What are the steps of steaming room construction? What are the precautions in steaming room construction?

Sweating is a kind of health-preserving method that many users and friends like now. Leaving a hot sweat in the steaming room can help people detoxify to a certain extent. Therefore, there are more and more steaming rooms in cities now. When you choose a steaming room, you can choose one near you. However, there are still many matters that should be paid attention to when the store owner carries out the construction of his own steaming room. So today, we will make a concrete analysis on the construction of the steaming room.

What are the construction steps of the steaming room?

Ceiling, heat preservation at the top and installation of ceiling cloth. There are various shapes of the ceiling. Korean sauna rooms use ceiling cloth, Enron sauna rooms use nano-quilt, and some use other materials. Korean sauna room can be painted with energy powder on the ceiling, or it can be painted on the wall without the ceiling, and the effect is the same. The energy powder of the ceiling is mixed with putty powder and hung on the gypsum board or wood board of the ceiling. Pay attention to the reserved lamp line on the ceiling. To tighten the ceiling cloth, you can fix one side first, and then fix the other side after tightening.

wall-bound wooden keel frame. Install the extruded board, embed the extruded board in the wooden keel, keep the wall flat, and install gypsum board on the upper layer of the extruded board. (Gypsum board is used to level the wall surface and fix other materials conveniently) The wall surface is paved with reflective film, electric heating film, and the wall surface is paved with electric heating film, which is connected to the thermostat, and the temperature sensing probe provided by the thermostat is installed to conduct the power-on test. Make sure there is no abnormality before decorating the wall. (When the probe is not long enough, it can be extended by copper core wire with the same thickness, and it is recommended to use telephone signal wire).

lay non-woven fabric on the outer layer of electric heating film (non-woven fabric is used to hang energy powder, but it is not laid in enron nano steaming room), install bamboo curtain, mark it well, and don't nail it to the heating area of electric heating film and wires when nailing. Install the backrest, and don't nail the heating area of the electric heating film and the wires when nailing. Construction and paving sequence of electric heating film on the ground: the first floor: laying extruded board; the second floor: laying reflective film; the third floor: laying electric heating film; if laying floor tiles, the electric heating film needs to be covered with special bags, patented technology. The fourth floor: spread waterproof cloth, overlapping each other by 1.5 cm (if you spread floor leather, you don't need waterproof cloth) The fifth floor: floor, floor tiles, etc. If laying floor tiles, please mix a large bag of high-energy powder with sediment to make it 2-3CM thick, and then stick the floor tiles. If the floor is paved, the energy powder can be directly sprinkled under the floor for use.

what should be paid attention to in the construction of steaming room

laying method of heating cable: lay a layer of barbed wire on the reflective film (the area is small and unnecessary), arrange the cables and fix them with special clips, and do not overlap, with a minimum distance of 5CM. Connect the self-contained connector to the thermostat for power-on test. Brown is the fire line, the flower line is the ground line, and the other is the zero line. After the cable is laid, it can be directly paved with sediment.

Through our detailed introduction to the construction of the steam room in today's article, I believe that everyone has a better understanding of how to construct the steam room. In the first part of the article today, we mainly analyzed the concrete steps of the steam room construction and what matters needing attention in the construction process. Everyone will basically hire professional workers when constructing the steam room, but we still need to have a certain understanding of the construction steps of the steam room. I suggest you take a closer look at our contents.