Current location - Recipe Complete Network - Catering industry - Facilities and equipment of Chongqing Longmenhao Vocational High School
Facilities and equipment of Chongqing Longmenhao Vocational High School
Our school now has 22 majors such as computer and application, e-commerce, tourism service and numerical control technology, and 84 training rooms, which are fully equipped and advanced in facilities, and can fully meet the needs of professional education and teaching. Including: 5 computer software training rooms, 8 multimedia training rooms, 3 non-editing training rooms, 2 network training rooms, 1 integrated wiring training room, 2 e-commerce training rooms, 1 hardware training room, 1 office equipment training room, 1 accounting practice training room, etc. There are 4 body dance studios, 10 piano studio, 1 microteaching, 2 voice classrooms, 1 psychological consultation room, 4 garment sewing workshops, 1 plate making workshop, 5 studios, 2 animation studios, 1 metalworking training room and 2 pliers. Basic electrical and electronic laboratory 1, refrigeration training room 3, maintenance electrician training room 6, computer simulation training room 1, PLC training room 1, color TV training room 1. The total value of training equipment is 20.992 million yuan, and the average number of equipment students is 665.438+077.75 yuan (the average number of students in the first and second grades is 3398).

These include:

There are five computer software training rooms with an area of ***272.8 square meters, equipped with 250 multimedia computers.

8 multimedia training rooms, ***34 1 m2, equipped with 450 multimedia computers.

There are 3 non-editing training rooms with an area of 600.6 square meters, equipped with computers (160), SLR cameras (10), high-definition cameras (2), standard-definition cameras (20), large rocker arms (1) and small rocker arms (65438).

There are 2 network training rooms, ***775.2 square meters, equipped with computers (120), intelligent switches, routers, firewalls and other network equipment (16).

Integrated wiring training room 1 room, * * 1 30m2, large-scale integrated wiring training room equipment (4 sets), optical fiber welding machine (1 set), Fluke tester (1set).

Two e-commerce training rooms, * * * 2 13m2, equipped with computers (105), program-controlled switches (1) and telephones (50).

Hardware training room 1 room, ***68.2 square meters, equipped with computers (48 sets), small office equipment (24 sets) and multifunctional photocopiers (2 sets).

There is 1 office equipment training room, * * * 60m2, equipped with computers (48 sets), small office equipment (24 sets) and multifunctional photocopiers (2 sets).

There is 1 accounting practice training room, ***68.2 square meters, equipped with accounting training related equipment.

There are 8 simulation rooms, ***272.8 square meters, equipped with all the facilities and equipment of three-star hotel rooms.

There are 1 simulated restaurants, * *151.35 square meters, equipped with all the facilities and equipment of a three-star hotel restaurant.

There is a 1 music classroom, ***63.3 square meters, equipped with Harrison piano, TV, stereo and other equipment.

There are 4 body dance classrooms with an area of ***706.32 square meters and solid wood floors. Each dance studio is equipped with 42 handles and 5 1 lens. Teachers are equipped with 46 teaching videos, 46 music tapes and 6 tape recorders.

There is 10 piano room, ***306.9 square meters, equipped with 10 Harrison piano.

Microteaching room 1 room, covering an area of * * 68.2 square meters, is equipped with OHSAYO tape recorder 1 set, JVC camera 1 set, Nikon camera 1 set, multimedia teaching equipment 1 set, and 20 sets of desks and chairs for students.

There are 2 speech classrooms, *** 136.4 square meters, equipped with 108 sets of speech equipment.

There is 1 psychological consultation room, ***23.2 square meters, equipped with computer, test sand table, data cabinet, etc.

There are 4 garment sewing workshops and one plate-making workshop/kloc-0 each, with a total area of ***562 square meters. The training place is equipped with 534 electric high-speed sewing machines, sewing machines and steam irons.

There are 5 studios, with a total area of ***400 square meters. The training place is equipped with 200 painting benches, 20 sketching tables, 782 sketches of still life and other equipment.

There are 2 animation training rooms with a total area of *** 172 square meters. The training place is equipped with 120 copying table, 2 scanners, 1 linear camera, 1 computer, 1 camera and other equipment.

Metalworking training room 1, 70 square meters, equipped with common lathes, grinders, vises, drilling machines and other facilities, as well as various tools and measuring tools.

Two fitter training rooms, with an area of140m2, are equipped with facilities and equipment such as surface grinder, vise, bench, flat plate, grinder, drilling and milling machine, drilling machine, and various tools and measuring tools.

There are 4 CNC training rooms with an area of 14056 square meters, equipped with CNC lathes, grinders and other facilities, as well as various tools and measuring tools.

The CAD/CAM training room 1 room covers an area of 70 square meters and is equipped with teaching facilities such as computers and genuine software.

Basic electrical and electronic training room 1, with an area of * * * 70m2, equipped with electronic experimental platform, oscilloscope, electrical control circuit board and other electrical and electronic training equipment.

There are 3 refrigeration training rooms with an area of ***370 square meters, equipped with advanced facilities and equipment such as refrigerators, air conditioning simulation facilities, teaching boards and welding tools.

There are 6 training rooms for maintenance electricians, with an area of ***420 square meters, equipped with comprehensive assessment devices for maintenance electricians 103 sets.

There is a 1 computer simulation room, ***70 square meters, equipped with 50 advanced teaching computers and related electrical professional software.

PLC training room 1, with an area of ***70 square meters, electrostatic floor, equipped with comprehensive equipment such as PLC experiment box, single chip microcomputer examination table and hot air gun.

There is 1 color TV training room, ***70 square meters, equipped with advanced equipment such as CRT, LCD TV, hd projector and DVD player.