In order to strengthen standardized site management, improve the management level of various project departments in the company's construction site, enhance the company's own image, build the company's brand strength, and meet the market demand, the goal is to build a standardized and safe construction environment. According to the current relevant national and local laws, regulations, technical specifications and standards, combined with the company's standard requirements, this safety and civilized management construction plan is formulated.
I. Safety production system
All units must establish and improve the management institutions, rules and regulations of the construction site. Inspected by the superior department of the company. Team leader of safety construction management team: deputy team leader of project manager: deputy project production manager, team members of project chief engineer: safety officer, foreman, mechanic, material engineer and team leader;
Clearly divide the responsibility system of all personnel in the project department, so that they can fulfill their responsibilities and obligations in the construction process. The project manager is the first person responsible for safety and is directly responsible for safety production. The project department must be equipped with a corresponding number of experienced safety officers according to the on-site construction environment. And regular assessment by higher authorities;
Formulate strict safety technical operation procedures, and the safety personnel and experienced construction management personnel of the project department regularly carry out safety technical education and training for each team member;
The safety leading group of Xinjiang Branch always remotely controls all project departments, regularly checks subordinate project departments, and puts forward rectification requirements for unqualified construction parts (schemes).
2. Safety management objective: zero work-related death accidents, no serious injury accidents, and the injury rate per thousand people ≤ 0.3 ‰; Put an end to major fires and mechanical casualties; Occupational morbidity is zero; Prevent environmental pollution (noise, dust, poison and three wastes), and the compliance rate is100%; Certificate holding rate of special operators100%; The three-level safety education and training for construction personnel of newly-started projects reached100%; Accident insurance for newly-started construction workers reached 100%.
Third, the construction organization design
Technical personnel familiar with the site environment shall formulate the construction organization design to ensure the safety in production at the construction site;
For some professional and difficult construction projects, special safety construction organization design should be compiled separately. And reported to the higher authorities for approval, without the approval of the project, no construction. Put an end to blind construction without any safety measures. 1) Prevent falling from a height and being struck by objects: strictly supervise that personnel entering the site must wear safety helmets, and those working at height must wear safety belts; Protective measures must be installed everywhere (stairs, reserved holes, elevator wellhead, manhole); Ensure the firmness and stability of scaffolding, platforms, ramps, springboard and other facilities for aerial work; It is forbidden for aerial workers to throw any materials from a height;
Prevention of collapse accident: do a good job in slope or slope support and drainage around it; Scaffolding should be calculated, scientific and reasonable, and the materials used must be firm; Large formwork must be equipped with skids and tie rods, and the insert frame must be fastened to maintain stability; Large hoisting components must be in place and welded firmly before hoisting and unhooking;
Prevention of mechanical injury accidents: operate in strict accordance with operating procedures and labor protection regulations, and wear protective equipment as required; All kinds of equipment should be equipped with safety devices such as safety limit device, lifting weight controller and interlock switch as required; Crane commanders and drivers shall strictly abide by the operating rules and regulations, and shall not operate illegally; All mechanical equipment and lifting tools should be inspected, maintained and repaired frequently to ensure their sensitivity and reliability;
Prevention of electric shock accidents: improve the management system of electricity consumption, and formulate the installation standards, operation management and regular inspection system of electrical facilities; When there are five or more temporary electricity-using equipment or the total capacity of the equipment is 50kw or more on the construction site, the temporary electricity-using construction organization design shall be prepared. And must be suitable for the construction of electricity specifications. According to the construction organization and construction plan, make a specific electricity plan and use appropriate transformers in distant places; Do a good job in electrical equipment and protective measures, and use safe voltage; All kinds of electrical equipment must conform to the principle of "one machine, one leakage, one brake, one box and one opening". Set up safety supervision inspectors specializing in electrical technology, regularly check the electrical equipment in the construction site and workshop, and eliminate hidden dangers in time; Train all kinds of electricians, electrical equipment operators, welders and people who often contact with electricity in a planned and organized way, learn the knowledge of safe electricity use and the rules of electricity use management, and prohibit unlicensed personnel from engaging in electrical operations;
Prevention of poisoning, heatstroke and occupational diseases: toxic substances used by employees should be strictly kept, used in limited quantities, and anti-virus measures should be taken. Strictly abide by the operating rules; Effective measures such as cooling and ventilation should be taken for those who work in the open air in high temperature and summer. The canteen handled by the project department must have a hygiene license and meet the inspection standards of the epidemic prevention station. The mixer should take measures such as sealing, dust removal and dust removal to reduce the concentration of cement powder and make it meet the national standards; Improve the accuracy of mechanical equipment and take noise reduction measures.
Four, division (disciplines) engineering safety technical disclosure
By the project department full-time security officer and engineering professionals with rich work experience, organize team members to carry out safety technical disclosure of each type of work. For some special types of work such as (electrician, welder, rigger, gas welder, scaffolder), in addition to having a work license, safety technical training is also required;
In the process of safety technical disclosure, it should be targeted and comprehensive, and all construction personnel should sign after disclosure, and save it in text form for on-site filing.
Verb (abbreviation for verb) security check
Adhere to regular safety meetings, and the company and the project department conduct institutional safety inspections once a month and once a week. The security personnel of the project department conduct daily inspections on the construction site, record the construction technology and unsafe factors of each team, put forward rectification opinions, and urge the project to carry out rectification;
If there are major hidden dangers, a rectification notice will be issued immediately. The inspection focuses on aerial work, mechanical power and other aspects to prevent accidents such as falling from a height, electric shock and mechanical injury. If problems and hidden dangers are found in the inspection, they must be rectified immediately to ensure safe construction, and the written signature should be improved to ensure "prohibition" on safety issues.
Six, safety education
Establish a safety education system. Before starting work, every worker who enters the site shall be trained in "three-level safety education", so that the workers can fully understand the content of safety education and realize that this is a major event related to their own life safety. Collect the list of personnel who have received safety education and signed it, and file it on site.
Seven, inductrial injury accident treatment
The project department shall make statistics on the injured persons in the project department every day, establish the files of industrial accidents, and report the situation to the company's security department before 25th.
Investigate and analyze the causes of industrial accidents, and hold the main person in charge accountable. Implement the "four don't let go" (no three-level safety education, no preventive measures, unclear causes of accidents, and incomplete accountability). Prevent similar situations from happening in the future.
Eight, the requirements of civilized construction on the construction site
Carry out modern management science, scientifically organize construction, implement civilized construction requirements, and formulate civilized inspection system for safety production, fire control management system and civilized construction guarantee measures of the project department in combination with the actual situation of the project, so as to do a good job in construction site management;
Seriously publicize and implement the laws, regulations and mandatory provisions of the state on safe production and civilized construction;
Civilized construction leading group shall be established on site, and the project manager shall be responsible for civilized construction on site. And formulate a set of civilized system suitable for the characteristics of this project, so that the project manager must be clear about the principle of "construction must be safe";
According to the general layout of the construction site, set up temporary facilities, pile up bulk materials, finished products, semi-finished products and mechanical equipment, and do not encroach on the roads and safety measures in the field; ?
Set up clear signs on the construction site, so that five certificates and one map are complete. Indicate the name of the project, the construction unit, the construction unit, the name of the project manager and the general representative of the construction site, the date of commencement and completion, the approval number of the construction permit, etc. The construction unit is responsible for protecting the signs on the construction site. The main management personnel of the construction site shall wear identification cards at the construction site;
The installation and use of power lines and facilities on the construction site must conform to the installation specifications and safety operation procedures, and it is strictly forbidden to connect wires at will. The construction site must be equipped with night lighting to ensure the construction safety requirements. Lighting in dangerous and humid places and hand-held lighting lamps must use voltages that meet the safety requirements;
Do a good job in the safety and security of the construction site, set up full-time case handlers to be on duty 24 hours a day, take necessary anti-theft measures, set up enclosure facilities around the site, and non-construction personnel are not allowed to enter without authorization;
Canteen health personnel should go to the local government for health permits and related medical certificates. Incorporate dormitory (canteen) and civilized sanitation into the management system of the project department;
Control the pollution and harm of dust, waste gas, waste water, solid waste, noise and vibration on the construction site, clean up construction waste, use closed containers and bags, and it is strictly forbidden to throw it around at will to cause dust. Construction waste should be removed in time. Sprinkle water properly during cleaning to reduce dust;
When mixing concrete pump and mortar machine on site, sedimentation tank must be set in front of mechanical platform or transport vehicle. The discharged wastewater should be discharged into the sedimentation tank, and it can only be discharged into the sewer pipe after twice sedimentation. Untreated floodwater is strictly forbidden to be directly discharged into drainage facilities. All site personnel should strengthen the construction of spiritual civilization, abide by professional ethics, and reduce the impact of construction on the surrounding environment. There will be a special person in charge of public relations coordination, listen to the opinions and suggestions of relevant parties, and accept inspection and criticism with an open mind. And if possible, make rectification to meet the requirements of relevant departments, so that the project can proceed smoothly.