Current location - Recipe Complete Network - Catering industry - Work summary of workshop production staff
Work summary of workshop production staff

Model essay on the work summary of workshop production staff (5 general articles)

Time is unconscious, but we realize in hindsight that the hard work has come to an end. Looking back on this period of time, the achievements we have made are actually hard-won. We should review and sort it out and write a good work summary. In order to make it easier and more convenient for you to write a work summary, the following is a sample work summary for workshop production staff (5 articles in general), welcome to read and collect.

summary of workshop production staff's work 1

In the past year, under the careful care and guidance of leaders and colleagues, I have made some achievements in my work through my unremitting efforts, but there are also many shortcomings. Now I will summarize my work in the past year as follows:

1. Ideological and political performance, moral cultivation and professional ethics

In the past year, I have earnestly observed labor discipline, attended work on time and used my working hours effectively. Stick to your post, need to work overtime to finish the work on time, and ensure that the work is completed on time.

II. Daily work

My job is workshop statistics, which is mainly responsible for statistics and reporting the daily production of the workshop. In the past year, through the daily sorting and analysis of quality records, we can basically report all kinds of production data to superior leaders in time.

besides, it is a long-term and arduous task to collect all kinds of production data and calculate the production cost. Through the cost accounting, we can know more clearly from which aspects to control the cost, so as to reduce the cost and improve the company's efficiency.

Third, strengthen my own study and improve my professional level

I have been working for nearly five years, but my own quality and professional level are still far from the actual requirements of my work. However, I can overcome difficulties, study hard, correct my work attitude, actively consult and learn from other comrades, do my job well in a down-to-earth and earnest manner, and persist in integrating theory with practice to apply what I have learned. Not only should we be able to bury our heads in our work and work selflessly, but we should also be able to check every detail of our work when we look back, summarize and analyze our work experience, and try our best to make our work procedural, systematic, organized and streamlined from how to save time and improve efficiency! Thus, in the 111-foot club head, we will go further, reach a new level, enter a new realm and create a new chapter!

IV. Shortcomings

Over the past year, I have been able to devote myself to my job and creatively carry out my work, and I have made some achievements, but there are also some problems and shortcomings:

1. Many jobs are groping while doing, so that I can't work with ease, and my work efficiency needs to be further improved;

2. Some work is not careful enough, and some work is not well coordinated;

3. My theoretical level needs to be further improved.

after such a tense and orderly year, I feel that my work skills have reached a new level, and I have a clear plan and steps for doing every job, a direction for action, a goal for work, and a real bottom in my heart! Basically, we have been busy but not chaotic, tight but not scattered, clear in organization and clear in everything, and fundamentally got rid of the phenomenon that we only worked hard and didn't know how to sum up experience. In this way, I walked into this year from infinite busyness, and walked out of this year from infinite ease. When xx year came to me, I just wanted to say, come on, I have grown up from work!

also, while working, I also understand the truth of dealing with people, and how important it is to have a good attitude, a passion for work and a sense of responsibility in contrast.

To sum up, I have come into contact with many new things, produced many new problems, and learned a lot of new knowledge and experience in this year's work, which has improved my ideological understanding and working ability. In my daily work, I always ask myself to proceed from reality, adhere to high standards and strict requirements, and strive to improve my professional quality and moral quality.

21xx is a brand-new year and a year of self-challenge. I will continue to work hard, report my thoughts and feelings in my work to my leaders, correct and make up my own shortcomings in time, do a good job in the new year and do my part for the development of the company. Work summary of workshop production staff 2

21xx years have passed in tension and busyness. Under the correct decision and leadership of the company's leaders and the close unity and hard work of all the staff in the workshop, the production tasks assigned by the company have been successfully completed. Looking back on the work in 21XX years, the workshop has mainly done the following work on the premise of completing production tasks around safety production and ensuring quality and quantity:

1. Production management, finished output and product quality

1. Production management: according to the production plan issued by the company according to product sales, we can arrange production reasonably and ensure daily production and normal delivery. The workshop also overcame the difficulties of heavy production tasks and insufficient personnel, and carried out alternating production between xx workshop and xx workshop. In order to ensure the completion of production tasks, many employees came to work overtime late at night and went to work normally the next morning. In the aspect of entrusted processing, the on-site monitoring of entrusted processing of X Pharmaceutical and xx Pharmaceutical was completed respectively.

2. completed output: xx soft capsules ***x batches, x capsules ***x batches and x tablets ***x batches will be produced in 21xx.

3. product quality: while ensuring the completion of production tasks, the workshop attaches great importance to ensuring product quality. Strictly manage employees according to the requirements of xx, and require employees to strictly implement standard operating procedures. Problems such as xx occurred in the workshop in 21xx, and the production workshop conducted research in various forms, such as holding a special analysis meeting, constantly summing up experience, and the product quality was steadily improved. We believe that as long as every employee in the production workshop has a high quality consciousness and puts it into every link of production operation, the product quality will be improved steadily.

2. Hardware

1. A new aluminum-plastic packaging machine was purchased in the solid preparation workshop, and the equipment was installed and debugged, which has been put into production.

2. For the maintenance of the constant temperature and humidity machine, the problem of micro-leakage of freon in the compressor of this equipment was eliminated through inspection.

3. Improve the water leakage of the technical mezzanine sewer in the solid preparation workshop.

4. Cracks were found in the pressure fixing parts of the tablet press, and they were repaired in time.

5. The performance of the original air compressor in the workshop is aging, which can't meet the production requirements. A new air compressor is purchased, put into use after debugging and installation, and the original air compressor is kept in the original system for backup.

6. The tap water pipeline downstairs in the workshop leaks, and the pipeline shall be reformed in time.

7. the air compressor is equipped with an oil-gas separator.

8. Replace the glue outlet valve.

9. The dripping phenomenon of the constant temperature and humidity unit was repaired.

11. The daily maintenance of production equipment ensures the smooth progress of production.

Third, software

1. Upgrade the original file system to make it more in line with GMP requirements.

2. The preventive maintenance plan of the equipment is made.

3. archive the data of the newly purchased aluminum-plastic packaging machine, formulate the verification scheme and report, and complete the verification of the newly purchased air compressor.

4. Formulate the retrospective verification scheme and report of motherwort soft capsule products.

5. Complete the retrospective verification of XX, XX and XX products in the established XX workshop.

6. complete the re-verification of the established public system and the main equipment in the solid preparation workshop.

7. Sketch the process layout of the new workshop, and complete the contents of URS on production, public system and extraction, and provide them to the design unit.

8. go through the formalities for reporting the extension of xxx entrusted processing.

IV. Personnel management

1. With the increase of production tasks, many new employees have entered the production workshop one after another. After passing the pre-job training examination, the workshop will train new employees in the form of on-the-job training and taking the old with the new to ensure that new employees can smoothly enter various positions and roles. Now new employees are basically qualified for this position.

2. new employees, especially young people, are encouraged to enter the main operating positions, which enhances the technical reserve of workshop operators.

3. According to the requirements of xx, the workshop staff were trained and evaluated.

4. The company promoted the competent and thoughtful employees to the workshop management positions, and the production workshop gave full play to their subjective initiative, and the workshop management was further strengthened.

5. The management personnel at all levels of production are clearly divided, and the responsibility lies with people. Workshop production staff work summary 3

In a blink of an eye, I have been working in the production workshop for more than two months. During this time, I can conscientiously complete all the tasks arranged by the workshop leaders. I know that I need to show myself well during the probation period before I can become a regular employee, so I can keep in mind the responsibilities of the workshop staff and work hard for collective development. At this stage, my work ability has been greatly improved than before. Now I will briefly summarize the work I have done in the workshop during the probation period.

I plan my own work according to the production process. I understand that if I want to do a good job in the workshop, I should pay attention to the accumulation of basic experience. Only when I have a solid foundation can I start my work effectively. Therefore, I can do a good job in accordance with the operating norms on the premise of observing the system, and I also pay attention to safety in production, so as to better complete my job. Through in-depth analysis of the workshop work, I can understand the methods to improve efficiency. I will also communicate with my colleagues to understand their specific practices at work, so as to learn from them and guide my direction in the workplace. Although there are still problems of low efficiency, I can work hard to improve the status quo. I have to continue to do my job well and set higher goals on the basis of existing production indicators.

I have strengthened the study of production technology so as to be better qualified for this job. I have attached great importance to the study and application of production technology since I joined the company. I understand that the lack of experience accumulation is a problem that I need to solve as soon as possible in the workplace, which also means that I need to concentrate on my work in the workshop. Therefore, I can arrange my work according to the monthly production index, strive to complete the monthly production on time and ensure the quality, that is, reduce the probability of defective products so as to be more rigorous in my work.

I actively participate in all aspects of workshop work in order to better exercise myself. In order to deepen my understanding of my responsibilities, I will participate in all aspects of work, hoping to become a qualified employee through my familiarity with workshop work. Moreover, I need to accumulate a lot of practical experience during the probation period, so I need to devote myself to workshop work more attentively. Therefore, since I joined the company, I can deeply understand the importance of doing a good job in the workshop, and I will also write a good work log and make an in-depth analysis of it, even if I compare it with my previous self, it can also play a role in finding leaks and filling gaps.

I pay more attention to the completion of the work through the review of the probation period, so I will continue to do a good job in the workshop according to the instructions of the leaders, and I hope that I can perform better in the workshop work through this rigorous attitude. Work summary of workshop production staff 4

In the first half of the year, with the support of the municipal party committee and the municipal government and under the leadership of the Municipal Construction Committee, we worked hard around the goal of creating an excellent tourist city in China. In the planning and law enforcement, 155 illegal buildings were investigated and dealt with. Participated in the comprehensive improvement of urban traffic order in the city, standardized nearly 111 trips of motorcycles and taxis every month, and the traffic order of urban main roads has improved obviously. In the management of city appearance, * * * investigated and dealt with the occupation of roads and mobile stalls for more than 1,211 times, collected more than 3,111 illegal advertisements, and cleaned up more than 611 irregular outdoor advertising banners. Through the above work, the city appearance, environment and living order have been further optimized, the dynamic illegal activities in the city have been further controlled, and the overall level of urban management has been further improved.

1. Investigate and deal with illegal construction and promote key projects

In order to ensure the smooth progress of the comprehensive renovation project of Qingxi River, the municipal government issued the Notice on Renovating Illegal Construction in Urban Planning Area according to Law on March 24, and the detachment focused on the investigation and punishment of illegal construction in the sections along the Qingliu River from Yanliuyuan to the south outer ring, with an illegal construction area of 6,111 square meters. The municipal urban management detachment, together with the personnel deployed by the district government and offices, conducted a detailed investigation, education and mobilization on illegal construction according to law. Remediation mainly adopts the method of combining forced demolition according to law and self-demolition. First, strict law enforcement procedures. From April 23rd to 29th, legal documents such as Notice of Ordering to Stop Illegal Construction and Notice of Dismantling Illegal Buildings within a Time Limit were issued to 155 illegal buildings in Huxin Road, Changjiang South Road, Qianjin Lane and Huxin Formation, respectively, and were publicized twice. The second is to adhere to both hands. In order to speed up the demolition work and reduce the number of demolitions. On the one hand, we will pay attention to forced demolition, on the other hand, we will continue to pay attention to policy and legal propaganda and ideological education for illegal households, mobilize illegal households to demolish themselves, consolidate the effect of educational mobilization, and expand the scope of self-demolition. The third is to take measures at the same time and select points for demolition. Make a demolition plan in advance. First, the judicial compulsory demolition will be implemented, and then 61 people will continue to be transferred to the rest of the plots to do ideological education and mobilization work, so as to strive for the demolition of most illegal households. Fourth, careful organization and arrangement. At the beginning of the demolition of illegal construction, the urban management detachment made a lot of preparations. Timely formulated and submitted the Report on Renovating Illegal Buildings in Urban Planning Area according to Law, the Implementation Plan for Comprehensively Renovating Illegal Buildings in Urban Areas according to Law, and the Implementation Plan for Stopping Illegal Construction along the banks of Qingxi River according to Law. At the same time, we will increase publicity efforts, draw up propaganda slogans, dispatch propaganda vehicles, and cooperate with newspapers, radio stations and television stations to publicize. Due to the solid and meticulous preliminary work, on May 8, Wang Xiaoming's household was judicially forced to demolish illegal buildings. At the same time of forced demolition, the detachment continued to do ideological mobilization work. On the second day, seven illegal buildings in Huxin Road Demonstration Farm signed an agreement to demolish themselves. Up to now, of the 155 illegal buildings in this plot, 1 have been forcibly demolished according to law, and 56 have been demolished by agreement, with a total area of 3,511 square meters, of which 28 have been demolished by themselves and the remaining 28 are being demolished by themselves, effectively promoting the construction of key projects.

Second, actively participate in traffic improvement to ensure urban traffic safety

In order to strive for an excellent tourist city in China, according to the unified deployment of the municipal urban traffic order comprehensive improvement headquarters, all members of the detachment will be organized to conduct a comprehensive improvement of traffic order with the public security traffic police, traffic management departments and other departments every month, and traffic violations such as motor vehicles, non-motor vehicles and stalls occupying roads, which are reflected by the masses, will be strictly managed. In the first half of the year, * * * investigated and corrected more than 1,611 traffic violations in accordance with the law, and seized more than 611 motor vehicles and more than 711 non-motor vehicles.