Sample contract template
Sample contract template, in our daily life, the need to use a variety of contracts, the contract is a strict requirement for the format of the text, it is legally effective, so there are many writing specifications and other issues, sample contract template.
Sample contract template 1First, the origin of the contract
The contract is adapted to the objective requirements of the private sector of the commodity economy and the emergence of the exchange of commodities in the form of legal expression. After the creation of commodity production, in order to exchange the security and credibility, people in the long-term exchange practice gradually formed a lot of habits and rituals about the exchange.
These customs and rituals of commodity exchange have gradually become the general rules of commodity exchange.
With the establishment of private ownership and the emergence of the state, the ruling class, in order to maintain private ownership and the normal economic order, put the custom and rules of commodity exchange in their favor in the form of law, and to ensure the implementation of the state coercive force. Thus the legal formation of contracts for the exchange of commodities came into being.
Contracts were emphasized in ancient Rome. Contracts had to be signed in a prescribed manner before they became legally effective.
If any of the details of the terms and actions of the contract ceremony were left out, it would invalidate the entire contract. With the development of the commodity economy, this cumbersome form directly affects the development of commodity exchange. In theory and practice, Roman law gradually overcame the formalism in contracting.
The emergence of the contract of necessity and the contract of consent marks the change of Roman law from emphasizing the form to emphasizing the will of the contracting party, which makes the exchange of commodities from the cumbersome form free, and becomes the historical source of the modern concept of freedom of contract.
Entrusted unit (referred to as Party A): _________
Entrusted unit (referred to as Party B): _________
Party A to Party B to handle the property trust, in addition to confirming the word of the property trust No. _________ "basic agreement on property trusts," the terms of the specific matters relating to the property trust.
Article II Party A guarantees the implementation of the supply contract concluded between the supply and demand sides. Where the off-delivery or product quality and other defaults, Party A is responsible for dealing with.
Article 3 Party B agrees that according to the provisions of Article 4 of the "Basic Agreement on Property Trust", within _________ days after the receipt of the banker's acceptance bill of the unit in need of goods, Party B will advance all the payment to Party A at one time according to the amount of the acceptance bill.
Article 4: Party A shall pay Party B's property trust fee of _________ within _________ days after Party A receives Party B's advance payment for the goods.
Article 5 From the date of signing this contract, until Party B fully recovered the financing principal and interest for the property trust period, during this period, if any unforeseen matters, so that Party B can not recover the financing principal and interest, Party A confirms that Party B has the right to Party A jointly and severally recovered financing principal and interest has not been recovered.
Party A (seal): _________ Party B (seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ month ____ day
Place of signing: _________
Sample Contract Form Template 2Party A:
Party B:
After the consultation between Party A and Party B, Party B will contract the construction task of mud work, in order to clarify the rights and obligations of the two parties, this agreement is hereby formulated so as to *** with the same to comply with.
First, the project overview:
1, project name: xxxx
2, project location: xx all the way
3, structural type and number of floors: frame shear structure of thirty-three floors (one underground)
Second, the quality of requirements: <
1, Party B construction in accordance with the drawings, to ensure that the scope of the contract within the part of the project quality to meet the relevant national or local acceptance standards and norms, where not in line with the national acceptance norms and the requirements of the Ministry of the project, Party B must rework, and bear the reworking of all the costs of materials, and in addition, Party A has the right to pursue the Party B caused by the loss of work time and materials.
2, strict implementation of the quality of the "three inspection" system, after the completion of each process, Party B according to the requirements of the Ministry of the project first self-check, mutual inspection, handover inspection, not self-check, mutual inspection, handover inspection, or in the Ministry of the project inspection of the same kind of problems repeatedly, each time, a fine of 200 yuan, and so on.
3, Party B operators must cooperate with the project department constructor, quality and safety officer work, the project department constructor, quality and safety officer in the construction process or acceptance of the rectification advice, Party B must be in accordance with the implementation of the refusal to implement the rectification advice, or rectification in a timely manner, or rectification is still unable to meet the quality requirements of the fine of 200 yuan each time, and so on.
Third, safety matters:
1, Party B team leader for the first person responsible for safety, must cooperate with Party A and the Ministry of the project to do a good job on site and daily safety work.
2, Party B should do a good job of safety education in the class, before going to work for safety inspection and education briefing, after work for safety summary, and make a good safety education records, improve the awareness of safety inspection of the team.
3, Party B must strictly implement the national, local and project safety operating procedures, safety management rules, safety management system and security management regulations.
4. Party A has applied for accidental injury insurance for Party B's operators. In case of work-related accidents, Party B must notify Party A at the first time so that Party A can report to the insurance company in time. In case of work accident, in addition to the compensable expenses of the insurance company, all other losses and expenses (including lost wages, nutritional expenses, accompanying costs, transportation costs, etc.) shall be borne by Party B.
The scope of insurance company's claim: medical expenses above 2,000 yuan and below 30,000 yuan, disability expenses below 200,000 yuan, and one-time death compensation below 600,000 yuan.
5. Party B and Party B's operators voluntarily accept Party A and the Project Department's "Safety Penalty Regulations", and work strictly in accordance with the contents of the "Work Safety Responsibility Letter".
Fourth, the progress requirements:
Party B shall be issued by the Ministry of the project. Construction progress plan and constructor's arrangement of the organization of construction, the plan for the basement construction period of 10 days, the main body of the average duration of each layer of 5 days (including concrete pouring time), in addition to the special reasons reported to the Ministry of the project to approve the consent of the progress must be completed according to the plan or ahead of schedule.
Because Party B's reasons for three consecutive times can not meet the requirements of the schedule, Party A ordered Party B to unconditionally withdraw from the site, Party B unconditionally obeyed.
V. Contract content:
Workload within the scope of the construction drawings;
Commonly used tools and accessories to provide their own (etc.).
VI. Project contracting costs:
The contracting method adopted for this project.
Within the scope of the contract, Party B to complete the required work content, and construction quality acceptance, schedule, safety and civilized construction have reached the Party and the project department requirements, contracting settlement unit price: (such as construction quality to meet the requirements of the project department per square meter award yuan, this project payment after acceptance of all the works to be paid);
The implementation of the contract lump sum, the above lump sum unit price has included A variety of wages, allowances, quality incentives, schedule incentives, construction safety awards, civilized construction awards, transportation and handling costs, overtime on holidays, night shift, rush subsidies, self-prepared tools and appliances, labor insurance premiums, less than 2,000 yuan of medical costs of work-related accidents, lost time, travel expenses, management fees and other costs.
(This project has a contract labor outside the point of appearance, the A and B negotiation, there is a contract labor outside the point of appearance, according to the calculation of 200 yuan / workday. Note: According to the design institute to supply the construction drawings and drawings review, design changes for the basis of settlement, such as another design change is another increase or decrease.
VII, settlement and payment:
1, Party A according to the site responsible for the issuance of the construction task order workload and the contract agreed unit price and Party B settlement.
2, Party B contracted scope of work is not completed on the request to withdraw or because of Party B's construction quality, safety and civilized construction does not meet the requirements of Party A and the project department, or disobedience to Party A and the project department of the site management, resulting in Party A ordered to withdraw, Party B unconditionally withdrawn from the site, and unqualified floors will not be settled.
3, payment: before the settlement of the project, the Ministry of the project to borrow cash to pay the crew's living expenses, living expenses standard 40 yuan / day (monthly living expenses deducted at the time of the monthly settlement), the specific payment methods are as follows: 80% of the monthly amount of xx yuan / m2 of the amount of work to pay the wages of the laborers,
pay to the amount of total works of xx yuan / m2 of 90% of the amount of wages of the laborers,
pay to the amount of total works of xx yuan / m2 of 90% of the amount of wages,
pay to the amount of total works of xx yuan / m2 of 90% of the amount of wages. Pay to the total amount of xx yuan / m2 of 95% of the labor wages; the secondary structure of each building to pay to the amount of xx yuan / m2 of 90% of the labor wages,
secondary structure is done all the clearing to pay to the amount of xx yuan / m2 of 95% of the labor wages, the rest of the project to be completed and acceptance of all decorative works in five months to pay off all of the labor wages.
4, settlement payment, strictly honor the other rewards and penalties under this contract.
Eight, the contract performance bond
1, Party B to pay the contract performance bond. Party A shall issue a receipt to Party B upon receipt of Party B's performance bond, and Party B shall keep the receipt properly.
2. The content of the contract performance bond includes the provisions that Party B needs to strictly abide by in the process of fulfilling the contract, such as: management of personnel statistics, schedule, quality, safety, environmental protection, civilized construction, payment of farmer's wages, and compliance with the law and so on.
If the stipulated requirements are not met, a certain amount will be deducted from the performance bond; in the event of a serious breach of contract or irreparable loss to Party A, the entire bond will be confiscated and compensation will be made for the consequences caused to Party A.
3.
3, after the completion of the project, Party B according to the content of the contract signed by the two sides to complete, by the project acceptance of the Department in line with the requirements of the contract, then Party A within 15 working days to return Party B's performance bond.
Nine, other things top:
1, Party B designated as the person in charge of the site. Party B site responsible person shall not leave the construction site without authorization, and monthly attendance days shall not be less than 25 days. If you need to leave due to special circumstances, you must ask for leave from Party A and the person in charge of the building number of the project department and entrust the acting person in charge.
Those who do not fulfill the leave procedures will be fined 1000 RMB for every 1 day of absence. During the construction process, if there is no Party A and the Ministry of the project instructions, Party B shall not stop work without authorization, such as the occurrence of Party B shall compensate Party A for all the losses caused by this, and according to the size of the impact on the project, a fine of 1,000 to 10,000 yuan.
2, Party B contracted works shall not be subcontracted.
3, Party B must do a good job within the scope of the contracted finished and semi-finished product protection work and shall not destroy the other scope of finished and semi-finished products, or according to the loss of condition, double the penalty.
4, Party A has the right to dismiss Party B does not listen to the command and do not listen to the arrangements of the personnel; such as Party B can not meet the Party and the project department of the schedule, quality, site safety and civilization of construction and other requirements, Party A has the right to order Party B to suspend rectification until the termination of the contract, the resulting loss borne by Party B.
5, duration: due to water, electricity, project mechanical equipment failure and untimely supply of materials and other reasons caused by the Ministry of the Ministry of Party B's work more than eight hours delay and can not carry out the work of other processes, confirmed by the Ministry of the project according to the actual time to extend the duration.
6, all labor insurance costs included in the lump-sum unit price, Party B must be ready to do rainy day construction, rainy weather must be organized construction. However, it should be equipped with rainy day construction of raincoats, rain shoes and other labor protection supplies, and improve the cold and heat work.
7, the contract, if any outstanding issues, by both sides after the consensus to sign a separate supplementary agreement.
The above provisions shall take effect from the date of signature by both parties.
The annexes to this contract (Regulations on Safety Penalties, Letter of Responsibility for Safe Production, Letter of Commitment) and the relevant management system of Party A and the Project Department shall have the same legal effect as this contract.
This contract is in duplicate, Party A and Party B each holding a copy, all have the same legal effect.
Party A representative (signature): Party B representative (signature):
Sample Contract Template 3Demand:
Supply:
In order to enhance the sense of responsibility of the supply and demand sides, to ensure the interests of both parties, supply and demand sides in the spirit of equality and mutual benefit, the principle of consensus, based on the "Chinese People's Republic of China *** and the State of the contract law" of the relevant provisions of the project combined with the ''specific circumstances to sign this contract, in order to facilitate the supply and demand side. The specific circumstances of the signing of this contract, in order to facilitate the two sides to abide by.
Article I: product name, specifications, materials, quantity, amount and configuration
Article II: Delivery and transportation instructions
I: Delivery time: from the signing of the contract payment of goods to arrive at the site within days.
Two: Delivery location:
Three: Delivery method and cost: the goods to the demand side of the designated location, transportation costs borne by the demand side, the site of the lifting provided by the demand side;
Four: the demand side is responsible for providing the installation of the base groove, lifting, bedding, resistance to flotation, digging pits, backfill, check wells and other content, the supply side is responsible for the entire technical guidance.
Article 3: Acceptance standards
Acceptance according to the current industry acceptance standards.
Article 4: Payment methods and deadlines
A: signed the contract prepayment, the finished product before the factory one-time payment of the balance.
Second: the demand side will be transferred to the supply side of the bank account, the total amount of goods in 2000 yuan (including) below, can be settled in cash, more than 2,000 yuan shall be paid by bank transfer. If the customer violates this provision, the customer shall bear the loss.
Article V: Quality requirements, technical standards, Party B is responsible for the quality of the conditions and period
One: the quality of goods in line with industry standards to meet the specification requirements.
Two: to meet the demand side design and construction drawings on the quality requirements.
Third: warranty period: septic tank warranty one year.
Article 6: Liability for breach of contract
1: The ownership of septic tank belongs to the supplier and will be disposed by the supplier before the demand side pays for the goods.
Two: one party due to force majeure can not fulfill the contract, it should promptly notify the other party, and within a reasonable period of time to provide proof issued by the relevant agencies, can be wholly or partially exempted from the responsibility of the party.
Third: During the implementation of the contract, if for any reason can not be performed or need to be modified, must be agreed by both parties, and mutual exchange of letters or another contract to be effective. Fourth: the implementation of this contract dispute, the parties involved in the settlement of the consultation; consultation fails, the two sides agreed to the People's Court of the location of the supplier to file a lawsuit.
Article VII: Other Matters
I: the demand side free of charge to provide the assembly process of water, electricity.
Two: the safety of the assembly process by the supplier's own responsibility.
The demand side: the supply side:
Unit Address: Address:
Legal Representative: Legal Representative:
Entrusted Agent (Signature): Entrusted Agent (Signature):
Bank of Account: Bank of Account:
Account No.: Account No.:
Contact Tel. :Fax:
Date of signing (i.e., the date the contract comes into force):