Check content
Daily maintenance
1. Some equipment is sampled and tested as planned every month, resulting in all equipment being tested once a year. Ensure the normal operation of the equipment.
2, every quarter or half a year (depending on the size of the fire engineering) to conduct a comprehensive inspection, found that the problem handled in time.
3. Cooperate with the company's professional fire detection team to conduct detailed fire detection every year, including fire facilities detection and fire electrical performance detection. Issue a formal test report and report it to the fire department for the record.
4, professional detector cleaning factory, every other year to complete the cleaning of all detectors.
5. Assist or be fully responsible for the business with the fire department to ensure that the normal operation of other work will not be delayed due to fire problems.
6. According to the size of the fire engineering, the company can assign special personnel to work permanently to help deal with daily problems.
debugging
1. The company promises that general problems will be solved on site within 24 hours, and serious or urgent problems will be solved on site in the shortest time.
2. Maintain close cooperation with Party A with honest service attitude, pay attention to mutual communication and solve problems through consultation.
In order to ensure the normal operation of the fire-fighting facilities in the building and ensure the personal and property safety of the building, relying on the existing high-tech networking platform, we now propose the maintenance and maintenance service scheme of the fire-fighting facilities in the building as follows:
A, fire facilities maintenance scope
The maintenance and repair scope of automatic fire alarm system includes:
1, automatic fire alarm system
2. Automatic sprinkler system;
3. Gas fire extinguishing system;
4. Fire hydrant system;
5, fire linkage equipment maintenance is responsible for the interface of fire linkage equipment;
6, fire alarm circuit, fire linkage circuit, fire linkage power supply circuit, pipeline problems including short circuit, open circuit.
Our company will repair the faults within the scope of maintenance free of charge (such as human short circuit, open circuit, equipment damage and other faults are not within the scope of maintenance); If the equipment is damaged due to aging and cannot be repaired, your company is responsible for purchasing new equipment and our company is responsible for installing it.
In the process of system inspection and maintenance, your company should provide necessary working environment and personnel cooperation, otherwise, in case of unforeseen losses, our company has the right to refuse compensation and provide the above services.
Second, the service scope of each subsystem in the fire protection system
1, automatic fire alarm system
(1) Check and test the fire alarm system regularly.
A. test the function of the fire alarm controller.
B use special testing instrument to test the action of the detector, and confirm the light display by stages and batches.
C 1-2 standby power supply charging and discharging test and 1-3 automatic switching test shall be conducted every year.
(2) Regularly inspect and test the linkage equipment of the fire fighting system.
A. Conduct fire linkage test twice a year for control equipment such as smoke control equipment and fire shutter doors.
B. Conduct fire linkage test for fire accident broadcast twice a year.
C. Conduct the first floor elevator fire linkage test twice a year.
D. Conduct intercom call test for the fire communication equipment in the fire control room twice a year.
E. Conduct the fire linkage test of forcibly cutting off the non-fire power supply twice a year.
(3) Repair the faults of the control circuit and linkage circuit of the automatic fire alarm system.
(4) Repair the fault of automatic fire alarm system.
(5) Inspection and maintenance of fire communication line, power supply of fire main engine and grounding wire of fire main engine of automatic fire alarm system.
2. Fire hydrant system
(1) Conduct fire pump start-up operation test every month, and conduct fire pump hydrant button linkage start-up test.
(2) Check all control valves on the system every month to ensure that the control valves are in normal working condition.
(3) Check the fire hydrant every month, and handle the problems in time when found.
(4) Conduct static pressure test on the most unfavorable hydrant every quarter.
(5) Check the water gun, hose and other equipment in the indoor fire hydrant box every six months, and notify the user in time when problems are found.
(6) Check the interface and accessories of the water pump adapter every year.
(7) Check the outlet of fire hydrants every year, and check the outlet of fire hydrants in key parts every year.
3, automatic sprinkler system
(1) Check the water source control valve and alarm valve group every month to ensure that all valves in the system are running.
Build a country.
(2) Start the spray pump once a month.
(3) Start the solenoid valve once a month, and notify your company to replace it in time if any abnormality is found.
(4) Check the appearance of the nozzle every month, replace it in time if any abnormality is found, and remove any foreign matter on the nozzle in time.