Current location - Recipe Complete Network - Catering industry - Self-inspection report of special safety inspection
Self-inspection report of special safety inspection
Self-inspection report of special safety inspection (select 5 articles)

Time is silent, in a blink of an eye, the years are in a hurry, and a period of work has come to an end. Looking back on the work during this period, there are achievements and problems. Let's learn to write a self-inspection report together. How to focus the self-inspection report? The following is my carefully compiled self-examination report (5 selected articles). Welcome to share.

Self-inspection report on special safety inspection 1 According to the requirements of document (20XX)205 issued by the Health Department and Education Department of XXX Province on special rectification of school health safety, through special rectification, the responsibility consciousness of school health safety as the first person in charge of the school legal person is further strengthened, and the prevention and control management of school canteen hygiene, drinking water and infectious diseases is standardized. Under the instruction of the leaders in charge of the school, the medical department takes the lead, and the logistics service center and catering service center participate in organizing self-inspection. We have carried out relevant inspections on the new and old campuses, ethnic hospitals and western districts, and now we report the self-inspection of health and safety in our school as follows:

First, the school canteen hygiene

1. After receiving the document, the catering center of the new and old campuses shall organize the cooking management personnel of the whole center to convey the spirit of the document in time, strengthen the awareness of food hygiene and safety in schools, and put an end to the occurrence of food-borne diseases in schools. We have made a good inspection of this special rectification work. According to the quantitative classification management standards. Need to buy raw materials. The collective procurement system is implemented, and the procurement team of four people is fully responsible for the procurement of new and old schools. Bulk materials (grain, oil, meat, noodles) are collectively purchased through competition, realizing "integration of licenses"; The storage of food raw materials, semi-finished products, finished products and surplus food meets the hygiene requirements; Tableware disinfection process is standardized, and both new and old campuses have special disinfection rooms and storage rooms; Hold a valid health permit, and all on-the-job personnel have passed the health examination and hold a valid health certificate. The sanitation of the National Guard and the Western Dining Hall also basically meets the relevant requirements.

2. During the inspection, we also found the sanitary problems in the canteen. There are fly prevention measures in the catering center of the new campus, but the use effect is not good, and the fly prevention measures in the national nursing canteen are not in place; Some vegetable cleaning methods do not meet the requirements of nutrition and hygiene; Cold food processing does not meet the hygiene requirements; When selling food, the health protection measures of the staff are not in place. During the inspection, we require that corresponding corrective measures be taken.

Second, drinking water.

Drinking water in all parts of our school, including secondary water supply, meets the hygiene requirements. Hold a valid health permit; All employees have passed the health examination and hold valid health certificates.

Three. Prevention and treatment of infectious diseases

The school is a place where the population is concentrated, and our school attaches importance to the prevention and treatment of infectious diseases among students. The faculty and staff of the whole school are required to "establish the concept of health first in school education", take active actions, take prevention and active response to public health emergencies as a major event in the school, and do a good job in health work in our school. In order to ensure rapid response, strong control and coordinated operation to public health emergencies, the Emergency Plan for Public Health Emergencies in XXX Medical College was formulated.

Use school newspaper, radio, wall newspaper, campus network and special lectures to widely publicize health knowledge, cultivate students' good health habits and improve their awareness and ability of disease prevention. Actively carry out group prevention and control and the dissemination of popular science knowledge; Conduct health knowledge lectures. Health workers organize to study the Law on the Prevention and Control of Infectious Diseases and the diagnosis and treatment of common infectious diseases.

We also checked the hygiene of teaching and dormitory and environmental sanitation, and the overall situation was good. The sanitary preference of female dormitory is better than that of male dormitory. What is particularly commendable is the male dormitory in the old campus 1 16. The conditions are average, but the hygiene is very good. Two or three dormitories in the five-year experimental class for boys in the new campus are dirty, and cigarette butts are everywhere. In order to strengthen the rectification.

Through self-examination and self-correction, our awareness of health and safety prevention has been further enhanced.

Self-inspection report of special safety inspection 2 In recent years, with the rapid development of the construction industry, the incidence of fire on construction sites in China has been rising. According to statistics, fires in construction sites account for a considerable proportion. Based on the present situation of fire safety work in construction sites, this paper briefly discusses how to do well the increasingly severe fire safety work in construction sites.

First, the current situation of fire safety work in construction sites

1, the subject consciousness of fire safety responsibility is weak. Many construction units, construction units, did not seriously implement the fire safety responsibility system, did not conclude a fire safety responsibility contract, employees have poor fire awareness and lack of basic fire knowledge.

2, did not establish and improve the fire safety management system and fire control organization. Most units have not formulated emergency evacuation plans for fire fighting, provided pre-job training and fire safety education and publicity to employees, and the system has not been effectively implemented.

3. There are many temporary buildings with low fire resistance. Temporary buildings such as sheds, warehouses, canteens and dormitories on construction sites are mostly made of combustible materials such as bamboo, wood, linoleum and plastic, which have low fire resistance. At the same time, scaffolding and safety protection materials used in construction often use flammable materials, and a large number of flammable and combustible materials such as linoleum, wood, paint, plastic products and decoration materials are stored and used in the construction site for temporary stacking.

4. Poor fire management and no fire safety measures. Because cooking, asphalt boiling, illegal use of electric furnace, baking and heating in the construction site require naked flame and welding operations, it is easy to cause Fei Huo and fire.

5. Poor power management, disorderly pulling wires, disorderly connecting electrical appliances, and overload of wires are all easy to cause electrical fires.

6. The configuration of fire fighting equipment and facilities on the construction site does not meet the requirements, and even many construction sites are not equipped with fire fighting equipment and facilities.

7. The fire escape is seriously blocked. Although some construction sites have set up temporary fire exits, they are filled with building materials such as cement and steel bars. When there is a fire, the fire truck can't pass.

8. The combustible materials in the building are piled up in disorder, which is easy to cause fire.

9, construction personnel mobility, crossover operation, management confusion, poor fire awareness. Construction projects generally go through four stages: foundation, structure, equipment installation, debugging and decoration. Therefore, all types of workers are often in a state of dispersed flow, especially in the middle and late stage of construction, the construction personnel of structure and equipment installation cross-operate, equipment debugging and interior decoration cross-operate. In case of national and provincial key projects, due to the large amount of work, several companies often undertake the construction at the same time. If the construction site does not strengthen the fire safety education for construction personnel, unified command and production scheduling, fire accidents will easily occur.

10, illegal operation and illegal construction by construction personnel are important factors causing the fire.

Second, the cause of the fire on the construction site

1, electrical wiring overload, short circuit and excessive contact resistance cause flammable and combustible materials to catch fire. The main reason is that the construction workers randomly pull temporary power lines, the resistance of electrical switches and distribution boxes is too large, the wire diameter of electrical lines does not match the power load, copper wires and iron wires are used instead of fuses, and improper handling of wire joints causes fires.

2. Illegal welding operations. At the construction site, welding operations are needed in many places. Because most electricians have not been specially trained, some of them have been trained, but there is a lack of strict management in construction, and the phenomenon of illegal operation is quite common. In addition, the site management is chaotic, and all kinds of flammable materials can be seen everywhere. These combustible materials are easy to catch fire when exposed to hot welding slag.

3. The management of kindling is lax. Comrades who smoke in construction sites are quite common. Most of these people don't have a strong sense of fire prevention. Some dangerous gas sites smoke, some combustible goods yards smoke, and burning cigarette butts can still be seen everywhere. Once these kindling meet combustible materials, it is easy to cause fire accidents. In addition, poor management of mosquito-repellent incense, candles and other kindling in the dormitory of the construction site is also one of the reasons for the fire on the construction site.

4. Inadvertently using fire to cause fire in life. Including when cooking in the canteen, the fire flew out of the chimney and landed on the flammable shed cover, causing a fire; After cooking, improper handling of fire causes fire; The fire chimney bakes combustible materials for a long time, causing a fire. In winter, the shed is heated, and the flammable materials near the iron chimney of the stove are baked, resulting in a fire.

5, lighting electricity confusion. The electric lighting in the construction site, especially at night, is mostly temporary and the wires are scattered. Therefore, the laying of power lines is irregular and random, and the fixing of lighting lamps is unstable, close to flammable and combustible substances, which is easy to cause fire accidents.

6. Flammable and combustible. Due to the storage and use of a large number of linoleum, wood, paint, plastic products and their decoration materials on the construction site, it is easy to cause combustion when exposed to open flames and welding sparks.

Three, completes the construction site fire safety measures

In view of the present situation and hidden dangers of fire safety in construction sites, in order to ensure the safety of life and property of construction site personnel and avoid fire accidents, the author believes that fire safety in construction sites should be done well from the following eight aspects:

1, earnestly implement the fire safety responsibility system. The construction unit and the construction unit shall sign a safety responsibility contract, establish a fire safety organization, and have a special person responsible for the fire safety work at the construction site;

2. The construction unit shall conduct fire safety education and pre-job training for employees, and conduct regular fire emergency evacuation drills. Because most of the employees of the construction unit are composed of migrant workers, sometimes they are convened temporarily, and there is great mobility in and out. They have not received special training and lack the knowledge of fire prevention and self-help. The local public security fire control, safety supervision and labor departments should assist the construction unit to do a good job in fire safety training for employees.

3. Establish a strict fire and electricity management system. It is an effective method to manage, standardize and educate people with the system. Using fire and electricity well is a very important measure to avoid fire accidents in capital construction sites. It is particularly worth mentioning that dangerous operations such as electric welding and paint boiling should be subject to strict hot work approval system, and all non-professionals are not allowed to engage in inflammable and explosive goods operations without hot work approval.

4. Strengthen the safety management of the construction site. Smoking should be prohibited on the construction site. Once smokers are found, they must be dealt with seriously. Moreover, employees' dormitories are not allowed in the building under construction. The construction unit shall inspect the safety of the construction site every day, and the person in charge of construction shall inspect and supervise the safety of the construction site from time to time.

5. Strengthen the management of combustible materials and building materials on the construction site. Combustible materials should keep a certain distance from the open flame point, especially the amount of quicklime is large, and its fire risk is easily overlooked, so it should be stored in separate warehouses. Building materials such as cement and steel bars are not allowed to be stacked on the fire escape. In order to prevent fire, the construction site should be equipped with sufficient fire-fighting equipment and facilities, and the fire-fighting equipment and facilities should be maintained regularly;

6, public security fire departments at all levels, police stations and safety supervision departments, should strengthen supervision and inspection. Conduct regular safety inspections on the construction site, and if fire hazards and illegal acts are found, it shall be handled on the spot or ordered to make corrections within a time limit. If the fire hazards are still not rectified after review, the construction unit and its responsible person shall be dealt with in accordance with the relevant provisions of laws and regulations on fire control and safety production.

7, the construction unit should strengthen the management of fire safety in production and life. For example, when using stoves for engineering maintenance and personnel heating in winter, it is necessary to ensure that stoves and iron chimneys keep enough distance from combustible materials.

8. The construction unit shall use special workers with qualification certificates, such as electricians, welders and gas welders. It is strictly forbidden to work without a license, and such personnel should be regularly trained in fire safety.

With the continuous strengthening of the socialization of fire control work, the fire awareness of construction units and engineering supervision units has been continuously improved, and the awareness of the subject of fire safety responsibility of construction units has been enhanced, and the fire on construction sites will be effectively curbed.

Self-inspection report of safety special inspection 3 According to the document number xxX office [20xx] and the relevant instructions of the government construction management department, the project department held a safety meeting of the project department on the afternoon of xx, xX, xx, and the on-site person in charge anonymously organized the main management personnel of the project department and the main personnel of the team to conduct a comprehensive safety self-inspection of the division and subdivisional work with greater safety production risks on the construction site. The contents of self-inspection are as follows:

I. Use of field equipment:

At present, our large-scale mechanical equipment has two qtz63 tower cranes and other small and medium-sized equipment for inspection. The filing, installation notification, inspection report and use registration procedures of the construction crane (tower crane) are complete, which meets the relevant requirements of lifting equipment management. The main equipment operators all hold special operation certificates.

Second, the scaffolding engineering situation

At present, the south vertical surface of Building No.2 is floor-standing scaffolding, and the other three surfaces are cantilever scaffolding with a height of 5.4m The second floor construction has been effectively protected. During the inspection, it was found that the rigid closure of the cantilever first floor was lagging behind, and the vertical poles in individual positions were more than 300mm away from the edge of the structure. In addition, the on-site formwork support system was inspected, and it was found that some parts of the second-floor structural support system of Building 2 were missing. The team members were required to organize personnel to complete the rectification according to the special plan and safety technical disclosure on the same day.

Third, the office, dormitory fire situation

The oxyacetylene in the on-site warehouse should be given safety warning, used and placed within a safe distance, and the number of fire-fighting equipment is basically sufficient. Fire extinguishers have been set at the timber yard on site, and the fire fighting equipment is managed by special personnel. No high-power electrical appliances were found in the dormitory, and the fire exits, emergency evacuation exits and safety exits were clear.

After this inspection, the safety management personnel of the project department strengthened the inspection of lifting equipment and safety protection, made a rectification plan for the found violations, and made it clear that the rectification measures were eliminated in time; In the next step, we will firmly establish the policy of "safety first, prevention first and comprehensive treatment", enhance the awareness of safety responsibility and truly implement safety production.

Self-inspection report of special safety inspection 4 Recently, there were three consecutive fire accidents of temporary light steel structure prefabricated mobile homes in the construction site of our city, which did not cause casualties, but caused certain property losses and adverse social impact. In order to draw lessons from fire accidents and strengthen fire safety management on the construction site, the relevant requirements are hereby notified as follows:

First, attach great importance to and implement responsibilities.

All units should firmly establish the awareness of "safety first", attach great importance to the fire safety management at the construction site, and thoroughly implement the Emergency Notice on Further Strengthening the Fire Safety Work at the Construction Site (No.1February12004 102). XX7 14 issued by the Construction Committee) and the Notice on Forwarding the Notice of the Provincial Housing and Construction Department (No Chengjian Construction Committee XX 12), it is necessary to strengthen organizational leadership and implement institutions, personnel and responsibilities. The company regularly organizes special inspections, the project department implements the fire safety responsibility system with the project manager as the first responsible person, and the safety officer leads the team to carry out special inspections on fire safety every week, and the safety officer tracks and eliminates the hidden dangers detected to ensure the implementation of fire safety measures.

Second, strict standards to strengthen fire safety

(A) to strengthen the management of fire safety on the construction site. The construction site should establish and improve fire management rules and regulations, implement strict target responsibility management, and implement target responsibility to every level and everyone. Strictly control the purchase of products, and must use a dense mesh safety net that meets the requirements of flame retardant and achieves the purpose of XX. Strict hot work examination and approval system shall be implemented for open flame operations such as electric welding, and operators shall hold relevant certificates, and hot work guardians shall be set up for on-site monitoring. When working with naked flame, inflammable and explosive articles and devices must be avoided, and the site should be carefully cleaned after operation to prevent dark fire. It is strictly forbidden to engage in operations such as paint that are easy to generate volatile gases within the scope of open flame operation; When using volatile substances, the container should be closed at any time, and the wiped cotton yarn and other items should be stored centrally and away from heat sources. Smoking is strictly prohibited on the construction site. Cutting and welding on running pipelines, inflammable and explosive containers and stressed components are strictly prohibited. Temporary houses, warehouses, storage tanks and stacking materials for various purposes should be reasonably arranged to ensure sufficient safe passage and protective spacing. The safe passage should be kept clear and marked with eye-catching signs.

(2) Strengthen the management of mobile homes. The design, manufacture, installation, disassembly and use of the mobile home must be carried out in strict accordance with the Technical Specification for Temporary Buildings on Construction Sites (JJ/T188-XX), and meet the requirements of the Interim Provisions on the Management of Temporary Light Steel Structure Assembled Mobile Houses on Construction Sites in Chengdu. The installation of the activity room shall meet the following fire protection requirements:

1. A fire escape with a width of not less than 4m should be set around the site of the mobile house, and it should be equipped with a fire water source.

2. The distance between the activity room and inflammable, explosive and dangerous goods shall not be less than16m, and the canteen and dormitory shall be set separately.

3. Two-story mobile home, when the construction area of each floor is more than 200 square meters, at least two safety exits or evacuation stairs should be set; When the building area of each floor is not more than 200 square meters and the number of users on the first floor is not more than 30, only one safety exit or evacuation staircase can be set. The distance between movable buildings is not less than 3.5 meters.

4. Movable houses should not be built with more than two floors, and the fire resistance rating should meet the requirements of Grade 4. If there are more than two floors, it should be implemented according to the current national code "Code for Fire Protection Design of Buildings" gb500 16.

5. The decorative materials such as wallboard and doors in the mobile room should meet the fire protection requirements.

6. Every movable room of 100 square meter shall be equipped with at least two fire extinguishers with a fire extinguishing level of not less than 3a, and appropriate fire-fighting places such as kitchens shall be added.

7. The installation of wires in mobile homes must meet the requirements of specifications. First, all electrical lines should be exposed with flame retardant pipes; Second, the lamps and lanterns should keep a safe distance from the board wall, and the wires must be covered with porcelain pipes or other non-combustible plastic pipes when passing through the color steel sandwich board wall; Three, distribution lines should be equipped with intelligent current limiter, lighting lines should be separated from socket lines, socket lines should be equipped with leakage protectors. Three-story or single-story activity rooms with an area of more than 200 square meters must be equipped with intelligent power limiting devices.

(3) Strengthen the use and management of mobile homes.

After the installation of the mobile home is completed, it should be accepted before it is officially used, and the acceptance materials such as the factory certificate, the installation completion acceptance form, and the fire control acceptance report of the mobile home products should be provided. In the process of use, it is necessary to strengthen personnel education and implement the following fire prevention measures:

1. Electric cookers, electric stoves, electric cups, electric rods and other appliances are prohibited in the activity room.

2. It is forbidden to pull and connect wires in the activity room.

3. It is forbidden to pile up inflammable and explosive articles in the charging area of mobile phones.

4. The prefabricated houses cannot be used as dangerous goods warehouses and power distribution rooms.

Third, strengthen education and improve fire safety awareness.

Construction units should take fire safety education as an important part of "three-level education" on the construction site, fully popularize fire laws and regulations and common sense of using fire, electricity and gas, so that employees can understand fire requirements, enhance fire awareness, master fire knowledge, abide by fire laws and regulations, improve self-prevention and self-rescue ability, actively carry out mass prevention and treatment, and create a social atmosphere of "knowing fire, paying attention to fire and participating in fire fighting" to prevent fire accidents.

The fourth is to strengthen supervision and investigate fire hazards.

Decided to carry out special fire safety inspection activities on construction sites in our city. The activity time is from April to May in XX, and it takes two months to investigate and rectify the fire safety hazards of construction sites in the city.

All construction, supervision and construction units should immediately organize personnel to conduct a comprehensive self-examination and self-correction on the construction site, focusing on checking the setting of fire-fighting equipment and facilities, the management of flammable materials on the construction site, the fire prevention management of mobile houses, the safety of electricity for temporary construction, and whether the operation of operators meets the operating procedures. Once fire safety hazards are found, they must be eliminated immediately to ensure that there are no dead ends and loopholes in the inspection.

District (city) County Construction Bureau, municipal safety supervision station and municipal quality supervision station shall strengthen the supervision and management of fire safety on the construction site. First, combined with local characteristics, carry out special inspection activities on fire safety in construction sites; Second, it is necessary to review the starting conditions, and strictly review the relevant design, installation, acceptance and handover materials of the mobile house when reviewing the starting conditions; Third, strengthen daily supervision and management, and urge the construction site to comprehensively investigate and eliminate fire hazards. If a fire hazard is found, it is necessary to urge its on-site rectification, and the relevant responsible units and responsible persons who are ineffective in rectification should be seriously investigated for responsibility. At the same time, bad behaviors will be recorded in accordance with the Implementation Rules for the Management of Bad Behavior Records of Main Body in Chengdu Construction Market, and the mobile home production enterprises that caught fire due to unqualified flame retardant materials will be publicized.

All district (city) and county construction bureaus, municipal safety supervision stations and municipal quality supervision stations are requested to summarize the special fire safety inspection activities on the construction site and report them to the Quality and Safety Department before May 3 1.

Self-inspection report of special safety inspection 5 Our school earnestly implemented the Notice of Tongwei County Education and Sports Bureau on Forwarding the Emergency Notice of the Municipal Education Bureau to the Provincial Department of Education and the Provincial Public Security Department on Strengthening the Traffic Safety Management of Primary and Secondary School Students and Strictly Using Agricultural Vehicles to Pick Up Students, specially convened a meeting of all teachers to further strengthen the road traffic safety awareness of teachers and students in our school, and immediately set up a special inspection team to carry out this work, and on June 5, 5438+065438+1October 5, conducted a traffic safety inspection on the roads around our school.

First, school bus safety management

There is no school bus for students to go to and from school in our school.

Second, the management of student social transportation vehicles

There are no organized clubs in our school to pick up and drop off students. Moreover, teachers often educate students not to go to school in vehicles without operating qualifications.

Three, the illegal carrying of student vehicles and road traffic violations around the school are monitored.

1. Our school is located in the countryside, and there are few vehicles at the school gate. There is no traffic disorder such as "parking motor vehicles at the school gate, turning around at will, speeding, retrograde, honking at will, and setting up stalls to occupy the road". At the school gate, there is a billboard of Tongwei County Traffic Management Brigade "School ahead, courtesy students".

2. There is no "black car" to pick up and drop off students at the school gate, and there are no illegal acts and phenomena such as illegally operating passenger cars, low-speed trucks, three-wheeled cars, tractors and illegally assembling cars.

Our school often holds team meetings and class meetings to educate students to obey traffic rules and not to take illegal vehicles.

Four. Setting of road traffic facilities around campus

In our school, at the school gate and the surrounding intersections, during the peak hours when students go to and from school, teachers and student cadres are arranged on duty every day to direct and guide the evacuation of students to and from school. The school has established a road team system and implemented it conscientiously, ensuring the road safety of students going to and from school.

V publicity and education on road traffic safety for students

1, our school often carries out road traffic safety publicity, and carries out safety education and persuasion and traffic guidance for students;

The main modes of transportation for students in our school are walking and cycling.

3. Our school often warns parents and educates students not to take unlicensed and unlicensed vehicles, overcrowded vehicles, trucks, tractors, motorcycles and other non-operating vehicles through parent-teacher meetings and letters to parents, and consciously resists all kinds of illegal acts;

4. Under the long-term education and study, teachers and students in our school have a good sense of traffic laws and regulations, safety awareness and civilized and safe travel habits.

Through the long-term development of traffic safety education activities, parents feel at ease about their children's study at school, and at the same time, their social satisfaction with the school has been greatly improved. It can be said that all the safety education we carry out is targeted and effective, which supports and promotes all the work of the school and becomes the fulcrum and lever of moral education in the school. With the joint efforts of teachers and students in the whole school, the school safety work has been strengthened year by year, and gradually moved towards scientific and standardized management. For many years, there has not been a traffic accident in the school, and teachers and students can study and work at school with peace of mind. Teachers and students in our school will make persistent efforts to make greater achievements, satisfy the society and reassure parents!

;