Who knows the format of quality acceptance record of ventilator?

quality acceptance record of inspection lot of ventilator installation project

181117 □□

181217 □□

181316 □ □

181417 □ □

181517 □ □

Project name of unit (sub-unit)

Division (division) The provisions of the acceptance specification construction unit inspection

evaluation records supervision (construction) Unit acceptance record

master control project 1, fan installation, article 7.2.1

2, fan safety measures, article 7.2.2

general project 1, impeller and casing installation, article 7.3.1-1

2, axial fan blade installation, article 7.3.1-2

3, vibration isolator on the ground, article 7.3.1. Article 7.3.1-4 of hanger

allowable deviation of ventilator installation mm plane displacement of center line 11

elevation 11

center plane displacement of pulley width 1

levelness of transmission shaft 1.2/1111

crosswise 1.3/1111

radial displacement of two shaft cores of coupling 1.15

. 1111

professional foreman (builder), construction team leader of the construction unit

professional quality inspector of the project

acceptance conclusion of the supervision (construction) unit

professional supervision engineer:

(professional technical director of the project of the construction unit).