With this flow chart, you don't have to worry about the renovation!

There is a sequence of work and a process of decoration! Only by knowing the specific process of decoration can we control it in an orderly and overall way. IDEA summed up a decoration flow chart according to his homework in the decoration process!

OK, the decoration flow chart is here!

▲ renovation flow chart

The above steps are not absolute, and some sequences can be adjusted. There are also some small processes or details, which may not be listed comprehensively, but they are comprehensive on the whole and will follow these major steps.

This picture is very clear, but in a dedicated and professional manner, IDEA still needs a brief analysis.

1. Before starting work

Actually, there is a lot of work before starting work, and IDEA only sorts out the more important ones. It's basically three things.

1. decoration company

inspect the decoration company (or designer, construction team, etc., the same below), select a satisfactory decoration company, measure the house, make a formal design, quote, etc., and sign the construction contract as soon as the construction starts.

The same is true for self-installed houseguests. Look at the workers who are satisfied with the reservation, and don't wait until you finish one item before looking for the next one.

2. Decoration procedures

Now new residential areas generally need to go through decoration procedures before they can start construction, so don't ignore this step.

3, the main material is scheduled

As the saying goes, "hydropower transformation, cabinets first." Be sure to book the cabinets before starting work, because the cabinet company needs to design the kitchen water and electricity to match the water and electricity design of the decoration company.

in addition, it is best to book the central air conditioning, fresh air, floor heating, enclosed balcony, etc. before the start of construction, so as to avoid being in a hurry just after the start of construction.

Second, after the demolition and construction project

starts, the first thing to do is the demolition and construction work, and the structural layout of the apartment is transformed.

1. Ensure

Protect some parts that need protection, such as gas pipelines, corner guards, security doors, etc.

2. Dismantle

Dismantle walls, unnecessary sliding doors or windows, etc. In some cases, it is necessary to remove putty from the top surface of the wall.

Many newly-built residential areas are equipped with floor heating, but the quality of floor heating is often unsatisfactory. Many residents need to smash the floor if they want to redo the floor heating.

3. Building

According to the layout design of the apartment, new walls are built. After the demolition and construction is completed, the walls are generally painted and the ground is fixed.

4. Drawing with measuring ruler

If it is necessary to repackage the balcony and replace the window after the demolition and construction, it is necessary to measure the balcony and window. IDEA suggests that the balcony and window replacement should be completed as soon as possible.

at this time, the measuring ruler of the cupboard and the drawing of the kitchen water and electricity must be done well, because the water and electricity will be transformed soon.

Third, hydropower project

1. Hydropower positioning

According to the drawing design, the site positioning of hydropower, Sumitomo must pay attention to hydropower positioning, and it should be verified repeatedly.

2. Hydropower transformation and acceptance

After positioning is completed, the installation and laying of strong and weak electricity and waterways can be carried out. Do a good job of water and electricity acceptance after completion, leaving no regrets and hidden dangers.

3. Other construction

After the hydropower is completed, the construction of floor heating, central air conditioning and fresh air can be carried out (central air conditioning and fresh air can also be carried out before the hydropower, and the residents need to coordinate each process by themselves).

Balcony package and window replacement can be constructed synchronously with water and electricity.

4. Booking of main materials

Book the main materials that may be used in the next stage, such as wall and floor tiles, doorstones and security doors.

Fourth, bricklayer

1. Waterproofing and water-closing test

There are two main points to pay attention to in bathroom waterproofing. First, the floor waterproofing should be 311mm above the wall, and the waterproof height of the shower area should be 1811mm;; Second, the waterproof at the root of the pipeline must be handled well.

after waterproofing is completed, it is necessary to do a closed water test to check whether the waterproofing is qualified, store water of not less than 21mm at the highest point of the bathroom, and go downstairs to check whether there is leakage after 48 hours, and check whether the door of your own bathroom is flooded (many people ignore this point).

2. Tiling

Tiling can be done after the waterproofing is qualified. Note that the cost of wall tile, ceramic tile and full tile paving is different. All tiles need to use tile adhesive, and the thin tile method is more expensive.

Brick sticking mainly pays attention to whether there are problems such as hollowing, butt joint of external angle and ground slope.

3. Ground leveling

If the floor is to be paved, it needs to be finely leveled to meet the requirements of floor paving; If it is a tiled floor, it can be roughly leveled. Under normal circumstances, the floor does not need to be roughly leveled when the house is closed, unless it is re-heated.

4. Other construction

At this stage, the walls and floor tiles have all been paved, and several tasks can be carried out: changing gas pipes, re-measuring cabinets, measuring ceilings, etc. The security door can also be installed at this stage.

5. Woodworking

Nowadays, many sumitomo people advocate simple style, and with the popularity of custom-made furniture, woodworking work is relatively less. Basically, it is simply to make a ceiling and make some furniture on the spot.

1, ceiling

gypsum board ceiling, pay attention to the corner position with L-shaped gypsum board, joint V-shaped groove, kraft paper, nail eye brush anti-rust paint, etc. If there is central air conditioning and fresh air, there may be more suspended ceilings.

2. On-site furniture making

If there is a carpenter with excellent craftsmanship, it is also a good choice to buy the board yourself and let the carpenter make furniture on site.

3. Booking of main materials

At this stage, the latex paint should be booked.

VI. Oil workers

Now the work of painting by oil workers has been greatly reduced, and more is painting walls, that is, latex paint.

1. grass-roots treatment

for the inequality of the top surface of the wall, grass-roots treatment should be carried out first to repair and find equality.

2. Putty and latex paint (wallpaper)

Generally, putty is scraped twice. Too thick putty can easily lead to wall cracking. Brushing latex paint is usually one primer and two topcoats.

there are two ways to brush latex paint, one is roller coating, and the other is spraying. Roller coating saves paint, and it is easy to repair damage in the later stage, but the effect is not as good as spraying; The spraying effect is good, and the paint film has good texture, but it costs paint and is not easy to repair if it is damaged in the later stage.

3. Booking of main materials

Booking of indoor doors, measuring ruler and floor.

VII. Installation stage

The decoration of the house has come out in general, and with the advancement of the installation stage, the house will become more and more plump.

1. Floor and skirting line

The floor has higher requirements on the ground, and the ground must be finely leveled. The baseboard can follow the floor or the door.

2. Indoor doors, door covers and window covers

If window covers are installed, the windowsill stone should be installed first (it is recommended to install them before putty is applied). The door covers here mainly refer to the pass, but of course, many minimalist styles do not need to install door covers.

3. Integrated ceiling

After the tile paving of the kitchen and bathroom is completed, the ceiling can be made.

4. Cabinets, kitchen appliances and bathrooms

Similarly, after the ceramic tiles of the kitchen and bathroom are finished, the cabinets, kitchen appliances and bathroom fittings can be installed. Pay attention to the installation sequence of cabinets, ceilings, hoods and gas water heaters.

5. Wardrobe

Generally, custom wardrobes are installed after the floor installation is completed.

6. Switches, sockets and lamps

Generally, electricians from regular decoration companies will come to the door twice to install the switch socket lamps (the main lamps usually need to be installed at a fee).

7. Cleaning

After all the things that need to be installed are installed, you can clean your home. Of course, cleaning once is often not enough.

VIII. Soft-fitting in

After cleaning, curtains, furniture, household appliances and other soft-fitting in can be arranged. After all these are done, you can prepare to move in.

the booking of the main materials mentioned above means the latest booking time. Of course, it is also good to inspect the main materials and auxiliary materials early and book them early.