How to write 1 in the decoration design contract agreement?
Party A:
Party B:
Based on the principles of fairness, justice and mutual benefit, Party A and Party B have reached the following agreement through consultation:
First, the theme:
Graphic design service of "X" project
Two. Work entrusted by Party A to Party B:
Party B has specially set up the "X" project team, which is responsible for the graphic design of the project, including the following contents:
2. 1, project brand management planning
1, basic system design (existing)
2. Application system design
A: Design of real estate display system B: Design of sales supplies system C: Design of real estate oriented system
3. Outdoor advertising
A: On-site guide card, street signs, bus shelters, body advertisements, etc.
2.2. Design and production of publicity materials for the whole project.
1, sales brochure design (including leaflets, folding design, etc. )
2. Exhibition board design of sales office;
3. Construction procurement instruction manual;
4. Design of other publicity materials;
5. Newspaper advertising design
Three. Terms of Service and Contract Price:
1. Party B shall provide graphic design services simultaneously according to the marketing plan of the project "Use the world and rhyme the city with water". The service period is 65438+February, and the contract is from year month to year month.
2. The contract price of design services provided by Party B is RMB X only.
3. After the expiration of the performance period of this contract, if Party A needs to continue to entrust Party B with property services in the later period of this project, both parties may sign another contract.
Four. Payment method:
In order to ensure the smooth progress of Party B's work, on the basis of mutual trust, both parties confirm that the specific payment method and time limit for Party A to pay the above contract price to Party B are as follows:
1. Pay monthly, with the monthly design fee of X million yuan (X), and pay the monthly design fee of X million yuan (X) on the day of signing the contract.
2. The design fee for the next month shall be used to pay the design fee of RMB ten thousand Yuan (X) before the 5th of the current month, and the rest shall be the same every month.
Verb (abbreviation of verb) Rights and obligations of Party A:
1. Party A shall provide materials, documents, information and statements related to the overall advertising design, production and implementation according to Party B's requirements, so as to ensure that Party B can complete all advertising design and other work entrusted by Party A on time;
2. Party A shall pay the contract price to Party B in full according to the provisions of this contract.
3. Party A has the right to propose amendments to Party B's design scheme, and Party B shall make timely amendments and/or adjustments according to Party A's opinions until Party A confirms in writing;
4. Actively cooperate with Party B to carry out the work, and put forward specific amendments within three working days after receiving Party B's design draft; If it is overdue, Party A shall be responsible for any mistakes.
The rights and obligations of party b with intransitive verbs
1, and has the right to obtain the corresponding contract price according to the provisions of this contract.
2. According to the progress and needs of Party A's overall planning and sales of this project and Party A's requirements, complete the planned tasks within the specified time;
3. Party B shall submit the design draft (including the copy) according to the time requirements of Party A..
4. Abide by the confidentiality provisions of Party A's business secrets learned in the process of accepting the entrustment.
Seven. responsibility for breach of contract
Except for force majeure, if Party A violates this contract and Party B terminates the execution of this contract, Party A shall be responsible for compensating the economic losses caused to Party B; If Party B violates this contract, Party B shall bear the economic losses caused to Party A as a result.
Eight. others
1. This agreement is made in duplicate, one for each party, and shall come into effect as of the date when the authorized agents of both parties sign and seal it. Matters not covered in this contract shall be settled by both parties through consultation;
2. Disputes arising from the execution of this Agreement shall be settled by both parties through consultation on the principle of honesty, unity and mutual benefit; If negotiation fails, it can be settled through arbitration or legal channels.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
How to write the decoration design contract agreement 2
Party A: Party B:
In order to realize the cooperation of project management, Party A and Party B reach an agreement on the graphic design of project name advertisement, and sign the following agreement through consultation:
I. Contents of cooperation
Second, the term of cooperation.
The term of the contract is tentatively set at one year, from the date of the month to the date of the month.
Third, the charging method.
The total annual design fee and copywriting fee is RMB 30,000 (in words: RMB 30,000 only), including copywriting fee and design fee. (See the attached table for the number of design items, and the specific number of design materials shall be determined according to the actual situation of Party A)
1. From the date of signing the contract, Party A shall pay 20% of the total cost of the commissioned design, that is, RMB Yuan only (in words:), so that Party B can actively carry out the design work and write advertising copy.
2. When 50% of the design is completed in the middle period, Party A shall pay 50% of the balance to Party B, that is, RMB only (in words).
3. In the later stage of design, Party A shall pay off 30% of the balance, that is, RMB Yuan only (in words).
Four. Task of Party B
(1) Everything related to the graphic design of this project is the task of Party B.. (Attach a detailed design list. If it is necessary to increase or decrease, both parties shall negotiate on their own according to the actual situation of the project. ) Party B has the obligation to finish it in time and seriously.
(2) Party A gives Party B the work task list and issues the design task (if it is notified by telephone due to time problem, the design task list will be reissued later, see Annex 1 for details), and Party B responds positively.
(3) When designing, Party B must seriously consider the consistency between the design style before and after and the project style to ensure that the content expressed by the design ideas is clear and artistic.
(4) The works designed by Party B must be approved by Party A, and Party A has the right to put forward reference opinions and modification opinions on the design until both parties are satisfied with the designed works.
Verb (abbreviation of verb) liability for breach of contract
(1) If Party B's design work is simple and perfunctory to Party A's requirements, Party A has the right to impose a fine on Party B 100-200 yuan/time.
(2) If Party A fails to pay in time, Party B has the right to recover the arrears, and from the 3rd1working day of the arrears, Party A shall compensate three thousandths of the outstanding principal every day.
This agreement is made in duplicate, one for each party. If necessary, the supplementary agreement has the same effect as this agreement.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
How to write the decoration design contract agreement 3
Party A (the entrusting party):
Party B (executor): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Through friendly negotiation, Party A and Party B have reached the following agreement on the promotion of brand advertising projects of "Limited Company" based on the principle of equality and mutual benefit: Party A entrusts Party B as a brand design consultant company of Limited Company to be responsible for brand design planning (other projects involving third-party production, namely finished product production, Party B has the priority to bid).
I. Contents and requirements of the contract
1, design period:
The one-year term is _ _ _ _ months' legal working days, and the entrustment period is one month. Before the expiration of the cooperation term proposed in this agreement, both parties can negotiate to renew the cooperation agreement.
2. Design scope:
Category VI leaflets (leaflets), colorful pages, LOGO, outdoor advertising designs, posters, product packaging designs, envelopes, business card designs, envelopes, calendars, desk calendars, data forms and design projects agreed by both parties. Website style design, Taobao retouching, explosive product design, webpage graphic uploading, micro-graphic processing, website homepage image advertisement, and design projects agreed by both parties.
Remarks:
1, the above package price does not include post-production and installation, transportation, printed matter, inkjet products and other materials.
2. Not including the design of periodicals and magazines, and the brochures above 16P. If necessary, please negotiate separately.
3. The delivery time of all design work shall be determined according to the workload, and this contract shall come into effect after being signed and sealed.
4. The development and construction of large-scale projects and the establishment and promotion of large-scale brands do not belong to the service scope of this contract. If services are needed, a separate service contract should be signed.
Second, the cost
Annual design fee: RMB _ _ _ _ _ _ (in words: RMB only: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _)
Three. Payment method (year/quarter)
1. Party A and Party B sign the contract every year and settle the expenses every year.
1. 1. After the signing of this contract, Party A will pay Party B the first quarter fee (_ _% of the total fee) within 3 working days, that is, RMB (in words: _ _ _ _ _ _ _);
2. Party A and Party B sign the contract every year and settle the expenses every quarter.
2.2. After the signing of this contract, Party A will pay Party B the first quarter expenses (_ _% of the total case expenses) within 3 working days, namely RMB (in words: _ _ _ _ _ _ _); Pay the fees for the next quarter in advance within 3 days after the expiration of the second quarter, and so on.
Remarks: All the above quotations do not include tax.
Fourth, service.
1. The main members of the advertising working group are professionals of Party B, and the advertising products have been reviewed by all project teams at or above the director level to ensure the professional level of advertising.
2. Party B shall set up a special advertising working group to provide Party A with professional services in print advertising planning and design. During the contract period, the project director of Party B will lead a team to Party A's site to hold two or more advertising work reports with Party A every month. If Party A is busy, Party B will deploy the advertising work plan reasonably and concretely according to Party A's needs.
3. During the cooperation period, according to the customer's needs, cooperate with customers to carry out relevant marketing, product graphic design, advertising planning and production execution at any time.
4. If Party A requires Party B to carry out work beyond the scope stipulated in this contract, Party B shall actively cooperate with Party A, and if actual expenses occur, Party A shall pay other relevant expenses to Party B..
5. During the cooperation period, if Party A requests Party B to carry out marketing projects in cities other than Guangzhou, the travel expenses and accommodation expenses incurred by Party B's staff shall be borne by Party A without subsidizing other expenses.
Verb (abbreviation for verb) The responsibilities and obligations of both parties.
1. Obligations of both parties
In order to meet Party A's promotion needs, Party A and Party B agree to conduct continuous research and assist Party A in the promotion work through the professional promotion planning service provided by Party B. ..
2. Rights and obligations of Party A
2. 1 During the contract period, Party B shall actively cooperate with Party A and arrange a staff member to contact Party B for work. At the same time, Party A shall provide all kinds of pictures, written materials and relevant approvals in time, and be responsible for the legality and authenticity of the above materials. In case of legal disputes caused by the information provided by Party A, Party A shall bear all relevant responsibilities, and Party B shall not bear any direct or joint responsibilities. If Party B's image and economy are damaged as a result, Party B has the right to take legal procedures to safeguard its rights and interests.
2.2 Party A has the right to comment on the brand strategy, print advertising planning ideas, design drafts and all books submitted by Party B.
Party B shall promptly put forward opinions and suggestions on the composition of the face-to-face works in written form or e-mail, and Party B shall make modifications and adjustments accordingly until Party A approves them. However, Party A's suggestions and opinions should respect Party B's professional experience and knowledge, and take into account Party B's work cycle and other factors, and put forward opinions in a timely and comprehensive manner after Party B submits the design draft, so that Party B can have enough time to complete various businesses with good quality and quantity. Party A shall appoint a plenipotentiary to communicate with Party B in order to improve the quality and efficiency of work.
2.3 After the signature is finalized, if Party A proposes to revise it again, Party A shall bear the expenses of the third party and the work delay caused thereby, and Party B shall not bear the direct responsibilities and losses.
2.4 Party A shall make payment within the time limit agreed in this contract to ensure the normal operation of the project. If Party A fails to pay in time, Party B has the right to suspend work as appropriate.
2.5 When Party A puts forward various formal instructions and opinions, it shall adopt written methods including fax to improve the efficiency of communication and future verification.
2.6 In order to ensure the smooth progress of the project, Party A has the responsibility to implement the advertising promotion plan confirmed by both parties as planned.
2.7 Party A shall be responsible for all relevant government approval procedures. Party B shall actively assist relevant work.
3. Rights and obligations of Party B
3. 1 During the contract period, Party B shall serve Party A with due diligence, and complete the brand planning, design and production tasks assigned by Party A on time with good quality and quantity.
3.2 Party B shall take the initiative to ask Party A for all kinds of relevant materials in advance, but Party B shall provide all kinds of pictures and materials needed for creative design by itself (model fees shall be charged to Party A separately for pictures with models), and ensure their legality and authenticity. In case of legal disputes arising from the information provided by Party B, Party B shall bear all relevant responsibilities, and Party A shall not bear any direct or joint responsibilities. If Party A's image and economy are damaged as a result, Party A has the right to take legal procedures to safeguard its own rights and interests. If Party A needs Party B to publish advertisements or produce printed matter, packaging and other terminal materials, the third-party expenses shall be paid separately by Party A (including production expenses: plate making expenses, model expenses, venue expenses, photography expenses, film expenses, design expenses, proofing expenses, printing expenses, film production expenses, transportation expenses, media expenses, travel expenses, transportation expenses, accommodation expenses and other third-party items such as printing and gifts are all production expenses.
3.3 If the finished product is inconsistent with the original confirmed by Party A due to Party B's work, thus causing damage to Party A, Party B shall compensate Party A for relevant losses.
3.4 All publicity and promotion plans and relevant suggestions of Party B shall be reported to Party A in written form.
3.5 Party B shall keep close contact with Party A, provide Party A's report on advertising promotion, and make clear the detailed advertising arrangement plan. If the work progress is affected due to Party B's unilateral reasons, Party B shall bear the related losses caused thereby.
3.6 All planning, design and agency release of Party B shall comply with the relevant provisions of the Advertising Law, and Party B shall be obliged to remind Party A of relevant matters.
Agreement on intellectual property rights of intransitive verbs
1. Party B enjoys the copyright of the design works. Party B shall transfer the copyright of the work to Party A free of charge after Party A has settled all the expenses of the commissioned design.
2. Before Party A pays all the commissioned design fees, the copyright of the works designed by Party B belongs to Party B, and Party A has no rights to the works.
3. Before the balance is paid off, Party A uses or modifies the works designed by Party B without authorization, and Party B has the right to pursue its legal responsibility according to the Copyright Law of People's Republic of China (PRC), except with the permission of Party B. ..
Seven. responsibility for breach of contract
1. After the signing of this contract, both parties shall fully perform this contract.
2. Because of the overall embodiment of designer Party B's intellectual achievements, there is no obvious stage in his work characteristics, and Party B has been fully fulfilling the contract at the beginning of planning. In view of this, if Party A terminates the contract in advance, it will still undertake the obligation to pay all the contract money to Party B (unless both parties agree to terminate it).
3. If Party B terminates the contract in advance due to breach of contract, all the fees collected in the current quarter shall be returned to Party A. If the design work cannot be completed on schedule due to Party B's reasons, Party B shall pay Party A a penalty of 0.5% of the total bid amount of this contract for each day of delay. The total delay time is fifteen days. In addition to paying liquidated damages to Party A according to this standard, Party A has the right to terminate the contract, and Party B shall refund all the fees collected by Party A in the current quarter. ..
4. During the performance of this contract, if Party A fails to make payment as stipulated in the contract, Party A shall pay 0.5 ‰ of the liquidated damages for each day overdue.
5. Any dispute arising from the performance of this contract shall be settled by both parties through friendly negotiation. If negotiation fails, either party may submit it to Changsha Arbitration Commission for arbitration or bring a lawsuit to the local court for settlement.
Eight. Entry into force of contract
This contract shall be signed and sealed by both parties, and the effective date shall be the last signing date of both parties. This contract is made in duplicate, which shall come into effect as of the date of signature and seal by both parties, with Party A holding one copy and Party B holding one copy, all of which have the same legal effect.
Party A (signature): _ _ _ _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
How to write the decoration design contract agreement 4
Party A: _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _
Party A hereby entrusts Party B to design a private house with a usable area of _ _ _ _ _ _ _ _ square meters.
1. Party A entrusts Party B to design the house, and Party B will draw the floor plan within _ _ _ _ days after Party A provides all the information according to Party A's requirements and design principles.
2. Party A confirms the plan. After confirmation, Party A and Party B sign this design power of attorney, and Party A pays the first design fee deposit, which is _ _ _ _% of the total design fee. (See Article 6 for the charging standard of design fees), Party B shall try its best to prepare on site.
Three. After signing the contract, Party B shall draw a detailed elevation within _ _ _ _ _ days after entering the elevation design.
Four. Design content: design scheme and all construction drawings.
Including supporting specialties: main body positioning diagram, ceiling diagram, switch socket diagram, circuit layout diagram, elevation diagram of each room, communicate with the owner, and both parties will sign and finalize the design after review.
5. Party B shall make renderings according to the elevation (see Article 7 for the collection standard of renderings).
6. Requirements for drawing mounting: Party B shall deliver a set of A3 design drawings, and Party A shall be responsible for the excess expenses, and Party A shall settle the final payment of the design.
Seven. Design fee standard: the apartment is _ _ _ _ _ _ _ yuan per square meter, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Eight. Plastering charge standard: standard living room _ _ _ _ _ _ _ yuan/piece, duplex _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Nine. Rights and obligations of both parties:
1. Party A
(1) According to the contents stipulated in this contract, submit basic materials and documents to Party B within the specified time, and be responsible for their completeness, correctness and time limit. Party A shall not require designers to design in violation of relevant national standards.
(2) If Party A submits the above materials and documents within _ _ _ _ _ _ days, Party B shall delay the delivery of the design documents according to Article 3 of this contract; If it exceeds _ _ _ _ _ _ days, the designer has the right to re-determine the time for submitting the design documents.
(3) When Party A changes the entrusted design project, scale and conditions, or Party B's design is reworked due to errors or major modifications in submitted materials, both parties shall sign a supplementary agreement (or another contract) through consultation to clarify relevant terms, and Party A shall pay Party B the rework fee according to the workload consumed by Party B. ..
(4) During the performance of the contract, if Party A requests to terminate or dissolve the contract and Party B fails to start the design work, the deposit paid by Party A will not be refunded; If the design work has been started, Party A shall pay half of the design fee for this stage according to the actual workload completed by Party B; if it exceeds half, it shall be paid in full according to the design fee for this stage.
(5) Party A must pay the down payment as stipulated in the contract, and the receipt of the down payment will be used as a sign for Party B to start the design. If the deposit is not received, Party B has the right to postpone the start of design work and the delivery of documents.
(6) Party A shall pay the design fee to Party B according to the amount and date stipulated in this contract, and shall bear the liquidated damages of _ _ _ _% of the payable amount for each day overdue, and the time for Party B to submit the design documents shall be postponed. If the overdue period exceeds _ _ _ _ _ _ days, Party B has the right to suspend the next stage of work and notify the Employer in writing.
(7) When Party A requires Party B to deliver the design documents in advance, it must obtain Party B's consent, and shall not seriously deviate from the reasonable design cycle, and Party A shall pay overtime.
2. Party B
(1) Party B shall design according to the national regulations and the technical specifications and standards agreed in this contract, and deliver the design documents to Party A according to the contents, time and quantity specified in Article 6 of this contract (except in the case of delayed delivery of design documents according to Articles 2, 3, 5, 6 and 7). And be responsible for the quality of the submitted design documents.
(2) The designed reasonable service life is _ _ _ _ _ _ years.
(3) Party B is responsible for modifying or supplementing the omissions or errors in the design documents. If the engineering quality accident losses are caused by Party B's design mistakes, the designer shall, in addition to taking remedial measures, waive the design fee for the lost part and compensate the Employer according to the loss degree. The amount of compensation is _ _ _ _ _% of the international loss agreed by both parties, and the total amount shall not exceed the total design fee.
(4) If the delivery time of design documents is delayed due to Party B's reasons, the design fee receivable for this project shall be reduced by _ _ _% for each day of delay.
(5) After this contract comes into effect, if Party B requests to terminate or dissolve this contract, Party B shall double the deposit paid by the employer.
This agreement is made in duplicate, one for each party, and shall come into force after being signed.
Party A (seal): _ _ _ _ Party B (seal): _ _ _ _ _ _
Representative (signature): _ _ _ Representative (signature): _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
How to write the decoration design contract agreement?
Employer: (hereinafter referred to as Party A)
Designer: (hereinafter referred to as Party B)
Name of design project:
Design project location:
Design project areas:
Party B guarantees that it is a legally qualified design unit, and Party A entrusts Party B to carry out the decoration design work due to the needs of the decoration project, and this contract is signed by both parties through consultation.
Article 1 This contract is signed on the basis of the following documents:
1. Contract Law of People's Republic of China (PRC), Construction Law of People's Republic of China (PRC) and Regulations on Market Management of Construction Engineering Survey and Design.
2 national and local laws and regulations on survey and design management of construction projects.
Article 2 Design Time
1. Design cycle:
The design period is days, from the date when Party B receives the deposit paid by Party A to the date when Party A delivers the complete set of design drawings. If Party A changes the design requirements or fails to reply to Party B's opinions in time, the delayed time will be deducted from the design period agreed in the contract.
2. Steps and time of drawing design:
(1) Party A and Party B shall determine the design details and amount after face-to-face negotiation, that is, sign this contract and pay the down payment of RMB. Within days after Party B receives the deposit, Party B shall submit to Party A the decoration design scheme and the plane function positioning diagram, and submit to Party A a more detailed decoration design scheme within days, including the main elevation and the first floor effect diagram. If Party B fails to submit the decoration design scheme, plane function positioning diagram and preliminary effect diagram, it will return double the deposit to Party A. ..
(2) Party A shall confirm the elevation and ceiling drawings, and propose a modification plan for the preliminary effect drawings, and pay the first payment.
(3) Party A shall pay the design fee for the second phase after signing and confirming the design and construction drawings, and Party B shall provide Party A with a full set of formal design and construction drawings.
(4) After the project starts, Party B shall send personnel to cooperate with the construction team for on-site guidance, and provide consulting services on materials and project quality to the owner, and pay the design fee for the third phase after the project is completed.
Article 3 Design materials and documents that Party B shall deliver to Party A:
Time and content requirements for submitting serial number data and file name and number of copies
Article 4 Design fee amount and payment time
1. The design fee is RMB/m2, and the total estimated design fee in this contract is RMB (in words: RMB only).
2. Payment time:
(2) The initial design fee paid by Party A is 20% of the estimated total amount (including the down payment);
(3) The second phase design fee paid by Party A is 50% of the total estimated amount;
(4) The third phase design fee paid by Party A is 30% of the total estimated amount;
(5) If the design fee is increased through consultation between both parties, it shall be paid to Party B before the project starts; At the request of Party A, Party A shall pay Party B the increased expenses due to providing services beyond the contract requirements before the completion of the project.
Article 5 Relevant materials and documents that Party A shall submit to Party B.
Matters related to serial number information and file name, number of copies and submission date.
Article 6 Liability of both parties
Party A's responsibilities:
1. Party A shall submit materials and documents to Party B within the specified time according to the contents of this contract.
2. Within 65,438+05 days after Party A submits the above materials and documents, the time for Party B to deliver the design documents shall be postponed; When the specified time limit exceeds 15 days, Party B has the right to re-determine the time for submitting design documents.
3. Party A shall provide necessary working and living conditions, transportation and other convenient conditions for the personnel sent to the site to deal with related design problems.
Party B's responsibilities:
1. Party B shall carry out the engineering design according to the national technical specifications, standards and regulations and the design requirements put forward by Party A, and submit the qualified design data according to the schedule requirements stipulated in the contract, and be responsible for it.
2. The main technical standards adopted by Party B are:
3. The reasonable design service life is 15 years.
4. Party B shall deliver materials and documents to Party A according to the contents, time and number of copies specified in this contract.
5. After delivering the design data and documents, Party B shall participate in the relevant design review as required, and be responsible for making necessary adjustments and supplements to the contents within the original scope according to the review conclusions. Party B shall deliver the design data and documents within the time limit stipulated in the contract, and start the construction within this year, and be responsible for the design disclosure to Party A and the construction unit, handling related design problems and participating in the completion acceptance. If the project does not start within one year, Party B will still be responsible for the above work, but shall charge Party A consulting service fee according to the required workload, and the fee shall be determined by both parties through consultation.
6. Party B shall protect the intellectual property rights of Party A, and shall not disclose or transfer the technical and economic data such as product drawings submitted by Party A to a third party. If the above situation occurs and causes economic losses to Party A, Party A has the right to claim compensation from Party B. ..
7. Party B shall complete the design according to the requirements of Party A in a serious and responsible spirit.
8. Party B's failure to perform any obligations stipulated in this contract shall be regarded as a fundamental breach of contract, and Party A shall have the right to terminate this contract, and Party B shall compensate Party A for the losses suffered as a result.
Article 7 Liability for breach of contract:
1. Party B shall be responsible for modifying or supplementing the omissions or errors in the design data and documents. If the engineering quality accident loss is caused by Party B's mistake, Party B shall be responsible for taking remedial measures and exempting the design fee for the direct loss. In case of serious losses, Party B shall pay compensation to Party A according to the degree of losses and Party B's responsibilities, and the compensation shall be% of the actual losses agreed by both parties.
2. Due to Party B's own reasons, the delivery time of design materials and documents stipulated in this contract is delayed, and for each day of delay, two thousandths of the design fee receivable for this project will be reduced.
Article 8 Others
1. In the design data and documents of this project, building materials, building components and equipment. It shall indicate its specifications, models, performance and other technical indicators, and Party B shall not designate manufacturers or suppliers.
2. Party A entrusts Party B to undertake the work services beyond the contents of this contract, and pay other expenses.
3. If the contract cannot be performed due to force majeure, both parties shall settle it through negotiation in time.
4. Any dispute arising from this contract shall be settled by both parties through negotiation in time, or through mediation by the local construction administrative department. If mediation fails, it shall be decided by the Minhang District People's Court in Shanghai where the contract was signed.
5. This contract is made in duplicate, one for each party, and it will come into effect after being signed and sealed by both parties.
6. For matters not covered in this contract, both parties may sign a supplementary agreement. Relevant agreements, telegrams, faxes and meeting minutes recognized by both parties are an integral part of this contract and have the same legal effect as this contract.
7. Other agreed matters:
Party A (seal): Party B (seal):
Legal representative: (signature) Legal representative: (signature)
Authorized Agent: (signature) Authorized Agent: (signature)
Domicile: domicile:
Tel: Tel:
Bank of deposit: Bank of deposit:
Bank account number: Bank account number:
Date: Year Month Day Date: Year Month Day
How to write relevant clauses in the decoration design contract agreement;
★ Model home decoration design contract
★ Decoration design agreement contract 202 1 template
★ 4 Simple Decoration Design Contract Template
★ 4 formal decoration design contract templates
★ Contract template for interior decoration design of lamps and lanterns
★ 3 model decoration design contracts
★ Standard Edition Decoration Design Contract
★ 3 templates of decoration design entrustment contract
★ General Edition of Decoration Design Contract 2020