Specific requirements:
One, the town government, street offices, combined with the District Emergency Office Beijing Xingzhengban [2007] No. 12 document, urging the jurisdiction of commercial retail, catering enterprises to do a good job of revising the emergency plan.
Second, the construction area in the ground 1000 square meters (underground 500 square meters) above the commercial retail enterprises and the construction area of more than 500 square meters of catering enterprises, compared with the Daxing District Bureau of Commerce production safety plan model, combined with the actual situation of the unit to be revised. And before December 10, the electronic version of the text and hard copy of the text together to the Daxing District Business Bureau Safety Section.
Contact: 69226836
Contact: Li Mantao
Email: dxswanquan@126. com
Attachment: Model Copy
Beijing Daxing District Bureau of Commerce
December 3, 2007
Emergency Response Plan for Production Safety Accidents
Enterprise Name:
Business Address:
Enterprise Legal Person:
Safety Section Chief:
Contact Tel:
Revision Date:
XX Emergency Response Plan for Production Safety Accidents
One, the basis for the compilation and the purpose of the preparation of the plan
Based on the "Chinese People's Republic of China*** and the State of Work Safety Act", "Chinese People's Republic of China Fire Protection Act", "Chinese People's Republic of China" and "Chinese People's Republic of China Fire Protection Act". Fire Safety Law of the People's Republic of China", "Beijing Municipal Regulations on Work Safety" and other relevant laws and regulations, in order to strengthen the work safety management of our organization, prevent and eliminate all kinds of production safety accidents, safeguard the safety of citizens' lives and the safety of enterprises' properties, and maintain the stability and harmony of the society, in accordance with the relevant laws, regulations and requirements of the state, the local government and the relevant departments, and in the spirit of The principle of "production safety, prevention first", combined with the actual situation of the enterprise, has formulated this plan.
Two, dangerous accident analysis
The existence and occurrence of safety accidents in this industry are: fire, electricity, special equipment, terror, explosion, gas leakage, hazardous chemical leakage, poisoning, coaxing, congestion, flood control, lightning, suffocation and so on.
Three, business profile
Unit in (address), is a large and medium-sized commercial retail (catering) enterprises with a floor area of square meters, more than one employee.
Four, the emergency organization and responsibilities
1, the emergency command
Chief Commander: general manager of the mall (legal representative or shift chief). (Name)
Deputy commander-in-chief: the mall's deputy general manager in charge of security and security department minister. (Name)
Group members: the main person in charge of each department and security department staff. (Name)
General Command: located in the monitoring room.
Responsibilities: fully responsible for organizing, directing and coordinating the specific implementation of rescue and emergency evacuation plans to ensure that rescue and emergency evacuation operations can be carried out smoothly in accordance with the plan.
2, communication and liaison group
Person in charge:
Composition: shopping mall office, TV monitoring and fire control room personnel.
Responsibilities: to alarm in time, to maintain smooth communication; to ensure that a variety of instructions, information can be quickly and accurately conveyed in a timely manner.
3, floor commandPerson in charge:
Personnel composition: the main person in charge of each floor of the mall and its office staff.
Responsibilities: responsible for the floor organization, command, coordination of rescue, emergency evacuation plan for the specific implementation; grasp the situation, accurately analyze the incident, decisively make the right judgment; timely reporting of relevant information and conscientiously carry out the command command.
4, rescue action groupPerson in charge:
Personnel composition: the obligation of each department and rescue team members.
Responsibilities: responsible for timely rescue of the initial accident in accordance with the plan or on-site commander's instructions to control and eliminate the accident; with the professionals to rescue rescue work.
5, evacuation guidance group
Person in charge:
Composition: security department personnel and the relevant personnel on each floor.
Responsibilities: under the command of the floor command group, hold their positions, according to the plan measures and evacuation routes; orderly evacuation of the floor to guide the customers, evacuation is completed in an orderly manner.
6, protection and rescue groupPerson in charge:
Personnel composition: by the security department personnel, shopping mall medical office personnel and each floor after medical training personnel.
Responsibilities: responsible for cooperating with the professional and medical personnel rescue, rescue the injured and materials; responsible for the scene alert, maintain site order, guard the rescued materials, to ensure that the firefighting work goes smoothly.
7, logistics support group
Person in charge:
Composition: security department personnel, logistics department personnel (power supply, water supply, maintenance), equipment department personnel and the command designated personnel.
Responsibilities: responsible for ensuring the supply of water for fire-fighting and the supply of other fire-fighting materials and facilities; responsible for fire-fighting after the water, electricity, on-site repair, restoration and other work.
V. Emergency Response
1, alarm and policeThe duty officer or on-site staff found that the accident, should immediately take emergency measures, call for help, and timely alarm. After receiving the alarm, the monitoring room will immediately notify the volunteer rescue team members to rush to the scene through walkie-talkie, and notify the person in charge of the enterprise at the same time. The person in charge of the enterprise decides to start the emergency plan according to the accident situation, and firstly calls the police to the public security and firefighting departments and other professional departments, and reports to the local government, the supervisor and the relevant departments. Alarm should be clear about the detailed address of the accident enterprise, details, accident parts, alarm name and phone, walking route, and send someone to the agreed location to receive the police car into the accident scene.
2, emergency evacuationMonitoring room received the alarm, immediately turn on the emergency broadcast, explain the accident site, evacuation route. Evacuation team members immediately organized in the accident layer and other floors threatened by the accident along the safe direction, to the evacuation aisle, the safe exit parts of the orderly evacuation.
3, control the initial stage of the accident
Salvage action group received the alarm, should immediately go to the scene of the accident, according to the plan or on-site commander's instructions to quickly check whether to cut off the power supply at the scene, the use of salvage equipment to quickly rescue. If the accident is large, temporarily difficult to rescue, should be immediately based on the scene to take timely measures such as isolation and protection to prevent further expansion of the accident. Actively cooperate with professionals to complete the fire-fighting task.
4, communication and liaison, safety protection and rescue
Communication and liaison group should be immediately in accordance with the plan or the commander's instructions, timely notification of the relevant personnel, and pay attention to keep communication open, timely and accurate will be a variety of instructions, the situation and information uploaded and downloaded.
Protection and rescue team should be immediately in accordance with the plan or the commander's instructions, the scene of the implementation of vigilance, to ensure unimpeded access to vehicles, maintain order at the scene, to prevent unrelated personnel from entering the scene, with good professional and medical personnel to rescue the trapped in the fire scene of the injured and the important materials.
Logistical support group should immediately in accordance with the plan or command instructions, quickly mobilize the rescue of materials and equipment needed for the completion of the rescue, evacuation and rescue to provide the necessary support and protection.
5, the end of the emergency
After the end of the rescue work, the General Command should be sent to the scene of the accident to implement alert protection, strictly prohibit unrelated personnel from entering the scene, to ensure that the scene of the original state, and with the investigators to do a good job of investigating the scene of the accident, the logistical support group in the arrangements for the commander-in-chief to do a good job in the repair and restoration work.
6, work requirements
(1) all departments and all employees should be under the unified leadership of the General Command, quickly in accordance with the plan or the commander's instructions, to complete the tasks.
(2) After receiving the alarm, the duty officer of each department shall immediately organize forces to rush to the scene to fight and save, grasp the situation, and at the same time report to the unit leader.
(3) All departments and all employees should be in line with the calm in the event of a calm, mutual coordination, full cooperation, the principle of not panicking, as soon as possible to complete the alarm, rescue, evacuation of customers, rescue of the injured, protection of the scene and other work.
(4) After the rescue work, the general commanding department issued the order to evacuate the scene of each group, and then enter the aftermath of the work processing stage.