1. Planning and design stage:
(1) Main preparation contents: construction standards, various hotel positioning, design demonstration of hotel projects, market research, feasibility analysis, functional layout, facilities and equipment configuration, formulation of business ideas and schemes, hotel design and scheme validation, and drawing revision;
(2) Participating in team composition: investors, market researchers, planning designers, hotel preparation and future operators, designers and supervisors;
(3) Project management contents: project background description, target determination, scope planning and definition, sequencing and duration estimation after work breakdown, schedule planning, resource planning, cost estimation and budget, quality assurance and planning;
2. Infrastructure decoration stage:
(1) Main preparatory contents: construction requirements, civil works, equipment installation supervision, indoor and outdoor decoration, road pipe network engineering, environmental protection engineering, infrastructure data archiving, etc.
(2) Participate in the team composition: hotel builders, supervisors, interior and exterior decoration design and construction personnel, and hotel preparation personnel;
(3) project management content: what is the overall plan of purchasing plan and bidding and preparation of a star-rated hotel, contract signing, execution and supervision, various implementation plans, safety plans, project progress reports, progress, cost, quality and safety control, scope change control, production management, site management and environmental control.
3. Preparatory stage for business opening: planning various plans for business opening, organizing and implementing various tasks, personnel recruitment, personnel training, interior decoration and layout requirements, handling various license procedures, establishing engineering files, market research, business plan, price formulation, marketing plan, advertising planning, business management, etc. 1. Be fully responsible for and coordinate the overall planning of hotel preparation projects;
2. according to the needs of the preparatory work, the relevant professionals have the right to participate in the preparatory work of the hotel project;
3. The participation right and decision-making right of relevant preparatory projects under the responsibility of the preparatory work functional department. 1, site selection, land exploration;
2. Market research and hotel positioning to determine the scale and grade of the hotel;
3. Project positioning and feasibility analysis;
4. Planning approval and project approval;
5. Construction application;
6. Hotel design (including commissioned design, conceptual design and budgetary estimate, construction drawing design, expansion design, electromechanical and technical design support, etc.) and budget; Among them, the design is divided into architectural design and indoor and outdoor decoration design);
7. Review, optimization and determination of drawings and handling of all certificates;
8, civil engineering;
9, road pipe network and equipment installation project (including water and electricity, fire protection, etc.);
11. What is the overall plan for the acceptance of individual civil engineering projects and the preparation of comprehensive star-rated hotels?
11, landscaping, indoor and outdoor decoration, decoration; Preparation for business opening (including preparation of personnel, finance and materials, establishment of service system, management system and market system, and handling of licenses);
12, foreign trial operation;
13, officially opened for business. The hotel preparation team is divided into two categories: one is responsible for the preparation of the hotel, and the other is responsible for the opening preparations. Each team has a deputy team leader and the whole team has a team leader. The team leader must be a person who is good at fighting the country, and is a master of strategists, doers, technical experts and leaders. The requirements of professional engineers and technicians in charge of the preparation are as follows:
1. Civil engineer: It is required to have experience in the construction of high-star hotels and be able to handle on-site construction problems;
2. Structural engineer: It is required to have experience in high-rise building structure construction, to control the steel content to the maximum extent under the premise of conforming to the specifications, and to put forward optimization suggestions on the structural drawing of architectural design institute.
3. Water supply and drainage engineer: It is required to have experience in water supply and drainage construction of high-star hotels, be familiar with the reclaimed water system of hotels, know the corresponding construction materials and be able to handle on-site construction problems;
4. HVAC engineer: It is required to have HVAC construction experience in high-star hotels, be familiar with various brands of central air conditioners, be familiar with the selection of pipeline materials and terminal equipment, and what is the basic market price of the overall plan for the preparation of star hotels, and be able to handle on-site construction problems;
5. Electrical engineer: It is required to have experience in electrical construction of high-star hotels, be familiar with the power configuration of high-power equipment such as power distribution, central air conditioning, elevators, pump room equipment, and the experience of the gap between the standard power consumption standard and the actual demand in restaurants, conferences, guest rooms and other business places;
6. Weak current engineer: It is required to have experience in designing and constructing weak current systems in high-star hotels, be familiar with weak current project configuration in high-star hotels, and be familiar with integrated wiring, computer network, program-controlled switches, building automation, automatic fire alarm and fire fighting linkage, security monitoring alarm, RCU intelligent control of guest rooms (including VOD on demand), parking lot management, electronic patrol, wireless intercom, satellite TV, electronic information display, multimedia conference and hotel management. 1. Design master plan
2. Hotel civil engineering control progress node plan
3. Hotel electromechanical, hydropower and weak current engineering control progress node plan
4. Interior decoration engineering node progress control plan
5. Installation engineering plan. Points to pay attention to when making master engineering construction plan:
1. According to the completion time plan of the project, civil engineering and decoration parties are required to make detailed plans.
2. Require the following construction parties: fire control, water supply and drainage, high voltage, weak current (including building control, safety monitoring, intelligent control of guest rooms, conference equipment, integrated wiring, etc.), and HVAC terminal installation, etc., and make their own detailed and feasible construction plans according to the completion plan required by the project and the construction plan of civil engineering and decoration;
3. Equipment manufacturers, such as central air conditioners, elevators, boilers, water storage equipment, swimming pools, saunas, laundry equipment, etc., are required to make plans for equipment installation, pre-embedding, arrival, installation and debugging.