First, establish and improve the organization, clear job responsibilities.
After our center received the document, the hospital leaders immediately held a meeting to learn the spirit of the document, raise awareness, implement responsibilities, and carefully arrange work to ensure the smooth development of hospital fire safety work.
Fire safety is an important part of our work, and it is a top priority related to the safety of people's property. In this regard, our center has set up a fire safety leading group with the director of the center as the team leader, the secretary as the deputy team leader and the heads of various departments as members, and the general affairs department is fully responsible for the daily fire safety work. Establish and improve fire safety education, training, inspection, safety evacuation facilities management, fire and electricity safety management, inflammable and explosive dangerous goods management.
Second, strengthen the fire safety education and training of employees.
Center to develop safety education and training plan, regular safety education for employees, so that medical staff and all staff understand the undergraduate course room fire danger and fire prevention measures, will call the police, will use fire fighting equipment, master the methods of putting out the initial fire and evacuating patients.
Third, formulate fire fighting and fire emergency plans.
According to the actual situation of the center, formulate fire fighting and emergency plan, and make it clear.
Points for attention in fire fighting and evacuation of patients.
Fourth, self-check the overall fire situation of the hospital.
1. The hospital has a safety exit, and there are no sundries in the corridors and exits in the building.
Make sure the fire escape is clear. There is a sign of "safety exit" at the exit of stairs.
2. Fire fighting equipment: Our center has 1 1 fire extinguishers (among which
5 have exceeded the service life), and the rest are in normal availability; Five fire hydrants are in normal working condition.
3, the hospital oxygen safety, can be operated in strict accordance with the oxygen operation procedures, oxygen cylinder erect and fixed, oxygen cylinder switch, instrument is not leaking, medical staff can often check, keep the oxygen cylinder clean and safe oxygen delivery.
4. There are no high-power appliances in the center, and the current wires and lines are in good condition.
5. Fire safety emergency drills are not in place.
Verb (abbreviation of verb) rectification measures
1, take fire safety as an important task, and the director of the center should personally deploy and personally grasp it. The responsibility for key parts lies with people. Outpatient service is the responsibility of general outpatient doctors; Ward by the ward doctor is responsible for; The logistics department is responsible for the office and staff canteen; The heads of relevant departments are responsible for each floor.
2. The center should establish a fire inspection and disposal system, and the first person responsible for finding fire hazards must handle and report in time.
3. Regularly check the available 1 1 fire extinguishers in the center, and timely replace those that have exceeded their service life.
4, irregularly in the floor to carry out fire safety inspection activities, found that the security risks handled in time, catch out the security risks.
5, in the center to carry out publicity and education activities with fire laws and regulations and common sense of fire safety as the main content, organize all the staff of the center to conduct fire safety emergency drills as soon as possible.
In the near future, the center will rectify the problems found in the self-inspection, and put the fire control work in an important position, and carefully handle the relationship between fire control and benefit, so that all employees of the center can establish the awareness of "fire prevention" and master the knowledge of fire control safety. Ensure that there is no safety accident in the center.
Fire Self-inspection Report 2 According to the spirit of XX issued by XX Fire Bureau, prevent all kinds of safety accidents, especially fires, effectively protect people's lives and property, and create a safe and peaceful social environment for the "two sessions". Our unit has strengthened the fire safety self-inspection, and now the work is reported as follows:
1. Leaders attach importance to the implementation of responsibilities.
In response to the requirements of XXX, my XX leadership team attached great importance to it, convened relevant departments to study subordinates, implemented the system, and put the responsibility on people. Based on the principle of "who is in charge, who is responsible", we earnestly carried out the safety self-inspection work of various departments. At the same time, the recent fire situation in XX was reported at the weekly meeting, and all XXX were required to learn a lesson, be vigilant and resolutely put an end to similar incidents.
2, serious self-examination, eliminate hidden dangers.
Judging from the inspection results, my fire safety in XXX is generally in good condition, and all fire exits are unblocked without blockage. Fire signs and evacuation signs are obvious, fire-fighting equipment is fully equipped, and video monitoring equipment is running well.
3. Further intensify publicity and effectively improve the vigilance of all staff.
(1) Strengthen fire safety publicity in an all-round way, and improve the public security and fire safety awareness of all employees of XXX. Through posters, information electronic screens and other forms of publicity activities, fire safety knowledge has become a household name, effectively creating a good atmosphere for the whole hospital to participate in fire control work.
⑵ Strengthen fire protection training so that all XXX employees can master the fire notification process and the operation of fire protection equipment. First, I can put out the initial fire, report the location, location and contact information of the fire in time and accurately, know how to use the fire extinguisher and know how to deal with the initial fire; Second, they can help themselves to escape, know the evacuation routes and safety exits of their environment at any time, know the dangers of poor evacuation routes and safety exits, safeguard their own fire safety rights and interests, and know how to help themselves and assist XXXXX evacuation in case of fire.
(3) Strengthen the rectification of fire safety hazards to ensure that the problem of "one unblocked" is effectively solved. That is, to ensure that fire safety evacuation passages and exits are smooth, and evacuation signs and emergency lighting are complete and effective.
Through publicity, training and inspection, all employees have improved their awareness of fire safety, improved their ability to deal with fires, ensured foolproof during the "two sessions" and laid a solid foundation for fire control work.
Fire safety self-inspection report 3 Our company was notified on July 8th. On the morning of July 9, our project department held an emergency meeting to deploy fire safety self-examination and self-correction. The meeting was presided over by the project manager Chen, and attended by the safety director, relevant leaders of the project department and safety department and members of the fire control leading group. When arranging the fire safety self-examination and self-correction, the manager stressed that it is necessary to strictly investigate the hidden dangers of fire safety and establish a long-term fire safety and emergency mechanism. On July 9, according to the actual situation of the construction site, the following is a summary of the self-examination and self-correction:
A, fire safety self-examination, found that the problem timely rectification.
Each subcontracting team quickly carried out fire safety self-inspection. The key points of self-inspection are the electricity consumption, fire extinguishers, material warehouses, the use and storage of oxygen and acetylene in the construction site, office space, staff canteen, dormitory and other parts. Whether the flammable materials are stored and the fire escape is clear. Whether the fire control facilities are in good condition and effective, whether the personnel in key positions have received fire safety training, and whether there are fire hazards in the daily use of fire and electricity. The content of industry information mainly focuses on whether the fire safety system and norms are sound.
Self-examination and self-correction began on July 9th and ended on July 10. During the inspection, the following problems were found: 1, and the material list of newly installed prefabricated houses in the second phase of the project was not reported. 2. Of the five newly installed board houses in the second phase, three have no fire extinguishers on site. 3. No fire prevention measures were taken at the edge of the second-stage workers' boiler. 4. Individual fire extinguishers in the first-phase living quarters failed. 5. There is no fire extinguisher in the second-phase staff canteen. 6. It was found that someone was boiling water quickly in the second-phase living quarters. 7. The storage of oxygen and acetylene in the hydropower team does not meet the requirements, and there is no special warehouse for separate storage and no fire-fighting equipment. 8. Cable mopping on the east side of Phase II office.
Rectification: The Project Department has assigned a special person to take measures to rectify the eight problems found in the inspection regularly, and the rectification was completed on June 5438+04, meeting the requirements.
The second is to attach great importance to ensuring that potential safety hazards are eliminated before they occur.
All departments and detachments of the project department attach great importance to it, and pay close attention to the implementation of safety work with the sense of responsibility of "construction safety is more important than Mount Tai, and people's lives and property are above everything else". The project manager will personally lead the team to conduct inspection, effectively refine the safety responsibilities, decompose the responsibilities layer by layer, clarify the standards and norms, truly implement the supervision of fire safety responsibilities to every post, every work link and every responsible person, solve and eliminate the safety hazards before they occur, and ensure the construction safety.
Third, establish a supervision mechanism to implement safety.
All departments and sub-contracting teams of the Project Department strengthen management and supervision. The Safety Section strictly implements the safety responsibility management system, determines the competent leaders, specific responsible persons, specialized institutions and personnel for fire safety supervision, implements the fire safety supervision team, and implements the responsibilities and tasks for fire safety production supervision. Take a variety of ways to carry out inspections and spot checks, notify the departments whose work is not in place, and hold the relevant responsible persons accountable.
Fire safety self-inspection report On the morning of April 16, our project department held an emergency meeting to deploy fire safety self-inspection and self-correction. Guo Manhong, project manager, presided over the meeting. Lin Fuchun, chief engineer, Song Lijun, deputy manager, Liu Guiping, minister of safety, and leaders and key personnel of engineering department, quality inspection department, ministry of materials and equipment and machinery department attended the meeting. When arranging fire safety self-examination and self-correction, Manager Guo emphasized the need to establish a long-term mechanism for fire safety and emergency response.
First, attach great importance to nip in the bud.
All departments and fields of work should attach great importance to it and strengthen organizational leadership. We should pay close attention to the implementation of safety work with the sense of responsibility that "construction safety is more important than Mount Tai, and people's lives and property are above everything else". The project manager personally leads the team to inspect, and effectively refines the safety responsibilities, decomposes the responsibilities layer by layer, clarifies the standards and norms, and truly implements the supervision of fire safety responsibilities to every post, every work link and every responsible person, so as to solve and eliminate potential safety hazards before they occur and ensure construction safety.
Second, supervision is in place and implemented safely.
All departments and work areas should strengthen management and supervision. Security departments should effectively strengthen safety supervision, strictly implement the safety responsibility management system, determine the competent leaders, specific responsible persons, specialized agencies and personnel of fire safety supervision, implement the fire safety supervision team, and implement the duties and tasks of fire safety production supervision. Take a variety of ways to carry out inspections and spot checks, notify the departments whose work is not in place, and hold the relevant responsible persons accountable.
Three, safety inspection, found that the problem on the spot rectification.
Each work area quickly carried out fire safety self-inspection. Self-inspection focuses on the construction site, mixing station, inflammable and explosive materials, equipment and facilities, oil depot and other key parts, all office places, staff canteens and dormitories. Take precautions before they happen.
The contents of self-examination and self-correction mainly focus on whether the fire safety system and norms are sound, whether the safety management and inspection records are complete, whether the fire exits are unblocked, whether the fire-fighting facilities are in good condition and effective, whether there are fire hazards in the daily use of fire and electricity, whether the personnel in key positions have received fire safety training, and whether all kinds of safety weaknesses and deficiencies have been rectified. The time is from April 16 to April 18. Immediately rectify the problems found in the inspection until they meet the requirements; If the problem can't be solved in a short time, strictly abide by it; If there are major hidden dangers, stop immediately.
Four, the key investment, the main station to strengthen the distribution of special care.
In view of the construction site of each work area and key fire-fighting parts such as oil depots and mixing stations, we will increase investment in safety precautions, enrich rescue teams, strengthen rescue equipment, clarify responsible persons, and establish a long-term working mechanism for fire safety emergency.
Verb (short for verb) others
The construction section undertaken by our project department (k109+300 ~ k118+000) does not involve self-correction and self-inspection of civil explosion safety because there is no tunnel and rock blasting operation.
According to the spirit of the 20xx February 65438+February 12 meeting, our project department always pays attention to "safety and security". In order to ensure the safety of all employees in our project department, we firmly established the concept of "safety first, responsibility is more important than Mount Tai". In order to seriously implement the Fire Protection Law of People's Republic of China (PRC), our project department conducted a self-inspection of the fire safety of buildings in our hospital according to the instructions of the school leaders. The self-inspection is now reported as follows:
A, fire safety management:
1, established and improved the organization.
Person in charge of fire safety: He
Fire Safety Manager: Fang Guoguang
2, the implementation of the safety responsibility system.
The fire safety responsibility of each post was formulated, and the person in charge of fire safety and the leader of the safety leading group signed a safety responsibility letter with each responsible person.
3. Establish, improve and implement fire safety rules and regulations.
The fire inspection and patrol system, water and electricity management system, fire safety publicity and education system, fire safety accountability system and fire work reward and punishment system have been established.
4. Our project department is constantly improving the fire fighting infrastructure. The installation, use and wiring of electrical products are constantly standardized, evacuation passages are unblocked, and emergency lights are installed. At the same time, our project department conducted a comprehensive inspection of fire extinguishers on site, disposed of expired and scrapped fire extinguishers, and timely replaced a number of fire extinguishers that met national standards.
Second, do a good job in various inspections and fill in fire safety records.
According to the spirit of the fire department, our project department has carried out daily inspection, weekly inspection and monthly summary of fire safety work, and conducted a comprehensive safety inspection of various facilities on site. At the same time, record the inspection results and ask the inspectors to fill in the inspection records carefully. Really know fairly well, eliminate dead ends and put an end to all hidden dangers.
Three, fire safety publicity and education work:
1. Our project department will incorporate fire safety into the daily teaching content, carry out fire safety theme activities every other month, strengthen the fire safety knowledge of all migrant workers on site, and also carry out "fire drill" activities to let migrant workers know how to save themselves in case of fire.
2. Our project department will set up a fire safety publicity and education activity room in the team, and play a fire-fighting self-help CD to migrant workers in each fire-fighting theme activity, so that migrant workers can receive fire safety education.
3, my project department every time to carry out "fire safety" knowledge answering activities, every time the fire knowledge learning content through the form of papers to let all migrant workers deepen their grasp of fire safety knowledge.
Our project department has made some achievements in fire safety work, but there is still a certain gap from the requirements of the higher authorities. If so, I believe that in the future work, we will continue to work hard, strengthen publicity work, and raise the fire awareness of the whole people; Regularly and irregularly, seriously carry out the fire safety inspection on duty to prevent the fire from happening forever.
Fire Self-inspection Report 6 According to the requirements of the Notice of XXXX Co., Ltd. on Strengthening Fire Safety Management of Construction Sites (Workshops and Bases) to Prevent Fire Accidents (XXXX232), our department formed a fire safety inspection team with the manager of XX Project Management Department as the team leader, the deputy manager as the deputy team leader, and the heads of various departments of Management Department as the team members, and inspected four project departments under the Bridge Project Management Department. The inspection is now reported as follows:
First, strictly implement the fire safety responsibility system to prevent fire safety accidents.
1. Each project department has established a fire safety responsibility system, defined the first person responsible for fire safety, established a fire safety leading group, established a fire safety system on the construction site, and formulated corresponding management systems and operating procedures for the management of fire, electricity and inflammable and explosive materials on the construction site. Each project department has established the account and use plan of safety production expenses as required, and no misappropriation of safety production expenses has been found.
2. The potential safety hazards in the office area and living area of each project department were investigated. Some project departments are short of fire-fighting equipment, which has been rectified and reported to the project management department.
Second, strengthen the management of special operations personnel with certificates.
1. The certificates of special operators on the construction site of each project department are in good condition, and the certificates of operators with fire hazards such as electric welding and gas welding are mainly checked. No unlicensed operator was found, and the maintenance of electrical equipment on the construction site was not timely, and it was ordered to make rectification within a time limit.
2. The examination and approval procedures for hot work on the construction site are perfect. Check the mixing station, beam yard, oil depot, explosive depot, migrant workers' dormitory, canteen and on-site office on the construction site. If the mixing station fails to install lightning protection facilities within a time limit, the oil depot and explosive depot shall be ordered to supplement fire fighting equipment.
3. When checking the fire-fighting equipment in migrant workers' dormitories, it is found that some fire extinguishers are invalid and should be replaced within a time limit, especially the fire signs crossing roads and railways. During the inspection, unqualified fire-fighting equipment is not allowed to be used.
Three, strictly implement the fire safety regulations, eliminate hidden dangers in time.
1. Each project department has formulated a fire safety emergency rescue plan as required, equipped with emergency rescue teams and emergency rescue personnel, equipped with corresponding emergency rescue equipment, organized fire drills, and carried out publicity and training on fire safety knowledge as required, especially for migrant workers to popularize fire safety knowledge such as safe use of fire, electricity, gas and oil, as well as escape and self-help.
After inspection, the fire safety of each project department has no major accidents and is under control, but our management department will intensify supervision and inspection to ensure that no major safety accidents occur.
Fire self-inspection report: 7 XXXXX Hospital conscientiously implemented the spirit of the safety work meeting of the District Health Bureau, put safety production and fire safety work on the daily work schedule, and formulated and implemented various management systems and publicity and education systems. Adhere to prevention first, combine prevention with treatment, and put the responsibility to people and put it in place. The specific self-inspection results are reported as follows:
I. Responsibilities of Work Safety
No major medical safety accidents occurred in 1 and 20xx years.
2, basically improve the medical management system, strictly implement the operation process, no medical errors, medical accidents; No occupational exposure occurred.
3. Medical mistakes should be prevented. Hospitals should set up quality and safety control management committees, departments should set up quality control teams, define the first responsible person of medical safety, and form a "one post and two responsibilities" mechanism. Everyone should sign a safety responsibility book and hold regular medical quality and safety control meetings to ensure that medical errors and accidents do not occur.
4, regularly carry out quality control self-inspection, and rectification of medical accidents within a time limit; Regularly carry out medical technical knowledge training, improve the professional ability of all medical staff, and effectively prevent medical errors and accidents.
5, strictly implement the medical personnel access system, personnel with health technical qualification certificate can mount guard.
Second, the fire safety responsibility work
1, establish and improve the organizational structure, and clarify the work responsibilities.
Fire safety is an important part of our hospital's work, and it is a top priority related to the life safety of employees and patients and the safety of hospital property. In this regard, our hospital set up a fire safety working group in 20xx, headed by the chief executive, with the safety officer as the first responsible person and the directors of various departments as the direct responsible persons, who are fully responsible for the daily fire safety work.
2, strengthen publicity and education, enhance the awareness of fire safety.
Our hospital attaches great importance to fire safety work, and constantly strengthens the training of fire safety knowledge for all employees. Through the combination of centralized learning and decentralized learning, we actively learn fire safety-related knowledge, effectively improve the fire safety awareness of all employees, establish the concept of "everyone is a firefighter, and everyone is responsible for fire control work", and ensure that every employee can skillfully use fire-fighting equipment, have the common sense of first-time fire fighting, escape and self-help, and effectively implement fire safety work in daily management.
3, seriously carry out fire safety self-examination, troubleshooting to eliminate fire hazards.
According to the hospital system, the logistics department should conduct a comprehensive self-inspection on the electrical and gas facilities such as fire hydrants, fire extinguishers, safe passage signs, power supply lines, liquefied steam tanks, water dispensers, computers, printers, sockets and hubs in the corridor of the hospital every week. Over the past year, no phenomena such as aging, bare power supply lines, burning inflammable and explosive articles, and overload operation of electrical equipment have been found.
In short, for hospitals, medical safety and fire safety are the most important. Carry out the policy of "safety first, prevention first and comprehensive treatment", strengthen supervision and inspection and daily management, improve the safety responsibility consciousness of all employees, effectively nip in the bud, and create a safe and harmonious working and medical environment for hospital employees, children and parents.
Fire Self-inspection Report 8 According to the requirements and deployment of the Notice on Doing a Good Job in Winter Safety and Carrying out the "Four Capabilities" of Fire Safety issued by the Logistics Department, our department conducted a self-inspection of fire safety within the department and fire equipment in the corridor on the seventh floor. The fire inspection of our department is now reported as follows:
First, establish and improve the organization, clear job responsibilities.
Fire safety is an important part of the work of financial institutions, and it is a top priority related to the safety of bank property and the safety of employees' lives. In this regard, our department has set up a fire safety working group with the department head as the team leader, the safety officer as the first responsible person and the rest of the employees as the direct responsible persons, which is fully responsible for the daily fire safety work. In the spirit of being responsible for our property and employees' lives, we put fire safety in an important position.
Two, strengthen publicity and education, enhance the awareness of fire safety.
Our department attaches great importance to it. Through the combination of centralized learning and decentralized learning, all employees actively learn fire safety-related knowledge, effectively improve the fire safety awareness of all employees, establish the concept of "everyone is a firefighter and everyone is responsible for fire control work", and always keep in mind the importance of fire safety work.
Three, seriously carry out fire safety self-examination, investigation and elimination of fire hazards.
(1) Self-inspection of fire control safety of institutions
According to the requirements of the document, all employees were immediately mobilized to conduct a comprehensive self-examination of the power cord, water dispenser, computer, printer, socket and hub, and no phenomena such as aging, exposure, burning, inflammable and explosive articles and overload operation of electrical equipment were found. After work, the power supply of all electrical equipment and machines in our department will be checked by two people to ensure that they are completely disconnected.
I'm in room 703 on the seventh floor of the headquarters. The wet automatic sprinkler system and smoke detector are installed in the department room, and the appearance is intact and the function cannot be tested.
(2) Self-inspection of fire fighting equipment in corridor on the seventh floor
Our department has inspected many fire safety facilities, such as fire hydrants, fire extinguishers, safe passage signs, wet automatic sprinkler systems, smoke detectors, etc. It's in the corridor on the seventh floor. The inspection results are as follows:
1, fire hydrant
There are four fire hydrants in the corridor on the seventh floor, and the internal equipment is in good appearance. However, the instructions for the use of fire hydrants printed on the fire hydrant box cover are illegible, and most of the handwriting is illegible.
2. Fire extinguisher
There are six portable dry powder fire extinguishers in the corridor on the seventh floor, which are in good appearance. The hands of the pressure gauge all point to the green area, and there is no need to inflate.
3, other fire fighting equipment
The smoke detector is intact in appearance and normal in function.
Wet automatic sprinkler system, the appearance is intact, the function can not be tested.
The appearance of the safe passage sign is intact and the indication is correct.
The appearance of the fire telephone jack is intact, and the function cannot be tested.
The appearance of fire emergency lighting is intact, the function is normal, and it can start automatically after power failure.
The appearance of the fire display panel is intact and the function cannot be tested.
Four, strengthen supervision and inspection, strengthen daily management.
In the future, our department will continue to strengthen the training of fire safety knowledge for all employees, so as to ensure that every employee can skillfully use fire-fighting equipment, have the common sense of first-time fire fighting and escape and self-help, and effectively implement fire safety work in daily management.
In a word, fire safety is a long-term and important work, which is related to our property and the life safety of employees. We are determined to implement the policy of "prevention first, combining prevention with elimination" under the guidance of the Notice on Doing a Good Job in Fire Fighting in Winter and Building Four Capabilities of Fire Safety, strengthen daily fire management, improve the fire awareness of all employees, and effectively nip in the bud.
Secondly, check the outlets under its jurisdiction.
1. The alarms installed in all business outlets are in good condition and in good working condition.
2. On-the-job staff can answer calls from the public security department 1 10 and related leaders.
3. The buttons of alarm devices of all outlets are installed in the convenient places of accountants and cashiers, and are in normal working condition.
4, first-aid equipment such as mace, lime powder, fire extinguishers, etc. are placed in the cabinet that personnel can get at hand.
All the outlets were raided by two people, and no one was found. The side doors of all exits are locked. There is no side door opening. At the same time, people from other units were not found to enter the counter.
6. No white stripes were found.
7. All handover procedures at noon are in compliance.