In order to conscientiously implement the xx spirit of the Party, profoundly learn the lessons of gas leakage and explosion accidents in restaurants in recent years, earnestly strengthen the infrastructure construction of safety production in catering enterprises, further strengthen the gas safety supervision in catering places, and effectively curb the occurrence of gas safety accidents. According to the spirit of xx document and the actual situation of our site, this plan is formulated:

1. Significance of special treatment

In recent years, gas leakage and explosion accidents have occurred frequently in some restaurants, causing serious losses to people's lives and property. The main reasons for these accidents are: First, some restaurants do not know enough about the dangers of gas leakage and explosion; Second, the safety investment is not in place, the safety equipment and facilities such as fire prevention and explosion prevention at the job site are not perfect, and the investigation and management of hidden dangers are not timely; Third, the work of safety education and training is not effective, employees lack the knowledge and skills of gas explosion-proof safety, and illegal command and operation are serious; Fourth, some areas have not paid enough attention to the explosion-proof safety of gas in catering places, the safety supervision responsibilities are unclear, there are weak links and loopholes, and measures to crack down on and ban illegal production and business operations are ineffective.

Although there are not many dining places in our field, most of them are located in crowded places. Once an accident happens, the consequences will be unimaginable. Therefore, it is necessary to organize catering places in a centralized way and treat gas safety specially, so as to establish a long-term mechanism to prevent and contain gas accidents in catering places.

II. Objectives and tasks

The scope of this governance is catering establishments using liquefied petroleum gas. The main objective and task is to order the catering establishments with gas safety hazards to be rectified, requiring that qualified gas cylinders must be used, so as to eliminate hidden dangers and improve the safety of catering enterprises.

(1) Dining places under the following circumstances shall be banned according to law:

1. Using gas underground or semi-underground.

2. The relevant licenses are incomplete.

(2) Places where liquefied petroleum gas is used shall meet the following requirements:

1. When the total amount of liquefied petroleum gas in stock exceeds 111kg, a special gas cylinder room shall be set up.

2. LPG cylinders in use and spare cylinders should be placed separately or separated by firewalls.

3. Flames and explosives shall not be piled up in the room where steel cylinders are placed.

4. The normal service life of the cylinder pressure reducer is 5 years, and the service life of the sealing ring is 3 years. It should be replaced immediately and recorded at the expiration.

5. If the steel cylinder supplies multiple cookers, it shall be connected and fixed by hard pipes. If a steel cylinder is connected with a single cooker using a hose, it should be fastened with a clamp, and the length of the hose should be controlled at 1. 2 meters to 2. 1 meters, and there is no interface, the rubber hose should be replaced every 2 years, if the hose is aging, corrosion and other problems, it should be replaced immediately; Hoses must not pass through walls, windows and doors.

6. Gas cylinders and liquefied gas provided by supply enterprises that have obtained gas business licenses shall be used.

III. Time and work arrangement

1. Investigation stage (April 12 to April 17)

The site safety supervision station finds out the catering places using liquefied gas and establishes the basic account.

2. Stage of self-examination and self-correction (from April 18 to the end of May)

All catering establishments should carefully conduct self-examination and self-correction according to this implementation plan.

3. Supervision and summary stage (June to July)

The safety supervision station will strengthen inspection and cooperate with the inspection work of the county special governance leading group.

Part II Work Plan for Gas Safety Inspection

I. Work Objectives

Conduct a comprehensive safety hazard investigation and rectification of the gas-to-coal engineering construction projects completed in our district since 2116, so as to achieve horizontal to the edge, vertical to the end, leaving no dead ends and blind spots, and thoroughly investigate and rectify the quality and safety hazards of the gas-to-coal engineering construction projects.

II. Main tasks

Strengthen the investigation and rectification of potential safety hazards of replacing coal with gas in rural areas. It is necessary to strengthen the investigation and rectification of potential safety hazards of replacing coal with gas in rural areas in light of actual work. The inspection contents include:

1. "Looking back" on the problems such as insufficient safety distance between gas pipelines and electric wires, missing height limit signs, double fire sources, and firewood piled near gas facilities.

2. Check the protection construction of gas facilities and equipment, and take anti-corrosion measures for flange bolts and supports connected with pressure regulating box and metering cabinet; Permanent signs such as milestones, corner piles, marker piles, cross piles and warning signs shall be set for buried pipelines; Pipeline welding joint shall meet Grade II standard; Pressure regulating box, exposed valves, instruments, pipelines and other facilities should be equipped with special protective nets and protective boxes to prevent external damage.

3. Check the protection of rural household pipe network, and strengthen the publicity of common sense of pipe network safety protection for rural residents; Prevent private construction, demolition and unauthorized alteration of pipe network facilities; Keep abreast of rural reconstruction and housing construction. Prevent the pipe network from supporting and strengthening the wall; Without permission, pipe network support, wall structure reinforcement and other pipeline facilities shall not be changed.

4. Check whether the signboards and warning signs of gas facilities and the anti-collision protection devices of gas risers and gas pressure regulating boxes on both sides of the road are in place, and whether the safety management and emergency measures of gas enterprises are in place.

5. Check whether the gas facilities, equipment, pipeline construction and use places meet the safety standards. Whether the safety spacing of sewage, electric power and other pipelines and inspection wells around the gas pipeline meets the requirements.

6. Make continuous efforts to do a good job in the investigation and rectification of hidden dangers, especially to strengthen the inspection of gas pipelines near construction sites, hidden places and ditches, and never let go of any possibility of accidents, so as to resolutely trace the smell and find abnormalities, and resolutely prevent minor negligence from causing major accidents.

III. Division of tasks

According to the division of responsibilities in the Implementation Plan for the Supervision System of Rural Gas Replacing Coal and Urban Gas in XX District (No.X Zhengban [21XX] X) issued by the district government in October of 21xx, all towns and villages should carry out comprehensive gas safety inspection before the heating season comes, and carry out comprehensive household safety inspection (the checklist is attached)

IV. Schedule

From now on-October 31, 2121.

V. Relevant requirements

(1) Attach great importance to and strengthen leadership. Carefully organize, conscientiously perform their duties, and quickly carry out this work.

(2) comprehensive rectification and careful deployment. Refine the division of responsibilities, do a good job of implementation at all levels, clarify the responsible units and responsible personnel, ensure that the hidden dangers that can be rectified on site should be rectified and reformed, and establish responsibility accounts for problems that cannot be rectified on site to ensure that the rectification is in place.

VI. Submission of information

All relevant towns and departments should report the investigation and rectification of potential safety hazards to the leading group office (District Housing and Construction Bureau) for the management of replacing coal with gas in rural areas and gas in urban areas before 12: 11 on October 31th, with the telephone number of XXX.