Current location - Recipe Complete Network - Catering industry - How about Beijing Forte Center?
How about Beijing Forte Center?
The project is located in the southwest corner of Dongguan Bridge in Tongzhou District, covering an area of 42,747 square meters, with a building area of 315,968 square meters, a plot ratio of 7.5 and a greening rate of 30%. 6 buildings, and the property fee is 8 yuan /m2. month.

Peripheral facilities:

Forte Center is located in the core area of the canal CBD, and the surrounding business office, catering, shopping, leisure, entertainment, education, medical care and other living facilities are extremely perfect.

(1) Commercial facilities: There are international medical service areas, international organizations gathering areas, GD headquarters base around Bohai Sea, Tongzhou cultural tourism area in Beijing and Songzhuang cultural and creative industries gathering areas around;

(2) Government resources: According to media reports, Tongzhou District Government and Beijing Municipal Government will also settle in Tongzhou in the future;

(3) Commercial facilities: Wanda Shopping Mall, Starlight Shopping Mall, People's Shopping Mall, etc. In the future, there will be world-class commercial projects such as Guangxin Tiandi in the region.

(4) Leisure facilities: Olympic Sports Park, Grand Canal Forest Park and Universal Theme Park.

(5) Educational resources: Tongzhou Branch of Beijing No.2 Middle School, Luhe Middle School, Dongguan Primary School in Tongzhou District and Tongzhou Branch of Beijing Primary School;

(6) Medical security: Beijing Jingtong Hospital, PLA 263 Hospital, Beijing Tongzhou Luhe Hospital, Dongzhimen Affiliated Hospital (Chinese Medicine Hospital), Tongzhou Maternal and Child Health Hospital.

Power supply: municipal power supply. There is no opening and closing station, and municipal dual power supply is provided. The power supply voltage level is 10KV, and the power load density is 80w/㎡. The electric load capacity of the apartment is 1.20 m2, below 8kw; ; 12 1- 150m2 press12kw; /kloc-above 0/50m2, 80w/m2, three-phase power supply configuration. There is no opening and closing station, and municipal dual power supply is provided. The power supply voltage level is 10KV, and the power load density is 80W/㎡.

=656;

The electric load capacity of the apartment is 1.20 m2, below 8kw; ; 12 1- 150m2 press12kw; /kloc-above 0/50m2, 80w/m2, three-phase power supply configuration.

External wall: the facade of the office building adopts aluminum plate, stone curtain wall and glass curtain wall. The facade of the apartment adopts stone+aluminum curtain wall; Commercial facade materials are stone, aluminum plate and glass curtain wall.

Structure: office building frame-core tube; Frame-supported shear wall structure of apartment; Business is a framework structure.

Air-conditioning: The mainframe, cooling tower and terminal of air-conditioning systems and equipment in office buildings and businesses adopt joint venture brands, and fans and ordinary valves adopt domestic high-quality brands.