Current location - Recipe Complete Network - Catering industry - 2022 Engineer Technical Summary
2022 Engineer Technical Summary

The term engineer is usually used for a person who holds a professional degree or equivalent work experience in one of the fields of engineering. The following is a summary of 2022 Engineer Technical Work that I have compiled for you, just for reference hope it can help you.

2022 Engineer Technical Work Summary1

I was born in August, _, in July 20_ in _x Construction Engineering College, graduated from the civil engineering major, graduated from the construction engineering, that is, came to China Construction Engineering Corporation, the third construction engineering company, the work so far. In these seven years, I have been working in the first line of construction engineering construction, so that my professional knowledge and skills continue to improve, and lay a solid foundation for the construction management level of their projects. Now I work more than seven years since the professional and technical work is summarized as follows:

First, the political and ideological performance

I am a young *** production party members, I have been strengthening political learning in the past few years, I have been insisting on watching the news reports and other news columns or newspapers and magazines, through the understanding of the country's major events, to enrich themselves. At the same time, as a *** production party member, I have been trying to do their own work, strict self-discipline, do a good job *** production party member's exemplary role, and try to help those new colleagues, so that they always feel someone care, love and help, as soon as possible to change the role into the work, and better able to do their jobs. These years I always stick in the construction of the first line, can y appreciate the role of the party in the people, the construction unit bitter, tired, and leave home and work, is not the average person can bear, so I will do my duty, do my best, in order to enterprise and the construction of the country and the struggle.

Second, the work of professional skills

20_August 20_I was assigned to Jidong Cement Fengrun three projects, since then I have begun my construction career, into the project from the internship foreman, through continuous learning and understanding, combined with their own professional knowledge, step by step with the masters and the project leadership of the arrangements, exercise their own, and slowly grow, half a year later, began to be independently responsible for After half a year, he began to be independently responsible for the construction of 8 cement stores and the subsequent finishing work, during this period, he accumulated a lot of experience in construction, laying a solid foundation for the future work, due to his pragmatic, willingness to work, and get the project leadership as well as the unanimous recognition of the A party supervisor.

20_ February to October, in order to the company's development needs, I was arranged to Dalian Hongyanhe nuclear power project internship, where I served as a carpenter engineer, responsible for the construction of the 1 # conventional island power plant room, through this period of time to learn, so that I broaden the horizons, greatly enriched their own professional and technical knowledge and management level, and cultivate my work style of rigor, where. It is not allowed to have any mistakes, so that I have been well educated, and it has a great influence on my future work. During this period, through continuous efforts, I successfully passed the examination of the second level constructor.

20_ October to date, after returning from the nuclear power study, I experienced the Jidong Cement Luanxian II project, Pingquan Jidong Cement project, Dandong Born Royal Shanshui project, and now Shenyang _ Happy School project as a commercial manager. During this period, as a basic mature grass-roots managers, I have always struggled in the first line of construction, theory and practice, for the project and the enterprise to make their own contribution. Luanxian Phase II, we undertook the construction of clinker line, I served as the project foreman, from the start of construction to the completion of the smooth commissioning, I have been involved in it, hard work, for the project to make their own contribution, while greatly enriching their own management level. Pingquan project, I took up the position of project business minister, supervise the project cost as well as the A side of the monthly settlement, and cooperate with the project manager to complete the final settlement, the effect is good, at present the project collection has been completed, through the efforts of all, for the enterprise to create benefits. Subsequently, came to Dandong Boon Royal Landscape project, still serving as Minister of Commerce, with the commercial manager for project cost control and monthly settlement, in September 20_ came to the _ Happy School project, serving as the project commercial manager so far. Through the efforts of these years, several projects to do down, so that I make great progress, learned a lot of practical experience, so that my management level step by step to improve, and at the same time, after their own efforts, last year successfully passed the examination of the national level constructor.

Third, the future performance

In order to get the company's affirmation, as well as in order to be able to go to a new level, I fervently hope to be able to promote the intermediate engineers, in order to be able to better carry out their work, for the development of the company to do their own efforts. After becoming an intermediate engineer, I can continue to develop in the position of management, for the project and the enterprise to dedicate all their strength, at the same time, I will also be more hard to study, improve their management level, always maintain their role as a model, not to be eliminated by the community, and to contribute to the enterprise to contribute their own everything.

2022 Engineer Technical Work Summary 2

I _ in x months of the year graduated from the _ University of Computer Hardware, in x months of the same year into the _ company _ departmental work, in the period of time, in the guidance of the leadership, care for the cultivation of the colleagues in the support of the help of the close cooperation, so that I have accumulated their own technology, work experience, Problem analysis and solution ability have improved, but there are still a lot of need to continue to accumulate and learn. I am now in my current position since the professional and technical work is summarized as follows.

First, the work

1. similar electronic form product research, and ultimately formed a variety of product evaluation reports;

2. based on the HTA offline filling tool design, development and realization of the work;

3. the United States of America's project in the form of part of the design document preparation and modification of work;

4. the new version of the user manual and the preparation of the characteristics of the table. User manual and characteristics of the table preparation work.

Second, their own learning

In the process of work, I y feel the urgency of strengthening their own learning to improve their own quality, one is to learn from books, insist on a certain amount of time every day to enrich themselves, improve the learning methods, and a wide range of draw a variety of; nutrition;; two is to learn from the surrounding colleagues, the attitude of open-mindedness to ask for advice, the initiative of colleagues to ask for guidance; three is to learn from practice, the application of the knowledge gained, the knowledge gained from the application of the knowledge gained, the knowledge gained from the application of the knowledge gained to the application of the knowledge gained to the application of the knowledge gained to the application of the knowledge gained. The third is to learn from the practice, the knowledge learned in the actual work, in practice to test the knowledge learned, to find deficiencies, to improve themselves.

Third, the product development proposals

1. For the company's international strategic development goals, not only for the development of the domestic form of the status quo, but also combined with the development of foreign forms of the status quo to analyze and study, to achieve greater ease of use of electronic form products.

2. Increase the form of multi-format export, release format. Such as support for Wml format output , support for handheld devices to deal with the form

3. Form management in the set of permissions to save the data operation . Convenient for users to read the permission data file in the offline tool. Thus realizing the solution to the problem of permissions in the offline.

4. Offline tools to achieve the form service function, the real realization of the network in the case of offline filling tools to achieve the release of data.

5. For the establishment of data binding, the need to create an abstraction had shielded the differences between different sources.

6. Can be combined with the eForm standard HTml to style and interface design , combined with the HTA offline filling to fully realize the offline state form design and filling .

Fourth, their own shortcomings and deficiencies

Summarize a year's time, I have made some progress in the leadership and colleagues to help and support, but I am aware of my own shortcomings and deficiencies, the theoretical foundation is not solid, business knowledge is not comprehensive enough, the way of work is not mature enough. In the future work, I want to try to do better, strengthen theoretical learning, accumulate project experience, and constantly adjust their own way of thinking and working methods, more involved in product design, development and project support work, in practice to hone their own, exercise their own, and become the department and project team can be a unique employee.

Through this year's work and learning, I feel that I meet the conditions of the post, apply for promotion to Assistant Engineer, please organize the assessment review. At the same time, I also hope that this review as a means to promote their own progress, and lay a good foundation for greater achievements in the future.

2022 Engineer Technical Work Summary 3

First, the Finance Bureau project, I am independently responsible for the development of the Accounting Division of the three subsystems:

1, Xiamen City, accounting personnel credit inquiry system.

2, Xiamen City, agent bookkeeping organization credit inquiry system.

3. Xiamen Accounting Personnel Online Reporting System.

After the above three sub-systems are online, it is convenient for the community to check the real information of the accountants, convenient to check the information of the legal bookkeeping organizations, and convenient for the units to report the accountants.

Second, the catering industry project, in the team development project directly involved in the information integrated management platform project of the headquarters of the Haoxianglai Catering Company Limited, mainly responsible for the system are:

1, housing lease contract management system.

2, SMS send and receive management system.

3. Membership management system.

4, basic information management system and personnel management system of some of the functional modules.

After the application of the system, Haoxianglai in the management of the national stores on the housing lease contract, to a certain extent, to improve the management efficiency, and timely and effective provision of the corresponding early warning information; SMS sending and receiving system facilitates the headquarters to pass the timely delivery of information; membership system to better manage the national stores of member information; personnel system to reduce the workload of the management, and so on.

Third, the financial industry projects, I participated in the Bank of China Xiamen Branch, the enterprise transfer management system in the development of some of the modules. This system facilitates the rapid realization of a large number of enterprises and complex transfer work.

Fourth, the Land Resources and Real Estate Administration project, is responsible for and development of the housing monetization subsidies online reporting and audit system. This project has adopted new technologies to make the interface more generous and beautiful, and largely improve the effect of human-computer interaction platform.

Summarize the shortcomings: when stationed at the headquarters of Hawthorne to do the project, due to certain reasons within the team, coupled with other factors outside, to a certain extent, affecting the efficiency of the work, the impact of the development progress and the impact of the final quality of the software; this is the place where every member of the project team, including me, must be reviewed.

By summarizing the work of the year, although there is a certain progress and achievements, but in some areas there are still deficiencies, individual work is not perfect. In the future, I will strive to identify the shortcomings of the work in order to overcome them in the future work. Self-continuous learning and absorption of new technologies, carefully study the good specifications and regulations and related documents and information, and timely application of new technologies in the actual project, to further improve the technical content of the project.

2022 Engineer Technical Work Summary 4

Time is in a hurry, between the eyes has graduated three years. In _ company work has also been more than two years of time, due to the demand for work and improve their technical level, I entered the _ power distribution equipment limited company technology department to learn and work. In _ company work so far more than two years, has grown into a qualified electrical engineer.

When I first entered the company, I had to go to the electrical workshop for internship. During the period is mainly to familiarize with the product, for the future design to lay the foundation. After the end of the internship, I officially entered the technical department work.

At the beginning, I was mainly responsible for the design of small box, pgl, ggd, some more standard xgn36(15)-12 and some other small orders, usually the number of units in a few units, or the output value does not exceed 100,000 orders. During this period of time, I followed the chief engineer and the old engineers to learn, and trained professional skills and basic knowledge in the evening, and then tested the learning results on the orders. This period of learning and work has left me a deep impression and impact.

Some of the more standard engineering orders, such as star-delta buck start, full-voltage start, autotransfer buck start, motor forward and reverse, etc., these are studied in school, but at that time, the impression was not deep, after doing these motor control projects, the previous theory and practice together, to be able to cite a few examples, to design their own style of control products. For example, temperature control box, gas control box, street light control box and so on. The main problem encountered in these products is the arrangement of components placement, which directly affects the box or cabinet external dimensions, as well as cable direction. Once not careful, the user will encounter a large number of problems in the process of installation and use. To do this kind of product, must be careful, more to the scene and customer communication, understand the customer's intention, it is best to design a rough layout and appearance of the map to the customer to confirm.

With the growth of experience, began to do a relatively large set of gck, usually the number of dozens of units or hundreds of units, the output value is usually more than half a million dollars, or even a million dollars. The main functional units are: metering cabinet, feeder cabinet, capacitor compensation cabinet, feeder cabinet, city power conversion cabinet, contact cabinet. Metering cabinet basically every two years Guangdong Power Grid Dongguan Power Supply Bureau will put forward new requirements, usually put forward new requirements within a month, the situation is the most problematic. For example, the previous requirements of 315kva and above, the transformer requirements for the installation of two sets of current transformers, an active meter, an electronic meter, the use of low-voltage billing. And now for a group of current transformers, an active meter, must be installed 10kv high-voltage metering cabinet, using high-voltage billing. Once you do not pay attention to this issue, shipments to the site can not pass the electricity, can not pass the acceptance, the site remodeling project is very large, and will bring negative impact to the company.

gck commonly used feeder unit for the drawer cabinet, is a more advanced cabinet type. Usually need to pay attention to the load is whether there is "non-fire protection load", such a load in the fire must be shut down to prevent the expansion of the accident. Usually in the molded case circuit breaker with a dc24v fire shunt coil to realize the trip. Many people understand as "not - fire load must be protected", resulting in the tripping coil added the wrong location, the fire load jumped off some of the class, such as fire fans, fire pumps, etc., in fact, fire loads can not be blackout. In fact, fire loads cannot be de-energized. In case of fire, it will lead to more serious fire. It should be understood as "non-fire loads that must be protected".

Then later, began to do high-voltage cable transfer box dfw-12 and high / low voltage pre-assembled power station ybp (m), and then to xgn15 ring network cabinet, kyn28a-12 in the middle of the cabinet, as well as the more complex plc and inverter control cabinets, dc panels (gzdw), signaling panels; from the simple to the complex; from small projects, small quantities to large projects. From simple to complex; from small projects, small quantities to large projects, multiple large orders; with the increase in the number of design projects, the growth of experience, for each cabinet type of system schematic design, the design of the secondary control wiring diagrams, including a variety of non-standard motors, fans, fire control boxes, as well as a variety of dual-power supply, multiple power supply three-into-two, five-into-three system to be able to skillfully master, and reasonably use. At the same time, for a variety of cabinet structure is very familiar with the characteristics.

2022 Engineer Technical Work Summary 5

20_ year is coming to an end, look at their own work over the past year, to summarize the gains and losses of the year, a lot of feelings. Over the past year, I am enthusiastic about my work, strict requirements for themselves, correct their own work position, and always maintain a "modest", "cautious", "self-discipline" attitude. In the leadership of the care, cultivation and colleagues to help support, always study hard, forge ahead, and strive to improve themselves, seriously complete the task, to fulfill their duties. As a hardware engineer, but in my heart, ___ is my home, the leadership is my parents, colleagues are my brothers and sisters, ___ thing is my own thing, I want to through my own unremitting efforts to make the company's projects perfect, so that our ___ products can be marketed as soon as possible. I understand the responsibility and obligation as a hardware engineer of Shaanxi Delong. Looking back at the past year I will summarize my work in the following areas.

First, the annual work

In the past year, I am familiar with the company's projects, and gradually grow to the company's projects can undertake part of the module, and in these areas for the company to make due contributions to my own personal ability to get the corresponding improvement. But the company's projects are complex, there are still a lot of things to learn, so I have to continue to work hard on the details of the project and a more in-depth understanding of the difficulties, and I hope to see the perfect birth of the product through their own efforts.

In this year, I mainly completed the following tasks

1, in 20_ on the basis of the various indicators of the radio station to refine and study, and according to the X worker's proposal with the civil aviation indicators summarized our own radio station test methods, and our radio station to carry out a detailed test, according to the test records of the radio station for the assessment of the various performance.

2. According to the tracking test of the radio, the existing problems of the radio have been organized, and the corresponding parameters of each module have been modified. Subsequently, the schematic diagram of each module was modified, and solutions were proposed for the fractional crossover problem of the transmitter frequency convergence and the transmitter harmonic problem.

3. It took one and a half months to integrate and modify the system schematic diagram of the whole radio, and at the same time, it clarified the meaning of the signals of the whole radio, which laid the foundation for the research and development and testing.

4, according to the transmitter's test data on the transmitter to make the corresponding evaluation, put forward some problems, such as power instability, inaccuracy, modulation system drift, distortion, PTT timeout, and so on, and then with the _ big cooperation to solve the transmitter related problems. During this period through the cooperation to solve the power stability problems, modulation system drift problems, PTT timeout problems, etc., through the solution of these problems we ourselves have summarized a method and formula, more in-depth solution to the transmitter-related problems, for the subsequent transmitter debugging and production to lay the foundation.

5, the legacy of the transmitter distortion, harmonics and other issues to further efforts to solve. Try to make MOD voltage generation circuit to narrow down the scope of the troubleshooting problem, try to use customized filters to reduce harmonics, modify the amplifier parameters to solve the problem. Although the problem is not well solved, but we have found a direction from it, I think in the direction of continuing to work along this direction, these problems will certainly be solved.

6, began to participate in the discussion of the new program research, first of all, the modulation board, to reduce the modulation board useless signal lines, the use of DSP serial protocol to communicate with the ARM; and then the power supply board, the original discrete power supply board and rectifier board integrated together, reducing the connection line, and increased heat dissipation area; followed by the improvement of the ARM, according to the new procurement of the ARM model to develop an effective isolation program, change the original power supply; and then according to the new requirements of the radio station, the frequency converter to increase the function of fractional frequency division, so the frequency converter using ADF4351 phase-locked loop to design.

7, drawing the power supply board, modulation board and ARM adapter board PCB board, while participating in the discussion of each board interface mode, for PCB board welding ingredients.

8, negative then the company's new project digital transmission radio, making digital transmission radio test tools, planning the digital transmission radio R & D preliminary program, three outdoor testing, digital transmission radio evaluation, although the project did not go on, but through this project, I myself have learned a lot of things, but also feel the company's development momentum.

9, the modulation board, ARM adapter board and power supply board, single-board testing, subsequent welding shielding frame, in the welding and installation process, but also on some of the structure of the modification and improvement, and finally functional testing, the new version of the modulation board, power supply board, and ARM adapter board, such as joint debugging.

10, Fudan project, the main do the following:

1) first familiar with the basic situation of the project, began to work on the design of voltage sampling circuits, determine the model of the resistor;

2) as the project progresses, the final determination and production of the resistor, to determine the form of basic circuits;

3) and then based on the size of the resistor to determine the cabinet The size of the cabinet was then determined based on the resistor dimensions, the manufacturer was identified, and the busbar was designed and machined;

4) The project was subsequently submitted to Shanghai for evaluation, and the installation dimensions and busbar mounting method in the cabinet were revised again based on the evaluation results.

11, involved in the company 9000 audit document preparation, and finally integrated the location of the laboratory bench, so that tools, instruments and other items placed in place, integrated file cabinets, so that the company's office is more neat, but also standardize the workflow and work style.

Second, the work of the experience

to the company has been more than a year, from the initial understanding of the project, to be familiar with the working principle of each module, and then alone to undertake the project in the module of the research and development, I see myself in the growth, in progress, in maturity. In the work also realized the importance of cooperation, our radio system is very complex, each of us is a part of the complex system of radio, so their cooperation is very important.

Third, there are shortcomings in the work

1, after a year of work and study, I also found my own deeper understanding of the project is not enough, the ability to solve complex problems is not enough, which is what I have to continue to work in the work of honing and improve their own place. Summarize in detail, their work in a year's work mainly in the following areas do not do a good enough job of professional and technical aspects of the work is not proficient enough, the distortion of the transmitter did not find a solution to the problem should be strengthened in this area of study, to provide guidance for the future work.

2, the working environment is not clean enough, the experimental table is not neat enough, the instrument is not in place, I hope that in the future I constrain themselves to put the items in place, to develop good habits. Habits determine success or failure, good working habits will actively promote our work.

3, the work summary is not in place, did not actively summarize their work gains and losses and experience, resulting in the same place to fall twice, I hope to strengthen in this area later.

Fourth, the work plan

1, the next year is very important to the company, both the radio station will be sent to the civil aviation to review, Fudan project will also usher in the review, for me it is an opportunity and a challenge, so I have to work harder, for the new breakthroughs in the company's contribution to the power of all.

Among them, the following points are the focus of my next year to improve the place to continue to improve the work methods, seek new ideas in the work, innovation as a goal of the work, the treatment of the work, and strive for perfection, if you can never make do.

2, strengthen the unity of the staff and cooperation, highlighting the characteristics of each person, and lift the whole staff to do a good job of the project.

3, strengthen the learning of professional and technical knowledge, improve the practical ability and the ability to deal with daily affairs.

In short, in the past year, I was able to fulfill my duties, actively work hard to complete my job, the workload is full, in general, I am more satisfied with their work. In the new year, I will continue to improve the work of the existing shortcomings, as always, continue to work hard to do their own work, but also hope to be able to get the leadership and comrades understanding and support.

2022 Engineer Technical Work Summary Related articles :

★ 2022 Engineer Individual Work Summary Report

★ 2022 Test Engineer Year-End Work Summary Selected 10

★ 2022 Technical Department Year-End Work Summary Selected 10

★ Engineer individual work summary report 10

★ Engineering and construction year-end work summary 2022 (10)

★ Engineer individual technical year-end summary

★ 2022 Assistant Engineer work summary

★ 2022 Test Engineer probationary period of the transfer of the work of the summary of the 5

★ 2022 it work summary example Ten

★ 2022 the latest individual year-end work summary (common to all industries)