There are too many factors to consider about the specific costs of these two aspects. It depends on the size of your own store and the number of projects.
If it is a half-package, the content is roughly as follows: plumber+materials (normally, lamps and switch panels are not included, but they can be included. See the exchange between the two sides)
Earthwork+materials (cement, sand, bricks, excluding floor tiles, tiles and marble), carpentry+materials (excluding finished doors and cabinets), painters+materials (excluding wallpaper), which is probably the case. The details mainly depend on communication between the two parties. The normal construction period is about 1 month.