buying a house is a happy event, but the renovation of a new house is a headache for many owners. After the renovation, they don't know what details to check and accept. In addition, the owners who buy all private rooms often find the defects of the house after the acceptance. The key to checking and accepting the house depends on the handling of the details. So what should be paid attention to after the renovation and acceptance of the house? Matters needing attention in house acceptance after renovation? The following small series will answer for you.
What should be paid attention to when the house is renovated and accepted?
1. Acceptance of water and electricity
The circuit acceptance mainly depends on where there is no electricity. You can choose to check the sockets one by one with a special electric pen, and then check whether some lights will be on. Acceptance on the water road mainly depends on whether the water flow is stable, whether the faucet is installed firmly, and then whether the water pipe leaks, and then whether the drain pipe is normal, and try to drain it with a basin of water.
2. Acceptance of wall paint
The circuit acceptance mainly depends on where there is no electricity. You can choose to check the sockets one by one with a special electric pen, and then check whether the next lights will be on. Acceptance on the water road mainly depends on whether the water flow is stable, whether the faucet is installed firmly, and then whether the water pipe leaks, and then whether the drain pipe is normal, and try to drain it with a basin of water.
3. Acceptance of tiles
The acceptance of tiles should first look at whether there are cracks on the tiles, secondly look at whether the tiles are stable, and also look at the distance between the tiles and the waist line to see if the overall deviation is too large. If the deviation exceeds the regulations, it is definitely not possible.
4. Acceptance of doors and windows
The acceptance of doors and windows mainly depends on whether the doors and windows are opened and closed smoothly, whether the switches are good, and whether there are noises or strange sounds.
5. Overall effect acceptance
The overall effect acceptance is mainly to compare the renderings, and there should not be too many differences, such as differences in style. The renderings are industrial, but the actual style is far from good, so this will not work, but there is still a certain gap between the actual landing effect and the renderings, because the color and lighting designers of the renderings will use some special computer software to edit them, just like beauty, so there must be a certain gap.
Precautions for house acceptance after decoration
1. Circuit acceptance
Check whether the distance between strong and weak wires is greater than 1.5 mm, and the wires can't be connected. Pull one wire to the end to prevent current from being generated for a long time in the future and causing a fire. The conduit shall be fixed at the bend with a pipe bender, with a length of 211mm. There should be a lock nut at the joint between the conduit and the conduit, and the joint should be glued tightly.
2. Doors and windows
Check whether the windows can be closed tightly. Doors and windows are one of the burglaries at home. Whether there is blockage in the process of dragging, whether there is a problem with the waterproof layer: whether the window slot is easy to seep in rainy days.
3. Waterproofing of the ground
Water-closing test is needed for waterproofing of the ground. The method is to seal the drainage floor drain with plastic bags, and build a small pier at the edge of the floor drain and at the door to prevent water. Then put about 1cm of water, and after 24 hours, see if there is water leakage downstairs. It should be noted that the premise of this test is that you have made it waterproof and tested it before tiling.
4. Brick seams are uneven and the brick surface is uneven
Don't think that you are an amateur, so you can't correct the mistakes of an expert. There are too many shortcomings that can be found with the naked eye, especially in the construction site where tools are misplaced, materials are misplaced, and cigarette butts are thrown everywhere. There are definitely a lot of mistakes that you can find out!
5. Warranty period of the bathroom and kitchen
Cleaning and decoration, when the whole acceptance process is coming to an end, can be cleaned to prepare for moving into a new home. All the furniture is ready, only soft furnishings such as vases need to be added, and furniture such as sofas need to be added, so that when it is ready, the owner can move to a new home.
The above is the related content of "What should be paid attention to when accepting a house after renovation" compiled by Xiaobian. When accepting a house, it is necessary to check whether the circuit, waterway and the whole house meet the expectations, and it is also necessary to conduct a water seepage test on the house.