Current location - Recipe Complete Network - Catering industry - Daya Bay fire engineering report construction acceptance what conditions are required
Daya Bay fire engineering report construction acceptance what conditions are required
Application for fire design review should provide the following materials

1. construction fire design review application form

2. construction unit of the industrial and commercial business license and other legal identification documents

3. new construction, expansion of the construction project planning can be proved

4. design unit qualification documents

5. fire protection design documents

5. Documents

1) fire design documents should include design specifications, professional design drawings, the main fire fighting equipment, fire fighting products and fire fighting performance requirements of components, building materials, focusing on reflecting the national engineering and construction fire safety technical standards mandatory requirements of the design content.

2) fire design documents should be prepared in accordance with the following order of row:

5.2.1: cover: project name, design unit, date

5.2.2: title page: the design unit's legal representative, the chief technical officer, the chief project manager and the name of the person in charge of each profession, and after the signature of the above personnel or authorized seal

5.2. 3: Design Document Catalog

5.2.4: Design Manual

6. Copies of ancillary fees

There are construction units to the Government Approval Center, Finance Bureau window to pay the fire facilities ancillary fees to receive receipts, with the receipt to the Finance Bureau to receive a formal invoice.

Construction

1. construction unit to organize the construction unit technicians for drawing review, design institute for the design brief

2. the professional construction, construction data to follow up on the completion of the installation of the project, the system debugging

3. the completion of the project, the acceptance of A party

4. the construction data of all professional archives

5. the professional preparation of construction drawings

5. the construction of the project, the construction of the construction of the project, the construction of the construction of the project, the construction of the project and the construction of the project. . The professional preparation of construction drawings

Transfer of completion

After the completion of the project, the construction unit, the use of units, the construction unit on-site inventory of installed equipment, after the inventory is correct, the three parties in the transfer of the single signature and seal

Professional testing unit testing

1. Detection of the contents of the test includes fire protection facilities testing and electrical testing by the construction unit testing costs

2.

2. failed to rectify the test, rectified and qualified to issue a qualified report

Declaration of fire acceptance should be provided with the following materials

1. construction unit fire acceptance declaration form

2. project completion and acceptance report (provided to the completion of the Construction Commission: a full set of archives)

3. fire product quality certification

4. fire performance of building components, building materials, interior decoration materials in line with national standards or industry standards, factory certificates (the above materials tested by professional departments, the cost of sending inspection materials related to the unit to pay)

5. fire protection facilities. Electrical fire safety technology testing documents

6. construction, supervision, testing units of legal identification documents

7. fire public **** liability insurance (People's Insurance, public gathering places)

8. copies of fire facilities supporting costs

9. copies of fire audit opinion

10. inspection records

11. as-built drawings (with as-built stamp)

12. copy of ID card of the construction unit, power of attorney, and copy of ID card of the delegator