The urban drainage referred to in these measures, refers to the city's industrial wastewater, domestic sewage (hereinafter collectively referred to as sewage) and atmospheric precipitation (hereinafter referred to as rainwater) acceptance, conveyance, treatment, and discharge of behavior.
The urban drainage facilities referred to in these measures include public **** drainage facilities and self-built drainage facilities. Public **** drainage facilities refers to the acceptance, transportation, treatment, discharge of urban sewage and rainwater public **** pipe network, ditch (river), pumping stations and sewage treatment plants and their ancillary facilities; self-built drainage facilities refers to the property owner's own investment in the construction of drainage for the region's pipelines, ditches, pumping stations and sewage treatment facilities. Article III of urban drainage follow the unified planning, supporting the construction, centralized and decentralized treatment, sewage treatment and comprehensive utilization of the combination of principles. Article IV municipal construction administrative department in charge of urban drainage management, its municipal drainage management organization is responsible for the day-to-day management of urban drainage.
Environmental protection, planning, finance, public security, price, urban management and administrative law enforcement departments shall, in accordance with their respective responsibilities, *** with the good drainage management. Article 5 Any unit or individual has the obligation of drainage and protection of drainage facilities, illegal drainage and damage to drainage facilities have the right to report. Chapter II Planning and Construction Article 6 The municipal construction administrative department shall, in conjunction with the planning and other relevant departments, according to the city's overall planning, the preparation of the city's drainage professional planning, reported to the municipal people's government for approval after the implementation of the organization.
District construction administrative departments, development zone management agencies shall be based on the city's drainage planning, organization and preparation of drainage planning within the jurisdiction, and reported to the municipal construction administrative departments for the record. Article VII new construction, alteration and expansion of drainage facilities should be implemented rainwater, sewage diversion; rainwater pipes and sewage pipes shall not be mixed.
Existing drainage facilities do not implement rainwater, sewage diversion, should be in accordance with the principle of rainwater, sewage diversion and gradual renovation.
The urban sewage network does not cover the area and the demand for recycled water in areas of high demand, shall plan and build small sewage treatment plants. Article VIII of the municipal construction administrative department shall, in accordance with the drainage professional planning, the development of urban drainage network, pumping stations, sewage treatment plants and other public **** drainage facilities, the annual construction plan and organization and implementation.
Districts, development zones should be based on the annual construction plan developed by the municipal administrative department of construction, supporting the construction of the corresponding drainage facilities within the jurisdiction. Article IX construction projects should be in accordance with the professional planning of drainage drainage facilities into the project supporting the construction plan, and construction projects at the same time design, construction, put into use at the same time.
The municipal planning department in charge of the approval of the design of the construction project before, shall seek the views of the municipal drainage management organization. Article 10 of the drainage facilities, engineering design, construction, supervision shall implement the relevant national and local technical standards and technical specifications, and the implementation of bidding according to law.
To undertake the design of drainage facilities, construction, supervision of the unit, should have the appropriate level of qualification. Article XI of the completion of drainage facilities, the construction unit should be organized in a timely manner with the participation of drainage management agencies acceptance; without acceptance or unqualified acceptance, shall not be put into use. Article XII of the existing and by the planning of drainage facilities determined by the land, without legal procedures for adjustment, shall not change the use. Chapter III Drainage Management Article 13 In the area covered by the urban sewage network, drainage units and individuals shall discharge sewage into the urban sewage network and its ancillary facilities.
It is prohibited to discharge sewage into the rainwater pipe network or rainwater into the sewage pipe network. Article XIV to the urban sewage network and its ancillary facilities to discharge industrial wastewater, medical sewage enterprises and institutions, sewage treatment plants and sewage will be directly discharged into natural water bodies of the drainage unit, shall apply to the environmental protection department for a sewage discharge license in accordance with the law.
Discharge of industrial wastewater, medical sewage outside the enterprises and institutions engaged in production, business activities, units and individuals, to the urban sewage network and its ancillary facilities to discharge sewage, shall apply to the municipal drainage management agency for urban drainage permit. Article XV of the environmental protection department in the issuance of sewage licenses, should be on the project whether the sewage is discharged into the urban sewage network to seek the views of the municipal drainage management agencies.
The municipal drainage management agencies for the discharge of industrial wastewater, medical sewage enterprises and institutions for access to the urban drainage network procedures, shall check the environmental protection department issued by the sewage license or permit test production certificate. Article XVI of the application for urban drainage permit, shall provide the following materials:
(a) drainage permit application form;
(b) drainage situation (including the scope of business, the amount of water, sewage treatment process, etc.);
(c) drainage facilities plan;
(d) other information that should be provided according to law. Article XVII of the following conditions, the municipal drainage management agency shall accept the application within 20 working days from the date of issuance of urban drainage license:
(a) the setup of sewage outfalls in line with the requirements of urban drainage professional planning;
(b) the discharge of sewage in line with national and local standards;
(c) has been in accordance with the provisions of the construction of the corresponding sewage treatment facilities;
(iv) has set up a special testing well at the discharge point.
Priority drainage households in addition to the conditions of the preceding paragraph, should also have the ability to test the quality and quantity of water and the corresponding testing system.
There is sediment in the temporary drainage of all types of construction operations, enough to cause blockage or damage to the drainage network and its ancillary facilities, in addition to meeting the conditions of the first paragraph, should be constructed pre-sinking facilities.