Current location - Recipe Complete Network - Catering training - What is the dome of Taiwan Province Province? Very good?
What is the dome of Taiwan Province Province? Very good?
The Dome is located in the fourth section of Nanjing East Road and Dunhua North Road in Taipei City, Taiwan Province Province. It is a multi-functional gymnasium with a seating capacity of about10.5 million, a construction area of 20,000 square meters and a construction area of 88.41square meter, with a total construction capital of 4.510.6 billion yuan. At the end of 2000, the Taipei Municipal Government demolished the old baseball stadium and built a15,000-seat multi-functional gymnasium on the original site. Construction started in June165438+1October 12 and was completed at the end of August 2005. On February 1 day of the same year, it was officially opened and named "Taipei Arena". Architectural features The night view of Taipei Dome is an important indoor venue facility in the overall planning and construction plan of sports facilities in Taipei. The stadium area of the main stadium is 80m× 40m (3200m2), and when the retractable seats are fully deployed, it still reaches 60m× 30m (1800m2). There are various administrative spaces around the venue to meet the requirements of sports below the size of a five-a-side football field. In addition, the center of the main stadium can be frozen at 6 1M×30M to become a standard indoor ice competition venue, enabling Taipei to compete for the first-class events of most international individual sports associations. Multifunctional Features The multifunctional design of Taipei Dome can not only provide the best design for ornamental competitive sports activities, but also effectively support the use of performing arts and concerts. Asymmetric ceiling can reduce the sound diffraction of indoor venues in large space, improve the reverberation problem in space and improve the broadcast quality; A high-altitude walking platform, a central stage and a large hanger are arranged above the remote stage to reduce the lighting arrangement cost of performance activities; The museum also provides a wide range of interfaces for the night facilities and equipment of the performance dome, so that the activity units can add relevant equipment by themselves to achieve perfect lighting and sound effects. The moving line of the audience can be completely separated from the moving line of the performers (or players) and the staff of the work unit, and there are dressing rooms and practice rooms with different sizes and capacities. Large loading and unloading trucks, tool trucks and cranes must drive directly into the main stadium. The design of the stadium shortens the operation time of site layout and restoration. Taipei Dome is a HRC building with two floors underground and five floors above ground, with a total construction area of about 88,000 square meters. The audience seating area can be quickly changed according to different purposes: the center stage concert and basketball match can accommodate 15350 seats; Remote stage concerts and large gatherings can accommodate 13500 seats; The near-end stage concert and performing arts can accommodate about 65,438+00,000 seats. (All the above include 695 seats in the balcony area) Taipei Little Dome Branch is an international standard skating rink with an area of 6 1M×30M. Equipped with equipment and facilities related to ice hockey and speed skating, it can hold standard indoor ice sports. It is open to the public on weekdays (paradise on ice) for ordinary citizens to participate in skating and provide various education and training courses. The stands of the skating rink can accommodate 800 seats. In addition, the Taipei Dome Hall has more than 6,000 square meters of affiliated commercial facilities, which provides a comfortable dining space and leisure environment for the audience. In addition, in cooperation with the underground project of the former Taiwan Electric Power Company's substation facilities, the outdoor square facilities facing north will be built to connect the commercial activities in the surrounding street areas. Little Dome Gym Location Little Dome is located at the intersection of Nanjing East Road and Dunhua North Road in Beicheng. It took about four years and cost more than 4.76 billion yuan to build by the New Construction Department of the Municipal Engineering Bureau. During the construction period, it was affected by the shortage of building materials and soaring material prices, but fortunately, they were overcome one by one. When celebrities hosted the cadres of the International Ice Hockey Federation and the Asian Ice Hockey Federation to come to Taiwan, they confirmed that the small dome was the first skating rink in Taiwan Province Province that met international standards. In 2005, the Works Bureau held a completion ceremony in the main building of Little Dome to show the public the construction achievements of Little Dome. At that time, Mayor Ma Ying issued a certificate thanking the design and construction team for their hard work. In the completion ceremony, Ma Ying IX presided over the hockey "shooting", the city councilor Dai Xiqin and the home affairs director Eric and his family skated around the field for a week, and the Taiwan provincial ice hockey team held an exhibition match with the foreign friends team to announce the opening of the dome. The scene was full of joy. Ma Ying IX pointed out that the little dome has15,000 seats, of which 5,000 can be loaded and unloaded according to the needs of the site. Sports, culture, business, religion and political activities can all use this indoor large-scale activity space, without worrying about the influence of the weather, and will not disturb nearby residents because of its oversized size. Ma Ying IX said that the construction of "Little Dome" will promote sports development and urban renewal, and make Beishi the window of Taiwan Province Province. The municipal government will also hold a naming event for "Little Dome". Ma Ying IX plans to take office in Little Dome, with two floors underground and five floors above ground. The main hall 15000 seats and the skating branch 800 seats. Base area: 5986 flat building construction area: 27506 flat main hall (remote stage, concert and other general forms): 1 1 10,000 people. Address: No.2, Section 4, Nanjing East Road, Songshan District, Taipei Business Unit: No.48, Taipei MRT Company. The capacity of each affiliated commercial facility 14- 15 people is about 2,300 square meters, including the food court (now closed) and the restaurant fitness center. The vitality workshop was entrusted to operate the main and auxiliary venues, and 476 parking spaces (second floor underground) were entrusted to operate the Taipei Dome by ZTE DuDu Room, formerly known as Taipei Baseball Field, which was demolished and rebuilt. Taipei Dome is mainly used for various sports and concerts, and it also has the function of full-court icing, which can be used for ice activities. Historical Evolution The Taipei Dome was built by the Taipei Municipal Government. In June 2005, it was put into trial operation in 5438+ 10, and officially opened in June 2005. Show Lo's "Power of Love Charity Concert" became the first performance of Dome. On March 24th, 2007, the first overseas concert of Japanese pop diva Ayumi Hamasaki was held here. More than 65,438+00,000 tickets were sold out in two hours, setting a new record for Taipei Dome. Business model Taipei Dome is operated by Dongsen Dome Management Co., Ltd., a subsidiary of Dongsen Media Group, in the form of a contract to entrust the management and procurement of municipal properties, and pays about NT$/kloc-0.40 billion in Taipei municipal government royalties every year. In 2006, there were 6 black and white dome1/kloc-0, and the number of rental days reached 232 days. In the absence of professional sports events in Taiwan Province Province, the management team of Dongsen Dome made this achievement in the first year of opening, which is worthy of recognition. However, Dongsen Group was prosecuted by the prosecution on August 20, 2007 for allegedly obtaining the right to operate through illegal bidding. On August 22, 2007, the Taipei Municipal Government terminated the entrusted operation contract with Dongsen Dome in accordance with Article 50 of the Government Procurement Law, and further forcibly recovered the management right of Taipei Dome in accordance with the Regulations on the Autonomy of Entrusted Property Management in Taipei. The Taipei MRT Company was responsible for the management and facilities maintenance. After the Taipei Municipal Government took back the operation of Taipei Dome, although it was repeatedly questioned by the outside world that it was unable to operate in the first two months, the municipal government first controlled the hardware, then developed the software, and gradually mastered the operation mode. With the help of rent reduction and other supporting measures, the stalls of Dome were full from June 65438 to 2007 10, and the Golden Horse Award was held in Dome in 2007, which won favorable comments from all walks of life. According to the data of the municipal government, by June 5438+February, 2007, the scheduling demand had been scheduled to June 5438+ 10, 2008, but on the other hand, it is obvious that the municipal government still has a thorny challenge, that is, most of the affiliated commercial facilities shops on the first floor choose to withdraw their leases when the leases expire, and now more than half of them are empty. On May 20th, 2008, the inauguration ceremony of Taiwan Province regional leader Zhen Mu Wang-IX was held in Little Dome.