Current location - Recipe Complete Network - Catering industry - What do owners of half packages need to buy
What do owners of half packages need to buy
Question 1: What do I need to buy if I choose semi-contracted decoration? Changde side of the half package is the package cement sandstone, labor, cabinet panels, gypsum board, paint, and all other buy their own.

The things you need to buy are very much: floating

Tiles, flooring, overall cabinets, sanitary ware (including bathroom cabinets, toilet, squatting, shower), wires and sockets, plumbing and ancillary, finished doors, sealing balconies, lamps, cabinets, hardware, aluminum button board ceiling, hey too much. Difficult to get

Simple way: you want to decorate a list of companies to you. The general decoration company will have

Question 2: half package decoration, what do you want to buy ah. Half-package decoration company mainly package construction and auxiliary materials Dan you need to buy may include

bathroom, tiles, flooring, integrated ceiling, lamps and lanterns, switches, hardware, set of doors, cabinets, and some late appliances, curtains, sealing the balcony and so on

Problem three: the decoration of the half-package owners specifically need to buy what materials Detailed in the contract attached to the list of quantities of work, the renovation of the project needs to be used but not the list of engineering

Question three: renovation half-package owners specifically need to buy what materials See contract attachment, but the project needs to buy what material. The list is not, is what you need to buy.

Question four: half of the renovation owners need to buy what materials to the main materials: tiles, power cables, switches and sockets, toilet and other sanitary ware, decoration: ceiling keel, plasterboard, sheetrock, a variety of glues, nails, sets of doors and sets of doors.

Question five: half package decoration, the owners need to buy what materials Changde side of the half package is the package cement sandstone, labor, cabinet board, plasterboard, paint, other than their own buy.

The things you need to buy are very much:

Tiles, flooring, overall cabinets, sanitary ware (including bathroom cabinets, toilet, squatting, shower), wires and sockets, plumbing and ancillary, finished doors, sealing balconies, lamps, cabinets, hardware, aluminum button board ceiling, hey too much. Difficult to get

Simple way: you want to decorate a list of companies to you. The general decoration company will have

Question 6: half of the decoration owners need to buy what materials See the contract attached to the bill of quantities, the decoration needs to be used but not in the list of works, that is, you need to buy.

Question 7: What materials do you need to prepare in advance for the renovation half package owners need to buy materials:

Cabinets, heating, wall tiles, floor tiles, hook and loop, floor drains, skirting, tiles, waistline, stitching card, wipes, wall paint, roller, wool brushes, flooring and skirting, door and door sucker, aluminum buckle plate, sockets, switches, toilets, basins, showers, hot water heaters, hardware, washbasin, hoods, cookers, and so on, and so on, and so on. Basin, hoods and stoves, KitchenAid, door stone, window sill stone, wallpaper, curtains, hacking, home appliances.

Question 8: What materials do the owners need to buy for the half package decoration? Putty paint flooring wall tiles wallpaper switches electrical wires network cable TV cable hinge home to build each other to buy wood paint nozzles faucets range hoods wall plumbing shower lamps more Oh Of course, sand and cement do not have to you buy, depending on how you sign the contract, but pay attention to Oh

Question 9: new home renovation, half-package, they need to buy what materials A, all-inclusive: all inclusive, all the materials purchasing and construction are responsible for the construction team.

Advantages: Relatively save time and effort to worry about, the responsibility is clearer. Once there is a quality problem in the decoration, the responsibility of the decoration company can not be shirked, because they are responsible for the materials, what problems directly find them on the line.

Disadvantages: Higher costs. Due to the price and variety of materials, decoration households know very little, once the decorative company misrepresented the price, or join hands with the material suppliers to deceive the owners, it is difficult to identify.

Suggestions:All-inclusive suitable for very busy or economic conditions of the rich, because all-inclusive is to save more money.

All-inclusive decoration considerations:

1, the strength of the decorative company: whether there is a business license registered by the Trade and Industry Bureau, the construction qualifications issued by the relevant departments of the state and design qualifications, whether there is a formal business office.

2, the company has constructed the project inspection: whether the design is reasonable, whether the construction quality meets the requirements.

3, whether there is a specialized materials department to ensure that meet the supporting supply, whether they establish a reliable relationship with the material suppliers, material quality problems can be borne by the company.

4, there is no construction management department to monitor the construction quality and progress.

Second, half-package: half-package is also known as the cleaner auxiliary materials, that is, refers to the main materials by their own purchase, such as flooring, sanitary ware, ceramic tiles, tiles, paint, cabinets, locks, hardware, etc., and some other auxiliary materials have a construction team to arrange, such as sand, nails, cement and so on. This will be a bit of hard work, but the quality of materials and budget is easy to control (a way between the clear package and half package).

Advantages: the choice of the main part of the initiative, the main building materials to buy their own, both in terms of safety and economic are more assured. Auxiliary building materials by the construction team rationing, small things also save a lot of effort.

Disadvantages: to spend a lot of time to run the building materials market, can not be easy to decorate, in the signing of the contract must be clearly stated which is provided by the decoration company, which is purchased by the owners themselves, otherwise it is easy to be in the latter part of the renovation company drilling loopholes, so that they have to buy everything, very tired and very passive.

Suggestions: half package decoration way suitable for busy but the pursuit of quality people, but the premise is also to have a certain decoration building materials expertise.

Renovation half package notes:

Half package operation is good, it will give everyone a good decoration effect, space decoration will make us satisfied. But if you do not pay attention to a series of problems in it, it may bring us unnecessary trouble. In the use of half-package decoration form, should pay attention to the following points:

1, relatives or friends of the initiative recommended by the company: relatives or friends of the initiative recommended by the decoration company is generally more reliable, but the premise is that they themselves must be more knowledgeable.

2, professional ethics: when mentioning other decoration companies, pay attention to the attitude of this decoration company, if the peers are reduced to nothing, choose carefully. If you can make a fair comment, you can consider.

3, payment: according to the process of reasonable payment and written into the contract. When each step of the work is completed, materials and workmanship standards acceptance and then pay the project. If the terms of the contract is not half of the renovation, and most of the project has been paid off, choose carefully.

Third, clear package - clear package, similar to the software installation "custom installation", is that the decoration company or construction team is only responsible for the actual construction of the decoration, and the design, selection, purchase of materials (including ceramic tiles, flooring, and other materials and sand, cement, etc.), acceptance and inspection. The company or construction team is only responsible for the actual construction of the decoration, while the design, selection, purchase of materials (including tiles, flooring and other main materials and sand, cement and other auxiliary materials), acceptance by the owners to complete.

Advantages of the package:

1, by the owners of the greatest initiative, all things are under their own supervision and control, easy to rest assured.

2, sometimes designed by the owners of the house is more personalized, in line with their habits and personality traits, especially relative to those who have their own design ideas compatriots, this can be an exciting challenge experience.

3, relative to other ways, the price is more economical, easy to control, eliminating the opportunity to be cheated.

Disadvantages of the package:

1, take this way, the owner's workload will be particularly large, to invest a lot of time and energy to run around. It is impossible to be lazy.

2, the need for owners to understand the materials, construction expertise, but also need to familiarize themselves with the market, otherwise it is easy to buy some of the poor quality and high price of the materials, and difficult to cope with the decorating company or the construction team to raise a variety of issues, in the end, but lost the initiative. So if you are decorating thinking is still stuck in the 10 years before the layman, do not consider.

Renovation all-inclusive good or half-package good, clear package this issue is best to be able to first clear the difference between decoration all-inclusive and half-package, clear package, after all, no matter which way to take, to understand the business can provide free services, maybe these services ...... >>

Question 10: Decoration half package, according to the chronological order, the owners need to buy what materials According to their own experience to list this purchase list, to give you a reference, it is not necessarily very accurate.

1, before the decoration company into the field: the owners need to contact the community service team to knock the wall and shovel wall ash (there are also decoration company package).

In fact, there is an item that needs to be considered at the very beginning of whether to buy: floor heating, the cost is higher, and will reduce the height of the home floor, not every half-package homeowners will experience, and floor heating special flooring prices are not cheap.

2, to determine the cabinets and related need to use the embedded kitchen appliances, get a rough design program, to the decoration company design reference, this is related to your kitchen plumbing alignment.

3, if your toilet needs some special sanitary ware, such as box wall row toilet, wall row sink, into the wall shower, need to do inside the wall, it is best to communicate with the designer, do a good job of the relevant design program and budget before entering the site, the toilet (squatting pit) is best to see in advance, the front row or back row, how much pit distance is needed. If there is no special requirements, you can set the toilet hardware sanitary ware later.

4, buy tiles; because many stores do not have tiles in stock, the need to transfer and cutting, can be ten days and a half months time, but water and electricity is done immediately after the tiles, so not yet started to buy tiles.

5, to determine the central air conditioning, and then installed after the completion of the decoration company wall, the central air conditioning master will explain to the project manager wiring some of the precautions.

6, after the start of work, electrician into the field: whether you need to buy strong and weak power box, inside the open and leakage report whether the owners need to buy their own, the bottom box and panel of the switch and socket, these are to see the owners of their own offer inside or not, there is no need to buy their own.

7, the end of the electrician, masonry into the field, the need for cabinet businessmen to carry out fine measurements, so generally the first kitchen tile.

8, the purchase of toilet floor drain and water block to the mason, water block can buy a little longer, masonry according to the site cutting.

9, masonry paste good tile paved threshold stone, you can ask the door of the business door to fine measurements, ordered, into the production cycle.

10, the floor can be bought later, but you have to determine what floor you buy, in the end is to do cement mortar leveling or hit the floor dragon, laminate flooring are cement mortar leveling, laminate flooring both can be, solid wood flooring are hitting the floor dragon.

11, buckle plate, bath bar, wallpaper, lamps and lanterns can be purchased later, there is a reminder, before installing the buckle plate, you need to go to the gas company to apply for the removal of pipes and open the gas, usually within a week to move the pipe, install water heaters, gas stoves and buckles and then notify the gas company by phone to open the door.

Finally, a reminder, some things, not half of the package does not contain, but your decoration company deliberately omitted, so that it looks like the overall cost is a little less. Generally common are: threshold stone, sill stone, primer for painting, water and electricity perforation, door set base.

There are also some, you if you finally installed and found that it is not used, remember to reduce the items with the decoration company, generally common: shoveling wall plaster, installing light fixtures, tile inlay.