Current location - Recipe Complete Network - Catering training - Does it cost money to apply for urban drainage permit?
Does it cost money to apply for urban drainage permit?
Free of charge, according to the "urban drainage permit management measures" implementation.

Article 22

Drainage management departments shall not charge fees in the process of handling urban drainage permits.

The funds required for the implementation of the drainage permit by the drainage management department shall be included in the budget of the drainage management department, which shall be guaranteed by the finance at the corresponding level and allocated according to the approved budget.

According to the Measures for the Administration of Urban Drainage Permits, the following industries need to apply for drainage permits:

Article 4

The term "drainage households" as mentioned in these Measures refers to the units and individual operators that discharge sewage into urban drainage pipe networks and their ancillary facilities due to activities such as manufacturing, construction, electricity and gas production, scientific research, health, accommodation, catering, entertainment and other services.

Extended data

According to the Measures for the Administration of Urban Drainage Permit

Article 8

Meet the following conditions, to be issued by the city drainage permit:

(1) The setting of sewage outlets meets the requirements of urban drainage planning;

(2) The discharged sewage conforms to the Water Quality Standard for Sewage Discharged into Urban Sewers (CJ3082) and other relevant standards and regulations. Among them, the sewage discharged directly into the water body without entering the sewage treatment plant after passing through the urban drainage pipe network and its ancillary facilities shall also meet the Integrated Wastewater Discharge Standard (GB8978) or related industry standards;

(three) the corresponding sewage treatment facilities have been built according to the regulations;

(4) The discharge port is provided with a special inspection well;

(5) The key sewage industrial enterprises that discharge sewage easily endanger the normal operation of the urban drainage pipe network and its ancillary facilities have installed online detection devices capable of detecting water quantity, pH and CODcr (or TOC) at the sewage outlets; Other key sewage industrial enterprises and key drainage households have the ability to detect water quantity, pH, CODcr, SS and ammonia nitrogen, and the corresponding water quantity and water quality detection system;

(6) If there is sediment in the temporary drainage of various construction operations, which is enough to cause blockage or damage to the drainage pipe network and its ancillary facilities, the drainage households have built pre-sedimentation facilities, and the discharged sewage meets the standards stipulated in the second paragraph of this article.

Key sewage industrial enterprises and key drainage households shall be determined by the drainage management department in conjunction with relevant departments and announced to the public.

Article 9

To apply for the urban drainage permit certificate, the following materials shall be submitted truthfully:

(a) the application form for urban drainage permit;

(2) Drawings and explanatory materials on the position and caliber of special inspection wells and sewage outlets;

(three) the relevant materials for the construction of sewage treatment facilities in accordance with the regulations;

(four) the drainage quality and quantity inspection report issued by the drainage monitoring institution with the qualification of measurement certification within one month before the date of accepting the application for drainage permit;

(5) The key sewage industrial enterprises that discharge sewage easily cause harm to the normal operation of urban drainage pipe network and its ancillary facilities shall provide relevant materials that have installed online detection devices at sewage outlets to detect water quantity, pH and CODcr (or TOC); Other key sewage industrial enterprises and key drainage households should provide materials and detection systems with the ability to detect water quantity, pH, CODcr, SS and ammonia nitrogen.

Article 10

The validity period of the urban drainage permit certificate is 5 years. If sewage is temporarily discharged to the urban drainage pipe network and its ancillary facilities due to construction needs, the validity period of the urban drainage permit certificate shall be determined by the drainage management department according to the drainage situation, but the longest period shall not exceed the construction period.

Article 11

If it is necessary to continue to discharge sewage after the expiration of the validity period of the Urban Drainage Permit Certificate, the drainage households shall apply to the drainage management department 30 days before the expiration of the validity period. The drainage management department shall, according to the application, make a decision on whether to approve the extension before the expiration of the validity period. If the extension is granted, the validity period shall be extended for 5 years.

Drainage households discharge sewage in strict accordance with the contents of the permit within the validity period of the Urban Drainage Permit. Upon the expiration of the validity period, with the consent of the original approval authority, the examination may not be carried out, and the validity period of the urban drainage permit may be extended for 5 years.