Current location - Recipe Complete Network - Catering industry - Construction organization design of a hotel decoration project in Jiangsu?
Construction organization design of a hotel decoration project in Jiangsu?

What is the specific content of the construction organization design of a hotel decoration project in Jiangsu? Here, Zhongda Consulting will answer your questions.

Chapter I Construction Organization Design

Compilation Description of Section 1

Compilation Scope of 1-1

The following area of XX Hotel in Jiangsu Province

1, semi-basement and all the interior decoration on the first floor, including spiral stairs and elevator hall.

2. All exterior wall decoration, roof and parking lot.

3. Semi-basement, first floor, curtain wall of sightseeing elevator, lighting ceiling, main entrance shed and awning outside the restaurant.

4. All areas in Area I (1-8 axis crosses H-K axis for decoration)

1-2 is compiled according to

1, the bidding documents and bidding instructions for building decoration of XX hotel, and the bill of quantities and documents.

2. Construction drawing of indoor and outdoor decoration design of XX Hotel designed by XX in Shenzhen.

3. Current national, provincial and municipal construction and acceptance specifications and quality inspection and evaluation standards.

Code for Construction and Acceptance of Building Decoration Engineering (JGJ73-91)

Code for Construction and Acceptance of Building Installation Engineering

Code for Fire Protection Design of Building Interior Decoration (GB-51122-95)

Natural Granite Stone Building Plate (JC-215)

Glass Curtain Wall Engineering Technology. P > Building Curtain Wall (JG3135-1996)

Technical Specification for Safety in Construction Operation (JGJ81-91)

Technical Specification for Safety of Temporary Building Electricity in Construction Site (JCJ46-88)

4. New technologies, new processes and new materials to be popularized.

5. Standard program documents and supporting documents of ISO9111 quality management system of Shenzhen XX Decoration Engineering Company.

6. field investigation.

1-3 compilation points

1. This decoration project must meet the standard requirements of a four-star hotel. The decoration project of this bid section is the focus of the whole hotel decoration. Grasping the main construction methods and technical measures, preventing common quality faults and ensuring the engineering quality to reach the provincial excellent standard are the key points of the decoration construction scheme of this project.

2. The decoration engineering in this bid section requires high technology and tight time limit. It is the key point to consider in this decoration engineering construction scheme to carefully study the progress plan, properly arrange the process interspersed, grasp the total time limit, the control of the total progress plan and the implementation of the phased plan, and ensure the completion of the time limit ahead of schedule.

3. The management of the whole construction process of the decoration project in this bid section, the reasonable site layout and rigorous facade protection, as well as cross construction, flow operation, safe electricity consumption, mechanical equipment, site fire prevention, site civilization, environmental pollution, and ensuring safe production and civilized construction to meet the standards are important components of the construction scheme of this decoration project.

4. To achieve the (above) expected goal of the decoration project construction, the organizational structure of the project department, the composition of the project department, the preparation of resource allocation, the determination of technical scheme, the implementation of plan, the implementation of measures, the perfection of system, the management in place and the tacit understanding of cooperation are the important guarantees for the quality, time limit, safety and civilized construction of the decoration project, and also the key points for studying the construction scheme of the decoration project. We are very grateful to the owner for inviting our company to participate in the bidding for the renovation (expansion) project of * * * Hotel. If we are lucky enough to win the bid, we will further consult the owner, design engineer and supervision engineer with an open mind. This decoration construction plan will be supplemented and revised in detail during construction, and guided by this, we will carefully organize and construct it, carefully accept the inspection and supervision of superiors and local competent departments at all levels, and be fully responsible to the owner for the quality, time limit and safety of the project.

for more information about the engineering/service/procurement bidding, and to improve the winning rate, you can click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd