Current location - Recipe Complete Network - Catering industry - Five model sales contracts for machinery and equipment

Model sales contract for machinery and equipment 1

Party A: ID number:

Party B: ID number:

Since Party B owns an old set

Five model sales contracts for machinery and equipment

Model sales contract for machinery and equipment 1

Party A: ID number:

Party B: ID number:

Since Party B owns an old set

Five model sales contracts for machinery and equipment

Model sales contract for machinery and equipment 1

Party A: ID number:

Party B: ID number:

Since Party B owns an old set of equipment for producing lime milk, Party A needs to buy the above equipment from the seller to produce lime milk. Based on the principles of voluntariness, equality, mutual benefit, honesty and credibility, both parties have reached the following contract terms through full friendly negotiation for common compliance.

I. Subject matter of the contract

The object of this contract is the old equipment used in the production project of quicklime. See the annex to the contract for the quantity, list and new contents of the specific equipment list.

Second, the contract price

1. The total contract price is RMB 300,000 (in words: RMB three hundred thousand).

2. The total contract price includes the equipment and auxiliary equipment listed in the annex to the contract. Both parties confirm that the total contract price is the current price of the equipment listed in the annex, and both parties have confirmed the rate and quantity of new equipment. The total contract price is only the price of the equipment itself, excluding expenses such as disassembly, packaging, transportation, installation and taxes.

This contract does not include the unit price, but only the total price.

Third, payment

This contract

The total contract price stipulated in Article 2 shall be paid by the buyer to the seller through the bank in the following ways and proportions.

1. One third of the total contract price, namely 100000 yuan (in words: one hundred thousand yuan), together with Party A's unpaid lime powder of 60000 yuan (in words: sixty thousand yuan), * *160000 yuan (in words: sixty thousand yuan), shall be received from Party B.

2. One third of the total contract price, 65,438+000,000 yuan (in words: one hundred thousand yuan) shall be paid to Party B within three months after Party A's equipment installation and debugging are completed and qualified products are produced;

3. One third of the total contract price, namely 100000 yuan (in words: one hundred thousand yuan), shall be paid to the seller before _ _ _ _.

Party B only provides the receipt of the equipment, not the invoice of the above money.

Four. Overdue payment

If Party A fails to make payment within the time limit stipulated in the contract, the four parties shall pay the resulting liquidated damages, which shall be calculated at 3% of the daily arrears until the payment is completed.

Verb (abbreviation of verb) Equipment delivery and acceptance

Party a pays off

After the first payment, both parties shall check and inspect the quantity of equipment on the site of Party B's factory according to the equipment list, and the delivery shall be deemed to be completed after the check and inspection.

Six, loading and unloading and transportation

Party A shall be responsible for the loading, unloading and transportation of the equipment and bear the corresponding expenses, and Party B shall provide assistance in terms of personnel and tools. The risk of damage or loss during loading, unloading and transportation shall be borne by Party A. ..

Seven. Other agreements

After Party B delivers the equipment to Party A, Party A hires Party B to install and debug the equipment until qualified products are produced. During the employment period, Party A shall provide accommodation and pay the monthly salary according to the monthly salary standard. After the equipment is normal, both parties will negotiate whether to continue to use it.

Eight. force majeure

Nine. Handling of disputes

Disputes arising from the performance of this contract shall be settled by both parties through consultation or mediation by relevant departments; If negotiation or mediation fails, a lawsuit shall be brought to the people's court according to law.

X. supplements and annexes

The list of equipment for sale is an annex to this contract, an integral part of this contract and has the same legal effect as this contract.

XI。 Validity of contract

This contract shall come into effect as of the date of signature by both parties. The original of this contract is in duplicate, each party holds one copy, which has the same legal effect.

Signing place:

Signature of Party A: Signature of Party B:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model sales contract for machinery and equipment II

Party A (Seller)

Party B (Buyer):

According to the Contract Law of People's Republic of China (PRC) and relevant laws, Party A and Party B reach the following contract through negotiation:

Chapter I Subject Matter of Contract

Article 1 Requirements of the subject matter of the contract:

1, equipment name, brand and model:.

2. Place of origin, manufacturer and date of production:.

3, quality standards:

According to the original quality standard, that is, the manual shall prevail. The quality standards specified in the specification shall conform to national standards, industry standards, general standards or specific standards for contract purposes.

Chapter II Contract Price and Payment Method

Article 2 Contract Price:

1. The total contract price of the equipment listed in this contract is RMB:

2. The contract price includes: the price of main equipment (including 200m pipe fittings).

Article 3 Payment method:

First payment: pay 100% of the total contract price within 20 working days after the contract is signed.

Chapter III Equipment Acceptance

Article 4 Equipment acceptance procedures:

1. After the equipment enters the site, it will work normally within 20 working days, and Party B will pay all the money.

2. If the equipment fails to work normally within 20 working days due to various reasons, Party B shall pay Party A a monthly rent of 23,000 yuan, and Party B shall be responsible for the equipment entrance fee and Party A shall be responsible for the equipment appearance fee.

Chapter IV Others

Article 5 This contract shall come into effect as of the date when the authorized representatives of both parties sign and affix their official seals.

Article 6 This contract is made in quadruplicate, two for Party A and two for Party B. ..

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model sales contract for machinery and equipment

Supplier: (hereinafter referred to as Party A)

Demander: (hereinafter referred to as Party B)

According to the bidding documents of the annual agreement supplier procurement of office equipment (No.:GLZFCG20-A0060) organized by the Procurement Management Office of Guilin Municipal Government, the bid-winning notice, the supply agreement and the supply notice of AgreementNo. 1, the supply and demand sides reached the following agreement on the supply of the bid-winning equipment:

1. Name, trademark, model, manufacturer, quantity and amount of the goods.

2. Delivery time: before _ _ _ _ _ _ _ _.

Three. Technical standards for quality requirements, conditions and time limit for the supplier to be responsible for quality: the goods provided by the supplier must meet the requirements of the bidding documents, meet the national testing standards and ex-factory standards, and be responsible for installation, debugging, maintenance and other services. Safe installation, normal operation after use, quality assurance in line with factory regulations and bidding commitments.

4. Place and method of delivery: The supplier is responsible for delivering the goods directly to the place designated by the buyer free of charge.

Verb (abbreviation of verb) mode of transportation, port of arrival and cost: the supplier shall be responsible.

Six, packaging standards, packaging supply and recycling:

Seven, acceptance criteria, methods and time limit for raising objections:

① Have all the functions and technical parameters listed in the manual or product introduction provided by the supplier;

② Acceptance contents include: quantity, appearance, debugging performance, technical parameters, various explanatory materials, certificate of approval, etc.

Eight. Quantity and supply mode of spare parts, accessories and tools: The supplier shall deliver all spare parts, accessories, operating instructions and delivery list to the buyer.

Nine. Settlement method and time limit: the supplier of the agreement shall provide original materials such as purchase declaration, agreement transaction notice (with purchase list), contract, acceptance certificate and invoice. , and submit it to the tendering company for verification, and then send it to the procurement office for payment related procedures (within ten days after the end of each month).

X after-sales service commitment: the supplier shall fully fulfill the service requirements specified in the bidding documents and all commitments in the bidding documents.

XI。 Liability for breach of contract: If the variety, model, specification and configuration quality of the equipment delivered by the supplier do not meet the standards stipulated in the contract, the buyer has the right to reject the goods. If the supplier fails to deliver the goods in time, the supplier shall pay the buyer a penalty of one thousandth of the total payment every day.

Twelve. Settlement of contract disputes: disputes arising from the performance of this contract shall be settled by both parties through consultation. If negotiation fails, either party may apply to the Arbitration Commission for arbitration until a lawsuit is brought to the people's court in the place where the contract is signed.

Thirteen. Other agreed matters: meet the requirements of bidding documents and bidding commitments.

14. This contract is made in quadruplicate, one for the supplier, one for the buyer and two for the procurement management office of Guilin Municipal Government, all of which have the same legal effect.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model sales contract for machinery and equipment

Party A:

Party B:

According to the needs of its own business, Party A and Party B have reached the following (tool) equipment purchase and sale agreement through friendly negotiation:

1. Party A orders the following equipment and tools from Party B (the list is attached, which is an effective part of this contract): Total amount: RMB amount in words: The above price includes: √ long-distance freight, √ short-distance freight, √ on-site loading and unloading fee, √ installation fee, √ taxes and √ other fees:

2. Installation:

2. 1 Party B shall be responsible for the installation and debugging of the equipment sold, and provide Party A with equipment use training;

2.2 Party A shall prepare the foundation according to Party B's requirements and be responsible for the installation of the power cord; Party B shall send personnel to assist in the above work, and the equipment installation can only be carried out after ensuring the smooth installation.

2.3 The warranty period of the equipment is years. In case of product quality problems, Party B shall be responsible for free maintenance and provide necessary spare parts (except wearing parts), and other equipment or tools shall be implemented according to the standards specified by the manufacturer.

2.4 Party A shall carry out daily operation, use and maintenance in strict accordance with the requirements of the equipment operating instructions. Equipment damage caused by improper operation and use of Party A's personnel is not covered by the warranty, but Party B shall assist in solving it;

2.5 Party A is obliged to arrange personnel to assist Party B during equipment installation.

3. Delivery, acceptance and after-sales service:

3. 1 The delivery date of the main equipment (including) in this contract is:

3.2 After the arrival of the goods, Party A shall check the quantity, model and quality of the equipment according to the contract, sign the sales slip of Party B or issue a receipt to Party B, and affix the official seal;

3.3 Party A designates the equipment signer of this contract as:, the certificate number as:, and the contact information as: the person in charge of equipment installation designated by Party B as:, the ID number as:, and the contact information as:

3.4 The installation and commissioning time of Party B is expected to be working days;

3.5 After the installation and debugging of Party B's equipment is completed, Party A shall accept it within working days; If Party A fails to receive the goods within this period due to Party A's reasons, it shall be deemed that Party A has received the goods, and Party A shall not change the payment method.

3.6 Party B shall deliver and install the equipment in strict accordance with the contract, with one day's delay or deduct RMB from the total installation payment of Party A;

3.7 Party B's after-sales service is as follows: (quality, quality assurance, maintenance service, regular service, training, etc. )

4. Payment method:

After the Contract is signed and sealed by both parties, both parties shall make payment in the following ways:

4. 1 After signing the contract, Party A shall pay the down payment: RMB; (In words:)

4.2 After the major large-scale equipment (including) of this contract arrives, Party A will pay RMB again, and Party B will issue a full invoice within days;

4.3 Party A shall pay the balance RMB within months after the completion of equipment installation and commissioning;

4.4 Party B's collection account is:

Name: Bank: Account Number:

5. Liability for breach of contract:

5. 1 Party B shall supply the goods according to the contract, and be responsible for installation, debugging and training to ensure that the equipment sold can be used normally and meet the needs of Party A. Within five days after Party B installs, debugs and trains and issues all invoices, Party A shall pay according to the contract. If Party A fails to pay or defaults on the payment, Party A shall pay liquidated damages to Party B at the rate of ‰ of the total contract amount every day.

5.2 If Party B fails to install and debug as scheduled, conduct training in time, or meet Party A's business needs and provide post-maintenance services, Party B shall compensate Party A for the losses caused thereby and pay liquidated damages to Party A at the rate of ‰ of the total contract price every day.

6. Party A and Party B shall consciously abide by this contract, and bear corresponding legal responsibilities in case of breach of contract. If one party fails to perform the contract due to force majeure, it shall notify the other party in time and provide relevant evidence within days, and both parties shall negotiate to amend the contract separately.

7. In case of any dispute during the execution of this contract, both parties shall settle it through consultation on the principle of facilitating cooperation. If negotiation fails, a lawsuit shall be brought to the local court of Party A for adjudication.

8. This contract is made in quadruplicate, two for each party, and shall come into effect as of the date of signature and seal.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model sales contract for machinery and equipment

Buyer: _ _ _ _ _ _ _

Legal address: _ _ _ _ _ _

Legal Representative: _ _ _ _ _ _

Title: _ _ _ _ _ _

Authorized Agent: _ _ _ _ _ _

ID number: _ _ _ _ _ _

Mailing address: _ _ _ _ _ _

Postal code: _ _ _ _ _ _

Contact person: _ _ _ _ _ _

Tel: _ _ _ _ _ _

Fax: _ _ _ _ _ _

Account number: _ _ _ _ _ _

E-mail: _ _ _ _ _ _

Seller: _ _ _ _ _ _ _

Legal address: _ _ _ _ _ _

Legal Representative: _ _ _ _ _ _

Title: _ _ _ _ _ _

Authorized Agent: _ _ _ _ _ _

ID number: _ _ _ _ _ _

Mailing address: _ _ _ _ _ _

Postal code: _ _ _ _ _ _

Contact person: _ _ _ _ _ _

Tel: _ _ _ _ _ _

Fax: _ _ _ _ _ _

Account number: _ _ _ _ _ _

E-mail: _ _ _ _ _ _

Whereas, the Seller has the exclusive right to produce and sell _ _ _ _ _ _ _ _ _ equipment and related materials;

Whereas the buyer needs to buy the above equipment and related materials from the seller at the price of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In view of this, based on the principles of voluntariness, equality, mutual benefit, honesty and credibility, both parties have reached the following contract terms through full friendly negotiation for common compliance.

I. Subject matter of the contract

The object of this contract is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1. Equipment name, model, specification and quantity.

2. All supplies and services provided by the seller must make the installed equipment fully meet the requirements of technical specifications.

3. The Seller shall design, manufacture and provide other auxiliary equipment and materials required by the equipment for the Buyer.

4. The seller shall provide the following services to the buyer: design, training, installation, testing and acceptance, quality assurance, after-sales service, etc.

Second, the contract price

1. The total contract price is RMB Yuan only (in words).

2. The total contract price includes all expenses for manufacturing, packaging, taxes, customs duties, commodity inspection fees, installation and debugging, acceptance, training, technical services (including provision of technical data and drawings) and warranty period guarantee of equipment and auxiliary equipment.

3. The breakdown price of the total contract price is as follows:

(1) Cost of equipment and materials: RMB only (in words).

(2) Expenses for auxiliary equipment: ¥ _ _ _ _ _ _ _ (in words).

(3) Design and technical data and training fee: RMB only (in words).

(4) Technical service fee: RMB Yuan only (in words).

The contract price is fixed.

5. If the product of unit price and quantity is inconsistent with the total price, the unit price shall prevail and the total price shall be revised.

Third, payment

The total contract price stipulated in Article 2 of this contract shall be paid by the buyer to the seller through the bank in the following ways and proportions.

1. The buyer shall pay _ _ _ _ _ _ _ _% of the total contract price (in words: _ _ _ _ _ _ _ _) to the seller within _ _ _ _ _ _ _ _ _ days after receiving the following documents submitted by the seller and checking them to be correct.

(1) _ _ _ _ _ _ _ copies of export license issued by the relevant authorities in the country where the seller is located, or _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(2) _ _ _ _ _ _ _ _ original and _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(3) Proforma invoice with total contract price of _ _ _ _ _ _.

(4) sight draft drawn on _ _ _ _ _ _ _ _.

(5) Commercial invoice _ _ _ _ _ _.

The above documents shall be submitted by the seller within _ _ _ _ days from the effective date of this contract.

2. _ _ _ _ _ _% of the total contract price is RMB _ _ _ _ _ _ (in words: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _)

(1) Full set of clean and flawless blank ocean bills of lading, made out in blank and endorsed in blank, and marked "The payment notifying company is at the port of destination _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(2) Commercial invoice _ _ _ _ _ _ _ _;

(3) A draft at sight in the unit of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _;

(4) Detailed packing list in _ _ _ _ _ _ _ copies;

(5) The quality certificate is in _ _ _ _ _ _ _ _.

3. The buyer shall pay _ _ _ _% of the total contract price to the seller within _ _ _ _ _ _ days after receiving the following documents and checking them correctly, that is, RMB _ _ _ _ _ _ _ _ (in words: _ _ _ _ _ _ _ _):

(1) commercial invoice in _ _ _ _ _ _ _ _;

(2) A copy of the handover acceptance certificate signed by the representatives of both parties according to the provisions of this contract.

(3) sight draft drawn on _ _ _ _ _ _ _ _ _.

4. _ _ _ _ _ _% of the total contract price is RMB _ _ _ _ _ _ (in words: _ _ _ _ _ _ _). After the expiration of the warranty period stipulated in this contract, the Buyer shall _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(1) Commodity invoice in _ _ _ _ _ _ _ _ copies;

(2) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(3) sight draft drawn on _ _ _ _ _ _ _ _ _.

The bank charges incurred by the Buyer and the Seller during the performance of this Contract shall be borne by the Buyer in China, and the bank charges incurred outside China shall be borne by the Seller.

Four. Overdue payment

If the buyer fails to pay within the time limit stipulated in the contract, the seller has the right to postpone the delivery; If the buyer fails to pay after the date stipulated in the contract, the seller has the right to terminate the contract. At this time, the buyer shall pay the seller the contract price for _ _ _ _ _ _ _ _ _ days. If the buyer fails to pay the contract price for _ _ _ _ _ _ _ _ _ _ _ _ days, the seller shall be compensated by the buyer.

Verb (abbreviation for verb) Equipment delivery

1. delivery time: the seller shall deliver the goods within _ _ _ _ _ _ _ _ _ _ _ years. The delivery date is subject to the delivery time stamp of the aviation department/railway department/water transportation department where the equipment originated. This date is the basis for calculating the liquidated damages for late delivery in this contract.

2. Place of delivery: All contract equipment shall be transported by the seller to the place of delivery. The place of delivery is _ _ _ _ _ _ _ airport (station, port). After the seller delivers the goods to the carrier, the ownership and risk of the goods pass to the buyer.

Five articles related to the model contract of machinery and equipment sales;

★ 5 practical old equipment sales contract templates

★ 3 samples of mechanical equipment sales contract.

★ The latest model of machinery and equipment sales contract

★ Three standard versions of mechanical sales contract model

★ The latest three model contracts for the purchase and sale of machinery and equipment.

★ 3 Model contract for purchase and sale of mechanical equipment

★ Model sales contract for machinery and equipment

★ 3 Model contract for the transfer of machinery and equipment.

★ 3 Contracts and agreements for the transfer of machinery and equipment.

★ The latest three demonstration clauses in the equipment sales contract.