment Measures for Installation and Pre-embedding, Special Treatment Measures for Filled Wall Masonry, Quality Defects of Concrete Surface and Control Measures have been compiled. Through the combination of these schemes and the three inspection system, the engineering quality has been guaranteed.
3, timely technical negotiation, change arrangement and construction data management
During the construction, due to the lack of the use function of the construction drawings, temporary changes often occur during the construction process. For the changes that can be signed before the construction, they are timely and accurate, while some of them can't be signed before the construction. After the construction is completed, they will be signed immediately.
All the materials during the construction are synchronized with the construction and filled in and collected in time.
4, the disclosure of each process
According to the company's process method for each division of the project, combined with the actual situation of the project site, the corresponding technical and safety disclosure was made to the project management personnel and labor teams in time. Clearly meet the construction standards, so as to carry out quality inspection and control of the process.
5. Prepare and control various plans in time
Combined with the actual situation on site, the general, ten-day, monthly and weekly progress plans are prepared and distributed to the team, and the completion status is supervised and checked every day. The reasons for the unfinished work are analyzed and effective control measures are taken to ensure the construction progress.
6. Quality process management
Since the project started, the quality of the project has been put in the first place. Cooperate with the supervision and guidance of the supervision engineer during the construction, and carry out the construction in strict accordance with the specification requirements. The quality control of the construction process adopts the process management point control method. Ensure the quality of divisional and sub-divisional (unit) projects with process quality, and earnestly implement the "three inspections" system. Those who fail to meet the process quality standards will be resolutely reworked until they pass the inspection before they can be transferred to the next process.
personal work summary of technical person in charge
I graduated from the Department of Woodworking in Engineering and Technology College of _ University in June, 2111. In July, 21_, he was employed by _ Construction Group Co., Ltd., engaged in engineering technology management. It has been two years since graduation, and I have gone through three projects. During this working time, my leaders and colleagues gave me a lot of tolerant support and help, which made me learn a lot of valuable experience in my work and strengthened my confidence in my future work.
when I first came to the company in July, 21 _, at that time, I saw that everything was fresh, and I felt very motivated for my first job. In order to let us know more about the company and adapt to the future work, the company specially conducted a three-day pre-job training for new employees. Through that training, I have a certain understanding of the company's history and culture, as well as a simple study of the company's basic operation process, the company's development process, corporate culture, corporate status quo and some professional knowledge that I have never been exposed to before.
after the training, I was informed by the leader to go to Zhengzhou Dongfeng Nissan Project Department. At that time, the KD library project was under construction. After I came to the project, the project manager arranged the position of technician for me, and asked me to work and study with the technical director and builder at that time. I have gained a lot during this time, which is a great change from a newcomer to a technical worker, which will be of great significance in my career. When I first came to work in the project, I positioned my work as assisting the technical director in his work and constantly enriching myself. While completing the construction survey and setting out of the project, I also assisted the technical director in preparing the construction plan and technical disclosure, and was responsible for the guidance and preparation of engineering technical data, conducting on-site quality inspection together with quality inspection, and assisting the safety officer in implementing, supervising and inspecting the safety work on the construction site.
when I arrived at this KD library project, the foundation and main works of this project had basically finished, but the main work of our civil technicians was to level the ground of the whole factory, and to spread and compact the soil and stones at the ground base. At that time, my main task was to level the site with the builder. Level was needed for leveling. Although I was exposed to level in school, I was not so skilled in using it. Under their guidance, I soon became familiar with the use of the level.
the control line requirements of equipment foundation are very strict, so we can't be careless. Sometimes we have to measure and read several times for one data. In the process of construction setting-out, I have always taken my work seriously with a positive attitude, and I can do my duty in all the work, so as to complete the task successfully. Constantly absorb the experience gained in practical work. Remind yourself not to aim too high, but to be down-to-earth, do more practical things, test your knowledge in practice and gain accumulated experience in the construction site.
Through the on-site construction work, I deeply understand that what I learned in school and the knowledge I learned by rote by looking through norms and regulations are far less firmly remembered than what I actually experienced, and a lot of knowledge can't be learned from books, which is entirely based on my own experience. During this time, I have been reading more and learning more. When I encounter something different from the book in the construction site, I ask the technical director and foreman humbly in time. Although sometimes I can't get a theoretical explanation, it is a good experience. When I first started working, I felt that technical data work, measurement work and quality inspection work were relatively simple, but in fact, I learned a lot, and I always felt that I could. Only when I actually operated, did I find my own shortcomings, and I often got twice the result with half the effort and lacked efficiency. Now there are many practical operations, the methods are mastered, and the experience is gained, so it is handy.
in October, 2111, the new project of Zhengzhou Nissan Project Department was officially started, and we moved to the new project together with the project manager. This time, the project is Dongfeng Nissan's spare parts workshop and comprehensive station building project. In the early stage of the project, I exchanged and analyzed the drawings and general situation of the project with several other civil technicians, and at the same time, we made a series of work arrangements for the project according to the general construction organization design and schedule plan of the project.
The structure of the spare parts workshop in the factory is relatively simple, similar to a large warehouse. There are two firewalls beyond the roof in the middle of the whole workshop, which separates the whole workshop into three independent workshops. The owner of the auxiliary building comprehensive station is the hydropower room as the spare parts workshop, and the two buildings are connected by a cable trench. The comprehensive station room is divided into boiler room, power distribution room and compressed air room. Because I came out to work for a short time, this project is my first complete project, and I was responsible for the whole construction from the beginning of the project. The previous internship and the first KD library project were all involved in the middle of the project.
faced with this brand-new project, I was a little disoriented at first, but with the help of my master and colleagues, I gradually made my own plan on how to construct and arrange this project. From the foundation earthwork excavation of the project, my colleagues and I began to get busy. I participated in the foundation engineering construction for the first time. I didn't know how to deal with many problems, but my colleagues and the master who took me were very enthusiastic. They took pains to explain all kinds of problems to me. Until the end, I was able to finish these tasks alone.
The foundation engineering of the spare parts workshop in the factory is relatively simple, and there is no pile foundation. It is only necessary to control the depth and size of the foundation pit excavation, and then make a reasonable slope. In nearly a month and a half, we have completed all the basic works of the whole factory spare parts workshop and comprehensive station building. As the factory building is a steel structure factory building, its main body is mainly steel members, which mainly involves two relatively high firewalls and masonry structures below 1.211m m. I am familiar with the construction of this part with the experience of the previous project, but I still encountered some difficulties in the construction process, but with the help of my colleagues and leaders, I still successfully completed the task.
in March of 21 _, because the original documenter was about to be sent to other projects, after communicating with the project manager, I began to learn to do engineering data management with the original documenter. The work of engineering librarians is mainly to collect, sort out and manage engineering archives, seriously and truly reflect the progress and quality of all processes on the construction site, communicate with the construction unit, supervision unit and design unit in time, and carefully handle the design drawings and construction during construction.