air pollution prevention and control construction period: during the construction period, dust will have a negative impact on the air quality of the surrounding environment, and the owner will take many measures to control dust according to the requirements of the national Technical Code for Prevention and Control of Urban Dust Pollution, such as sprinkling water to suppress dust and setting fences. , in the case of taking measures, the impact of the construction dust of this project on the surrounding environment can be effectively controlled. Operation period: Air pollutants come from commercial catering fume and spare generator exhaust gas. The owner will take purification measures for commercial catering oil fume and spare generator exhaust gas, and the exhaust gas emission will meet the requirements of national and Shenzhen emission standards. After taking measures, the catering oil fume and spare generator exhaust gas will have no impact on the surrounding environment.
noise impact prevention and control construction period: the noise of construction machinery has a negative impact on the surrounding acoustic environment. In order to prevent noise disturbance, the owner will reasonably arrange the construction plan and the combination of construction machinery and equipment to avoid construction at noon and at night, and try to use low-noise equipment or equip high-noise equipment with silencers and mufflers. The noise at the construction site must meet the requirements of GB12523-91 "Noise Limits at Construction Sites". In the case of taking measures, the impact of the construction noise of this project on the surrounding environment can be effectively controlled. Operation period: Noise mainly comes from cooling tower, standby generator, garage traffic noise and commercial noise. The measures taken by the construction party to prevent and control noise mainly include selecting ultra-low noise cooling tower, setting the standby generator in the underground machine room, and it is forbidden for vehicles entering and leaving the garage to honk their horns. Commercial operators must strictly abide by the relevant provisions in the Measures for the Administration of Environmental Protection of Service Industries in Shenzhen Special Economic Zone and reasonably arrange the business hours of shopping malls. Under the condition of taking effective measures, the noise during the project operation period will not interfere with the surrounding residential life.
prevention and control of the impact of solid waste
construction period: solid waste mainly comes from the domestic waste and construction waste of construction workers. The construction party will take pollution prevention measures of fixed-point collection and timely removal of solid waste during the construction period, which can ensure that the environmental impact of solid waste can be effectively controlled.
sunshine impact
Ping An International Financial Center will become the tallest building in Shenzhen at present. According to the sunshine analysis of Ping An International Financial Center, the sunshine of Xinghe International Residential Building and other surrounding residential buildings is not covered by this project, and the sunshine situation of Xinghe International Residential Building and other residential buildings can be maintained.
light pollution
The outer wall of the tower of Ping An International Financial Center is mainly made of glass curtain wall, supplemented by decorative and functional stones. The podium is made of all stone.
as for the light pollution that may be caused by the glass curtain wall, the measures that the project owner will take are: the glass curtain wall is designed as a plane or a convex surface, without forming concave cambered surfaces or gathering points; new materials with low reflection are used, soft and neutral colors are selected, and the reflection angle is considered in the design, so as to reduce the light pollution to the surrounding residents, office buildings and roads.