How to decorate the house
How to decorate the house

A complete decoration process mainly has two aspects, one is the preparation before decoration, and the other is the official start of decoration.

First, the preparation work before decoration

First of all, we should have a general understanding of ourselves:

How much are you going to spend on decorating?

(2) How much energy can be put into the decoration?

What kind of home do you want?

These three points correspond to the three preparations before the renovation, namely, renovation budget, renovation method, renovation demand and style:

1, decoration budget

How much are you going to spend on decorating? You must know this in your mind to teach you how to budget:

Step 1: Estimate the total decoration price.

Step 2: When making a budget, 20% of the total price will be used as a reserve fund, which will not be included in the calculation range, and will be enabled when it exceeds the budget in the later period.

The third step: it is suggested that the decoration expenses are divided into: hard installation expenses, furniture expenses and household appliances expenses; Divided by 2:2: 1.

Step 4: Then make a preliminary estimate of each expense by subtraction.

2. Dyeing method

There are three main ways of decoration: all-inclusive, half-inclusive and open-package, which were just mentioned two days ago?

All-inclusive, half-inclusive and clear-inclusive, and 70% of new houses are decorated with it!

The comparison between the three is simple:

As can be seen from the above figure, half package is more cost-effective.

3. Decoration demand and style

Decoration needs include: occupancy needs, face value needs, comfort needs, and what kind of home you want is in the decoration needs.

You can also tell the designer your own needs and let the designer plan for you, which will be more worry-free and labor-saving.

After the above three items are confirmed, the decoration can be officially started!

Second, the process after the official start

By the way, before the official start of construction, you need to report to the property and pay the decoration deposit ~

1, demolition project

Whether it is the new clothes of rough houses, the decoration of second-hand houses or the transformation of old houses, it is inevitable to modify the layout of huxing.

Therefore, the first step of decoration is to tear down the wall that needs to be rebuilt according to the design drawing.

Attention should be paid to demolishing this wall.

① Non-load-bearing walls can be removed, but they should be confirmed with the property report before removal to avoid unnecessary troubles later.

(2) Whether the load-bearing wall will be dismantled or not is also a cliche. If removed, it will leave a safety hazard.

(3) In an old house, it is best not to tear down the wall at will when the nature of the wall cannot be accurately distinguished.

2. New projects

After demolition, a new wall should be built according to the design drawings: after the new wall is completed, the hydropower transformation will begin. ...

3. Hydropower transformation

Hydropower is a concealed project. Before decoration, it is necessary to determine the location of main furniture and household appliances, plan hydropower lines, slots, installation planning, pressure test and slot sealing.

Be sure to determine the number and exact location of switch sockets, household appliances, lamps, bathtubs, washing machines, etc. Avoid late rework.

In addition, after the waterway reconstruction is completed, a suppression test is needed. Don't miss this step.

If you want to install central air conditioning and fresh air system, you need to install it before hydropower transformation, and install floor heating after hydropower transformation.

Ps: For the renovation of old houses, it is best to do all the water and electricity again. On the one hand, the old waterway circuit adapts to the new life, on the other hand, it is also for safety reasons.

Before or at the stage of hydropower transformation, wall tiles and floor tiles can be arranged for purchase, and the following mud tile projects can be carried out in time after hydropower completion:

4, mud tile project

Mud tile works include: repairing water and electricity pits, leveling the ground, waterproofing, laying floor tiles and walls.

In the mud brick project stage, it is necessary to buy a floor drain, because the bricklayer needs to install a floor drain and cut the floor tiles according to the shape and size of the floor drain.

After the completion of the mud brick project, you can arrange customized furniture service personnel such as cabinets and wardrobes to re-measure the size at home. Especially embedded household appliances, the size of household appliances should be determined at this time at the latest.

Note: Before plastering the wall tiles, you need to say hello to the neighbors downstairs, and do a good job in the closed water test of the bathroom and balcony floor to prevent the floor from being waterproof.

5, woodworking engineering

Woodworking includes the on-site construction and installation of all fixed cabinets in the family, such as:

△ cabinets in the kitchen

△ sideboard in the restaurant

△ TV cabinet in the living room

In addition, there are:

△ dado installation

△ bed

△ Interior door building

And so on. All wooden furniture can be made by carpenters on site. However, if you want to make good results, you must find a master with good craftsmanship!

6, paint engineering

The main work of painting is scraping putty, spraying latex paint, or pasting wallpaper on walls and cabinets before painting.

Before painting

After painting

Pay attention to avoid rainy and humid weather for paint construction ~

Here, the hard part of the decoration has come to an end. Here are some indoor doors, customized cabinets, range hoods, lamps, etc. Install and welcome all kinds of furniture and household appliances:

7, advocate material installation, soft comes into play

Let the master who does hydropower transformation install lamps and switch sockets first;

If the wooden floor is laid, you can arrange merchants to install it at home;

Let custom furniture enter the market one after another;

Install interior doors, curtains, sanitary ware and integrated ceiling in kitchen and bathroom;

Purchased furniture, electrical appliances, soft decorations, etc. Can enter the market!

When it's all over, you can get some air and wait for check-in.

Generally speaking, it takes about 3-6 months to move in with strong ventilation, but after moving in, it is necessary to keep ventilation and release residual formaldehyde.

As for how ventilation can make formaldehyde disperse faster, see the figure below:

This is the detailed decoration process. Did you feel suddenly enlightened after reading it? Don't bother, arrange the decoration quickly!