Tender number:
Bidder:
Tendering agency:
20 12 March
catalogue
I. Overview of the Project
1, construction site
2. Construction scale
3. Plan the construction period
4. Bidding scope
5, bid division
Second, the bidding process
1, bidding agent
2, the tender announcement and tender documents for sale
3. Record of bid opening
Third, the bid evaluation work
1, review procedure
2. List of Bid Evaluation Committees
3. Bid evaluation work
(1) Preliminary review
(2) Detailed review
(6) Clarification and revision of bid documents
(7) Recommend successful candidates.
(8) Write the bid evaluation report
Iv. evaluation criteria
Verb (abbreviation for verb) evaluation result
Attachment of intransitive verbs
Hebei Province
Xx bidding
Bid evaluation report
I. Overview of the Project
1, construction site:
2. Construction scale:.
3. Planned construction period: the estimated commencement date is 2065438+April 2002, the construction period is 5 months, and the defect liability period is 24 months.
4. Bidding scope: prefabrication and installation of concrete guardrail in the central separation zone of this project.
5. Bid division: This project is divided into one bid.
Second, the bidding process
1, bidding agent
According to the bidding scheme of the Ministry of Communications, the tenderer XX is appointed as the bidding agency to organize the bidding work of this project.
2, the tender announcement and tender documents for sale
The pre-qualification announcement of this project was released on 201kloc-0/65438+10 on October 24th at the same time in Hebei Comprehensive Bidding Network (), Hebei Provincial Communications Department Open and Transparent Operation Network of Administrative Power () and Hebei expressway Administration Bureau (). After prequalification, * * * 12 bidders passed the prequalification. From February 3, 2065438 to February 7, 2065438, eligible bidders purchased the 12 bidding documents.
3. Record of bid opening
20 12 At 0: 00 on March 6th 12, the tenderee and the tendering agency held the bid opening ceremony in the conference room on the 2nd floor of Tongxiang Hotel14, Huanghe Avenue, Shijiazhuang City, Hebei Province. By 20 10: 00 on March 6th, the bid opening ceremony was held. The tenderee and the tendering agency presided over the bid opening meeting, the discipline inspection team of key projects of Hebei Provincial Department of Transportation supervised the whole process of bid opening, and the notary office of Zhao Yan, Shijiazhuang City, Hebei Province conducted on-site notarization of the whole process of bid opening. After the bid opening, all bidders shall sign the bid opening result for confirmation. See the bid opening record for details.
Third, the bid evaluation work
1, review procedure
(1) Formal review and response review
(2) Clarification and revision of bid documents;
(3) Recommend the successful candidate;
(4) Write the bid evaluation report.
2. List of Bid Evaluation Committees
The bid evaluation committee consists of four bid evaluation experts and 1 tenderee representatives randomly selected from ZZ unified bid evaluation expert database (see the list of bid evaluation committees for details). At 05: 00 on March 6th, 20 12, the bid evaluation committee conducted a bid evaluation on this project according to relevant laws and regulations and the bidding documents. The bidding center of Hebei Provincial Department of Transportation, the discipline inspection team of key projects of Hebei Provincial Department of Transportation, and the discipline inspection and supervision office of expressway Administration of Hebei Province supervised the whole process of bid evaluation.
3. Bid evaluation work
The bid evaluation committee first democratically recommended XX senior engineer as the chairman, and the chairman presided over the bid evaluation. First of all, the bid evaluation committee listened to the general introduction of the project by the tenderer. After carefully studying the bidding documents, the bid evaluation committee conducted a bid evaluation according to the bidding and evaluation methods.
The bid evaluation adopts the reasonable low price method. The bid evaluation committee shall grade the bidding documents that meet the substantive requirements of the bidding documents according to the grading standards specified in Paragraph 2.2 of this chapter, and recommend three successful candidates in the order of the scores from high to low, except that the bidding price is lower than its cost. When the comprehensive scores are equal, the lowest bid evaluation price is preferred; If the bid evaluation prices are equal, the tenderer may give priority to the bidder with higher credit rating assessed by the provincial transportation department where the project subject to tender is located, or give priority to the bidder who submitted the bidding documents.
(1) Preliminary review
According to the bid evaluation method, the bid evaluation committee made a preliminary review of all bid documents submitted by bidders.
After review, * * * 9 _ bid documents passed the formal review and responsive review. For more information about the review, please refer to the first envelope form review and response review form.
Of all the 12 bidding documents that participated in the evaluation, 3 failed the preliminary evaluation. The reasons why the bidder failed the formal evaluation and the responsive evaluation can be found in the attached table of the bid evaluation report-Deviation Table of Formal Evaluation and Responsive Evaluation.
(2) Detailed review
According to the provisions of the bid evaluation method, the bid evaluation committee will make a detailed evaluation of the bid documents that have passed the preliminary evaluation.
For the list of the top three bidders with the bid evaluation price score, see the bid evaluation price score calculation table.
(3) Review of affiliated enterprises
Upon examination, all bidders have no affiliated enterprises.
(4) Clarification and revision of bid documents
The bid evaluation committee did not ask for clarification and amendment of all bidding documents.
Iv. evaluation criteria
(1) Preliminary evaluation criteria: See the pre-attached table of bid evaluation method in bidding documents.
(2) Composition and scoring standard of bid evaluation price score: See the pre-attached table of bid evaluation method in bidding documents.
Verb (abbreviation for verb) evaluation result
The bid evaluation committee ranks the bid evaluation price scores from high to low, and recommends the top 3 bidders with bid evaluation price scores as the successful candidates. See-Recommended List of Successful Candidates for details.
The list of successful candidates is as follows:
List of successful bidders
Estimated bid price of the successful candidate recommended by serial number (yuan)
1XX 43089880
2XX 43 177600
3XX 43 175432
Attachment of intransitive verbs
(1) Sign-in Form for Participants in the Bid Opening Meeting
(2) Record of bid opening
(3) List of Bid Evaluation Committees
(4) Form Review and Response Review Form
(5) Evaluation price score calculation table
(6) List of recommended candidates for winning the bid
(7) Schedule of Bid Evaluation Report-Deviation Table of Form Review and Response Review
Chairman of the Bid Evaluation Committee:
Members:
Section 30 Project
XXX installation bid evaluation Committee
2065438+March 6, 2002