1, project overview
The project is XXXX, located next to Changqing Avenue, Changqing District, Jinan City. This project has two floors above ground and three floors locally, of which the first and second floors are functional rooms for students' dining room and kitchen; The third floor is the office floor. The first and second floors are 4.5 meters high and the third floor is 4.2 meters high. The building area is 8880 square meters and the building height is 13.65 meters.
2, return to work arrangement
Supervise the production and posting of protective banners and slogans on the construction site, publicize and popularize the knowledge of epidemic prevention and control, and improve the self-protection awareness of construction personnel. The project department shall designate a special person to inform the superior about the documents, notices, epidemic reports and other information about the prevention and control of infectious diseases, and publicize and educate all the personnel on site.
3. Main construction contents after returning to work
First of all, the organization responsible for the project manager shall be established, consisting of technicians, builders, quality inspectors, materials engineers, safety officers and librarians, and the corresponding post responsibility system for safety and quality shall be formulated, and the monthly assessment shall be conducted to ensure the safety and quality of the project.
In management, a quality assurance system based on the project manager has been established. In the process of construction, managers at all levels play their respective roles in their respective posts, and work conscientiously and responsibly to ensure the quality of the project. In the process of construction, the company does not regularly check the quality of the project, and strictly implements relevant codes and standards during the inspection.
4. Main safety risks and control measures that should be taken.
The project department determines the chief engineer responsibility system and strictly implements the "three inspection system". On the basis of strengthening self-inspection and mutual inspection, strengthen the special inspection function, control the process quality by quality acceptance, ensure the process quality by working quality and ensure the overall quality of the project by process quality.
5. Main measures for epidemic prevention and control
In order to implement the relevant requirements of provincial companies on epidemic prevention and control and ensure the safety of XXX employees. During the epidemic prevention and control period, the management of xxx doorman will be increased, and strict entry and exit registration system will be implemented for employees and outsiders who come to work during the epidemic period.
6. Emergency measures
The technical person in charge of the project shall prepare the emergency repair plan according to the emergency repair contents, with detailed requirements and complete contents, and clearly define the responsibilities, measures, funds and the implementation of the time limit plan, and immediately report it to the supervisor and Party A for review. Immediately after the review, organize emergency repair.
The significance of education
The significance of education is to make people understand the responsibilities and obligations of a person to human society. Only when a person understands his responsibilities and obligations can he become a useful person, and only when he completes his responsibilities and obligations can he become a useful person.