In the real society, in many cases, we need to use the letter of commitment, which has certain norms in writing. You have no idea when you write a letter of commitment? The following are 11 construction commitments I collected for you, for reference only, hoping to help you. 1
I am willing to be the person in charge of fire prevention during the renovation, and I will strictly do the following:
1. I will be responsible for publicizing and educating all personnel entering the site on fire prevention safety and site management system, so that the construction personnel can improve their safety awareness and consciously abide by relevant safety operation rules and systems;
2. In the process of decoration construction, all personnel are strictly required to abide by the relevant provisions of fire control laws and regulations to ensure construction safety;
3. Take effective safety precautions to avoid fire. At least two fire extinguishers shall be equipped at the construction site and placed in obvious and easy-to-take positions;
4. Don't use a lot of flammable materials in the construction (flammable materials must be treated with fire prevention), pay attention to the reasonable stacking of decoration materials, and remove the decoration garbage in time to ensure the smooth exit and evacuation passage;
5. The electricity for construction shall be equipped with a special switch box for construction. The switch box shall be equipped with a leakage protector, and the power supply of the switch box shall be made of rubber cable. During the decoration, the electricity shall be used in accordance with the operation procedures to ensure safe electricity use.
6. Protect the original fire-fighting facilities in the residential area. No accidents will happen. It is forbidden to use fire-fighting equipment. If it is necessary to transform the fire-fighting facilities of decorated households, it must be approved by the relevant departments of the municipal government before construction;
7, if you need to open fire operation, must be approved by the management office before operation. When working, equip enough fire extinguishers nearby and stay away from inflammable and explosive materials and articles;
8. Do not use electric heating facilities such as electric furnaces and electric rods in the construction site, and do not use high wattage lighting lamps. Gas is strictly prohibited;
9. iodine tungsten lamp, electric welding machine, etc. shall be used only after being approved by the management office;
11. Do not change the gas pipeline, power supply and intelligent lines without authorization;
11. Smoking is prohibited on the construction site. If there are smokers, handle them according to the seriousness;
12. In case of a fire accident due to violation of the above regulations, the construction unit and individual who caused the accident and the owner/user who hired the construction shall bear all economic and legal responsibilities according to the regulations.
Decoration construction unit: Tel:
Person in charge of fire prevention: ID number:
Letter of Commitment for Construction on October 21th 2
Vanke * * * * * Management Office:
I am an employee of Vanke * * * * * construction unit _ _ _ _ _ _ _ _ _. Now it is necessary to carry out home maintenance for Room _ _ _ _ _ _ _ _ _ of Building _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. You need to use the key and the handle, and the use time is:.
in order to ensure the owner's indoor facilities and environment are intact during the maintenance process, I make the following commitments to your office on behalf of our company:
1. Our employees will strictly abide by the national regulations and relevant management regulations of your office when maintaining in your jurisdiction.
second, in the process of maintenance, never intentionally damage the various facilities of the owner's house.
3. If it is necessary to change all kinds of equipment, facilities, devices, decoration surfaces and buildings of the house or carry out other destructive maintenance during the maintenance operation, it is necessary to inform the management office in advance and obtain permission from relevant departments before construction.
iv. after the maintenance operation, immediately clean the maintenance site, and do not leave any articles and garbage indoors.
5. After the house maintenance is completed, the key administrator must be notified for acceptance. After verification, the key administrator will lock the house.
the above promises that our employees will do it resolutely, and if there is anything missing, it will be implemented in strict accordance with your Penalty Clause for Borrowing Keys for Home Maintenance.
Undertaker:
Person in charge of relevant real estate departments:
ID number:
Tel:
Letter of Commitment for Construction on
Year, Month, Day
XX-XXX Company:
Our company undertakes the railway project that your company is responsible for. It is now promised that after receiving the construction funds allocated by the construction unit, it will be given priority to pay the wages of migrant workers in strict accordance with the relevant requirements of the Ministry of Railways Tiecaidian (21xx) No.17 telegram, so as to ensure that the wages of migrant workers are paid in time and in full. My unit promises that the wages owed to migrant workers in the early stage have been paid off in full, and no new arrears will occur between now and the Spring Festival next year.
if this commitment is not implemented, I am willing to accept the construction-related assessment and bear all responsibilities and consequences arising therefrom.
commitment unit: (official seal)
person in charge of the commitment unit (commander and general manager):
21xx month day construction commitment article 4
Ministry:
There are employees here who are the project managers of this project. In order to ensure that the project can be completed safely, with high quality and high efficiency, the following commitments are made to the project department: < p
2) review the important documents related to safety, health and environmental protection of superiors and organize their implementation, and coordinate and solve the problems in the implementation in time.
3) examine and approve the safety work objectives and plans of the project department. Preside over the regular meeting of safety work of the project department and study and solve the problems existing in safety work in time.
4) ensure the extraction and use of funds for safety technical measures, and ensure that the site has perfect conditions for safe and civilized construction.
5) ensure the establishment and use of the safety bonus of the project department, and ensure the implementation of the safety reward and punishment measures of the project department.
6) Ensure that there are safety and civilized construction requirements and reward and punishment measures in the contract, and strictly follow the contract.
7) organize and participate in the safety inspection of the project department, and organize the implementation of rectification measures.
8) organize and preside over the investigation and handling of personal injury accidents according to the principle of "four no-misses", and participate in the investigation and handling of personal death accidents, major construction machinery and equipment and fire accidents.
9) lead and coordinate the management of safe and civilized construction by various functional departments, and arrange and arrange safe and civilized construction work at the production dispatching meeting of the project department.
11) urge the planning department to issue the safety technical measures plan together with the construction plan at the same time, and make equal assessment to ensure that the site has perfect safety and civilized construction conditions.
11) Be responsible for organizing the inspection, implementation and visa confirmation of the safe and civilized construction conditions before the commencement of major dangerous construction projects. For major dangerous construction projects, the construction should be supervised in person.
12) be responsible for organizing the education of safety, health and environmental protection.
13) Organize the analysis of the causes of frequent accidents and urge the implementation of preventive measures.
14) be responsible for organizing the implementation and coordinating the safe and civilized construction management of labor subcontractors. Before signing a meeting with the labor subcontracting unit, the construction qualification and safety qualification must be reviewed.
15) Be responsible for organizing the implementation of the management measures linking safety work with economy.
16) Participate in the investigation and handling of personal injuries, fatal accidents and major construction machinery and equipment and fire accidents, and be responsible for organizing the implementation of preventive measures.
I am willing to make a commitment to the above terms. If there is any violation of the commitment, I will be assessed according to the management regulations of the project department.
Undertaker (signature):
Date: Year Month Day Construction Commitment Chapter 5
1. Ensure that the construction is carried out according to the construction time, road occupation scope, traffic maintenance facilities and full-time maintenance personnel approved by the traffic control department.
2. Ensure the safety and effectiveness of temporary facilities such as guide roads, steel plate bridges, temporary piers and cast-in-place bent frames.
third, ensure that all facilities required for the emergency plan can be put in place in time according to the plan.
fourth, ensure that flood control equipment is arranged during summer construction to prevent road surface collapse; During winter construction, arrange anti-overflow facilities and anti-freezing measures to prevent traffic accidents caused by road freezing.
5. Ensure that the personnel on duty are on duty 24 hours a day during the construction period.
Attachment: 1. List of traffic maintenance facilities
2. Duty list of the person in charge of construction site safety
Legal person of the construction unit (signature): seal of the construction unit:
List of traffic maintenance facilities
Project name: ventilation of the old building-construction unit of the medium-pressure natural gas project of shibalidian Township Government in Chaoyang District. Division
Employer: Engineering Consulting Branch of Beijing Gas Group Co., Ltd.
Duty List of Safety Supervisor at Construction Site
Project Name: Ventilation of Old Building —— Medium-pressure Natural Gas Project of shibalidian Township Government in Chaoyang District. Employer: Beijing Zhongxuan Municipal Engineering Co., Ltd.
Employer: Engineering Consulting Branch of Beijing Gas Group Co., Ltd. Letter of Commitment on Construction 6
To: (tenderee)
We have carefully read and are familiar with all the contents of the project tender, and agree to form a contractual relationship with the tenderee according to the contents of this tender and relevant legal forms. We are willing to accept all the contents of this tender document, agree that this document as an annex to the contract has the same effect as the contract text, and promise that all the information provided is true, legal and effective, and we are willing to bear all the responsibilities if it is untrue.
once winning the bid, we will sign a contract with the project legal person in accordance with the specific provisions of the bidding documents, and strictly fulfill the contractual obligations, deliver the goods on time, and provide high-quality materials and services for the project. in order to clarify our attitude, determination and confidence in bidding for the slope of the 1.3 million tons/year circular economy briquette coking expansion project and its affiliated greening construction project of Guizhou Guitianneng Coking Co., Ltd., We solemnly promise as follows:
1. Quality commitment
We solemnly promise that the quality of this project will meet the requirements of the tender documents and the survival rate will be 111% (including the survival rate). If there are quality problems due to our reasons during the construction, we are willing to unconditionally bear all the losses caused to the owner.
II. Time limit and progress commitment
We completely obey the arrangement of the owner, and meet the progress requirements of the owner on the basis of ensuring the survival rate of 111% (including survival) to ensure the completion on schedule.
III. Commitment to Safe and Civilized Construction
We will obey the management of the owner and the supervision unit, abide by the management system of the owner's safe and civilized construction, strengthen the management of safe and civilized construction, ensure the safety of the construction personnel and equipment, and ensure that there will be no casualties, meet the requirements of the owner, and bear all legal responsibilities arising therefrom.
iv. if problems with materials and construction quality are found during the execution of the contract, we will replace them as soon as possible and bear corresponding economic responsibilities.
Signature and seal of the bidder's representative: Letter of Commitment for Construction 7
Traffic Patrol Police Detachment of the Northern New District Branch of Chongqing Public Security Bureau:
For the Chongqing project undertaken by our company, our company made the following commitments during the occupation of roads:
1. Conduct road traffic organization in the construction area in strict accordance with the Code for Traffic Organization in Urban Road Construction (GAT911-21xx) to ensure traffic safety.
second, strictly control the occupied area and construction period according to the regulations on the premise of ensuring safety and smoothness.
Third, accurately design and construct the safety protection distance to be reserved for deep excavation.
iv. Traffic instructions, warning signs and safety protection measures established in strict accordance with the Law of the People's Republic of China on Road Traffic Safety, the Regulations for the Implementation of the Law of the People's Republic of China on Road Traffic Safety, the Regulations of Chongqing Municipality on Road Traffic Safety, and the Code of Traffic Organization for Urban Road Construction;
5. Obey the guidance and supervision of the multi-traffic organization and management of the traffic patrol brigade in the jurisdiction, receive regular inspections and fill in the construction checklist.
VI. Our company undertakes all legal responsibilities such as traffic accidents caused by inadequate safety measures during the occupation of roads.
we hereby promise.
Commitment unit (seal):
Year Month Day
Signature of project leader: Tel:
Signature of person in charge of construction site: Tel: Letter of Commitment for Construction 8
Party A: wugang city Local Road Management Office (hereinafter referred to as Party A)
Party B: Henan Huiji Energy Co., Ltd. (hereinafter referred to as Party B).
The Pingwuluo local branch line project of the Second West-East Gas Transmission Line, which our company is responsible for, is a natural gas pipeline burying project in wugang city. This project crosses a number of rural roads. After Party B applies to Party A and both parties negotiate, Party B promises as follows:
1. During the construction, Party B shall not affect the safety and smoothness of roads due to the construction.
2. after the construction, party b must restore the road to the original state according to the technical standards stipulated by the state.
3. during the construction, party b shall set up obvious construction signs and corresponding marks on the construction site.
4. in case of all safety accidents caused by party b's construction during the construction, party b shall bear all its responsibilities and has nothing to do with party a ..
5. In case of major inspection tasks during construction, Party B must obey the arrangement of Party A..
6. during the construction process, party b should fully consider the possibility of upgrading the road it crosses. when crossing the road, the underground excavation of the pipeline should be at least 2 meters away from the road surface, and corresponding measures should be taken. if the pipeline buried by party b cannot meet the construction requirements of party a when upgrading the road of party a, party b should unconditionally shift the gas pipeline or take other corresponding measures, which must meet the construction requirements of party a.
7. if party b causes damage to road ancillary facilities during the construction,
it must be restored to the original state according to the technical standards stipulated by the state, or compensate party a according to the standards.
the above commitments are reached through negotiation between party a and party b, and come into effect after being signed and sealed by the legal representatives of both parties. After the commitment comes into effect, Party A and Party B shall not change the content of the commitment at will. If there are special circumstances that really need to be rectified, it shall be changed by mutual agreement. This commitment letter is made in triplicate, one for each party and one for the wugang city Municipal Transportation Administration.
signature of party a's legal representative:
signature of party b's legal representative:
stamp and seal
letter of commitment for construction on, 9
Wuhan * * District Bureau of Landscape Architecture:
The construction commitment is now written on the temporary occupation of green land by the project.
during the construction period, it is not allowed to expand the occupied area and extend the occupied time without authorization; Site engineering waste, muck and domestic waste shall be classified and piled up in a centralized way within the enclosure, and timely.