How to write the application report about equipment acceptance? The following is the equipment acceptance application report compiled by the application network, hoping to help you.
Application Report for Equipment Acceptance (I) xx Fire Brigade:
The fire-fighting facilities and equipment of xxx project developed by our unit have been designed and submitted for construction. Please accept them.
Xxxx unit
Date, year and month
Application Report for Equipment Acceptance (II) Since the project started, with the strong support of superior leaders, quality supervision stations, construction units, design units, supervision units and relevant departments, the project passed the five-party pre-acceptance work on 20xx65438+February 2 1 day, and completed the' quality rectification and closure' of related issues. Now the fire fighting project has been closed.
I. Overview of the Project:
1, * * * * * * and Guangchang Road are adjacent to Guangchang Road in the south, Peng Fei Lane in the north, Xinhe Street in the west and residential areas in the east. Belonging to residential areas, it is a key unit of fire control. The building of this project consists of a basement, eighteen to twenty-two floors above ground and two independent annex buildings. The total building area is 40 192m2, and the underground part is 5252.34m2 The total building heights are 64.3m, 70.30m, 80.90m and 9.30m respectively. The first floor is 4.50m high, the second floor is 4.80m high and the third floor is 4.50m high. The height of the first basement is: 5.60m for the motor vehicle garage, 4.80m for the equipment room, and 3.80m for the non-motor vehicle garage ... The underground room mainly has two fire exits, a fire-fighting pool with a design capacity of 400m3, a special shower pool with a design capacity of 18m3, a fire-fighting smoke exhaust fan room, a self-contained power generation room and other equipment rooms. There are two fire stairs on the second and third floors of the mall. The roof is equipped with elevator machine room, positive pressure blower room and fire pool, with a design capacity of 18m3.
2. Building category and fire resistance rating: Class I high-rise buildings and basements have a fire resistance rating of Class I, while the commercial department on the north side is divided into Class II multi-storey buildings with a fire resistance rating of Class II.
3. The main structure adopts fully cast-in-place reinforced concrete frame? Frame-supported shear wall structure, basement connected, basement with garage, non-motor vehicle garage. Public places such as shopping malls and office areas are set on the first and second floors, the third floor is set as an overhead floor (technical floor), and the outdoor part is set as a leisure place such as a roof garden; Four floors and above are residential.
Second, the engineering function:
1. The fire alarm system of this project adopts the control system of fire control center, which consists of automatic alarm system, floor evacuation indication system, fire hydrant system, automatic sprinkler system, fire smoke exhaust system, positive pressure air supply system, fire broadcast and fire telephone system. The fire control center is located on the first floor of Building D-/KLOC-0, and is controlled by the centralized alarm controller.
2. The linkage system of this project is centralized control, and the linkage console is located in the fire control center on the first floor. The linkage function mainly includes: after the fire alarm, stop the smoke exhaust fan, open the smoke exhaust port and positive pressure air supply port, start the smoke exhaust fan and positive pressure blower, turn on the alarm device after confirming the fire, turn on the emergency broadcast after 10~ 15 seconds, organize evacuation, and start the fire pump and spray pump at the same time, and the elevator will be forced to land on the ground floor.
3. Linkage logic and manual function of fire control room: a. Manual button action, fire control equipment will be linked immediately. B, fire hydrant button action, immediately start the fire pump and spray pump. C, smoke, temperature, water flow indicator alarm, should confirm the rear can linkage fire fighting equipment. D, fire emergency broadcast horn, smoke exhaust and air conditioning should be connected to the fire floor and the upper and lower floors. E, the fire control room should be inspired by the start and stop of all fire fighting equipment, and can manually control the start and stop of all fire fighting equipment. The fire broadcast in the fire control room should be turned on manually or automatically, and equipped with microphone and recording tape. G, the fire center should be equipped with a dedicated telephone that can directly connect to the fire brigade, and the fire pump room, elevator room and fan room should be equipped with fire telephones.
Third, the project construction process:
Our company has established the quality responsibility system for managers of all departments and levels, defined their respective quality responsibilities, and established a perfect project self-inspection system, with clear division of labor and responsibility to people. Strictly control the construction procedure of the whole project. Before each subdivisional work starts, strict technical disclosure shall be carried out, and inspection and acceptance shall be carried out according to the requirements of technical disclosure and inspection and evaluation standards, so as to track and synchronize. After the self-inspection of each technical review project is qualified, it shall be submitted to the quality supervision station, the construction unit and the supervision unit for parallel acceptance. After meeting the design requirements and acceptance specifications, the next working procedure shall be constructed. All materials used on the site are required to be qualified, and unqualified and disorderly products are rejected (see the attached table 1 for the main manufacturers and purchase quantities of fire-fighting materials).
During the construction process, through the unremitting efforts of our company and the project department and the hard work of all employees, our construction party completed all the work according to the design requirements, the provisions of the acceptance specification and the construction contents agreed in the contract. All equipment has been debugged and operated normally, and all alarm systems have passed the inspection of the inspection company.
Fourth, the remaining problems in the construction:
1. Because the investment time of this project is relatively early, the construction is carried out according to the original design code, which has some shortcomings compared with the requirements of the current fire acceptance code.
2. Because the power supply bureau is responsible for the equipment installation of the distribution room, it has not been completely completed. At present, the power supply used by each equipment is temporary on site, and the load cannot run for too long at the same time.
3. Due to objective factors such as tight construction time, there are some minor problems in the process of functional debugging of each system.
I am here to convey
Salute!
Applicant:
20 years * * month * * day.
Application Report for Equipment Acceptance (III) I. Project Completion:
Building xx Home 1 and Building 2# in xx County were started by the Eleventh Project Department of xx County Housing and Construction Company in XX 165438+ 10/5, and were fully completed at the end of March in XX, lasting 16 months. The main project has been completed according to the approved design scheme, that is, civil decoration and decoration projects; Water supply and drainage works; Electrical equipment installation project.
Second, the acceptance conditions inspection results:
According to the relevant national regulations, the project has completed the main construction tasks according to the design requirements. The investment in the project is reasonable, the completion materials are fully prepared, the construction quality of the project passes the quality inspection of the quality supervision station, and the project quality inspection and evaluation report is issued. The project quality is qualified and has formal acceptance conditions.
Three. Suggested acceptance time, place and participating units:
According to the completion of the project and the requirements of the relevant departments of provinces and cities, it is suggested that the project completion acceptance of building xx 1 and 2# should be carried out on, and the acceptance place should be in, and the participating units include the project legal person, design, supervision, construction, quality supervision and other related units.
To sum up, the project of xx Home 1 and 2# Building in xx County has met the completion acceptance conditions, so please arrange formal acceptance by the superior department.
I am here to convey
Salute!
Applicant:
20 years * * month * * day.
;