1 bidding documents of the bidder's instructions part of the bidding process, bid opening and evaluation procedures and bidding notes
2 project requirements part of the focus of the bidding content and scope, requirements, etc., is the focus of the analysis
3 bidding documents format, without explanation
4 contract terms, see the main terms, to analyze the business conditions of this sensitive
5 evaluation methods, important, detailed look at the scoring points, targeted to take the bidding strategy. Terms, to analyze the business conditions, business people sensitive to
5 evaluation methods, important, detailed look at the scoring points, targeted to take the bidding strategy.
(Attached to the back of the other netizen proposal is considered to answer this question from another angle, paste it to you, as a reference
Based on the bidding documents in the bidding documents specified in the bidding document format, such as the number of copies of the required bidding documents, business and technology part of the integrated how to bind, is separate or combined, the cover of the signature and sealing requirements, the content of the signature and sealing requirements, bidding sealing requirements, originals, and how to bind and seal. Whether to verify and how to bind, seal and so on the format and production requirements
Content based on the bidding documents require the format and order of production, do not lack of items, more than one, change the format of the bidding documents
Technical part as well as the integrated part of the bidding unit for the bidding for the project to prepare or add the corresponding content, business offer part of the quote should pay attention to the offer unity, do not appear more than one offer, the key parts Add the seal of the costumers
After all the production is completed, the bidding documents against the tender documents of all the provisions of the abolition of the bidding documents for comparison, all due to factors other than the offer may lead to the abolition of the bidding for modification
Additionally, to exclude the bidding unit of the objective factors, attentive, serious attitude is the key to a good bidding documents )