the regional operation of the old market
This is the original condition that is most easily overlooked by the design, and it is also a very important condition. Often, when designing, after obtaining the original drawings, we begin to arrange and transform the plane plan and make the elevation renderings ... It is basically difficult to inspect the operating conditions of the old market; And this is an essential step for the transformation design.
first of all, whether the business conditions are good or not means whether the business scope should be expanded or reduced properly. If the business in the market is depressed and there are many empty stalls, it is reasonable to take the opportunity of upgrading and transformation to narrow the business scope and improve the market saturation, so as to really "save" a market, instead of simply completing the task of upgrading and transformation.
Secondly, whether there are dead corners in the market, and which positions are prone to empty stalls, analyzing the root causes will help to dig deep into the problems existing in the old market, and in the process of upgrading and reforming the design, we will focus on avoiding the existing problems. Only in this way can we have a clear aim and solve the actual problems.
For example, the business of the poultry area in an old farmer's market (some areas where live poultry trading is not explicitly banned) is bleak. After investigation, it is found that the original poultry area has a serious odor and is sultry, which leads to poor shopping environment and hot and sick poultry. Therefore, an independent fresh air system was designed for the poultry area in the renovation design, which changed the messy image of the poultry area in the old market and brought the whole area back to life.
Business models of various industries in the old market
Business models, which can also be called business habits, such as aquatic products trading, are used to showing the killed fish, and some consumers sometimes prefer to buy cheap fish for the sake of benefits. Therefore, in the design, it must be considered in advance to make the aquatic products stalls have the functions of display and on-site treatment. If this shopping habit is not fully understood in the design, both the business owners and customers will not be able to adapt after the transformation, which is a failed transformation.
However, the accommodation that can be made from the design level in the business model is limited, and the behavior that obviously violates the design norms or industry norms must be corrected. For example, the open operation of the lo-mei cooked food area obviously violates the design specification that the display of goods in the lo-mei area needs physical partition, so it cannot be compromised in the design.
which business models and shopping habits that do not violate the principles must be respected and preserved, and which bad habits must be corrected. This is not only a difficult point in the design process, but also has a certain connection with the philosophy of dealing with people. It is a life topic to complete the work objectives and take into account various requirements at the same time.
Original building conditions
This article is a very simple condition, which is not easy to be ignored, but it is easy to be taken for granted that it is absolutely no problem to do reconstruction design according to the original data; But this is often not the case. Some projects are very old, although the original data can be tested, but the accuracy is not high. In this case, we should not rely on the original data, but should go to the site for review. There are many conditions that need to be rechecked. For example, the thickness of the ground cushion can often refer to the data on the original drawings, and the drainage scheme can be designed according to the thickness of the original ground cushion. However, an accidental deviation will lead to a great deal of rework in the implementation process of the drainage project of the whole project, which will be a waste of cost.
after receiving the renovation design task, you should go to the project site to check the drawings as soon as possible, not only carefully check the plane layout, but also the concealed works that are easily overlooked, such as water and electricity, which need to be checked again and again.
only by mastering accurate original data can we ensure that the design is targeted and accurate.