How much is the national fire contracting per square meter quota?

Fire hydrant according to set the nature of the building with the price of the same general residential 550-600 yuan / set, commercial and other buildings 650-700 yuan / set of single-storey ring commercial or garage, single-storey plant 850-900 yuan / set of clearing the price of the general including auxiliary materials per set of increase of 50-100 yuan or so; the price of the self-sprinkler ceiling ceiling 65-70 yuan / point ceiling 75-80 yuan / point Package auxiliary materials per point increase of 5-10 yuan.

Fire self-alarm system in accordance with the potential to calculate the ceiling 65-70 yuan / point ceiling per point increase of 5 yuan per point package auxiliary materials per point, and then increase by 5 yuan per ultra-high meters per ultra-high meters increase of 3-5 yuan / point, square meters according to the design of the fire protection system with the determination of the price.

Expanded information:

Investment in firefighting funds: all localities have formulated with the local economic and social development level.

Investment in firefighting: Each region has established a mechanism for ensuring firefighting funding that matches the level of local economic and social development and increases year by year, and has clearly defined the minimum standards of protection.

In order to improve firefighting infrastructure, fire departments (stations), fire hydrants, firefighting equipment and the construction of multi-form fire departments have been incorporated into the government's work evaluation, and in the past three years more than 1,200 new fire departments (stations) have been built across the country, with more than 200,000 fire hydrants added, and more than 6,200 firefighting vehicles newly purchased.

In the public **** place decoration: the fire brigade in the completion of the project to the scene of another inspection, will list some corrective comments, according to do is, and then send a fire acceptance audit consent to the construction unit.

First fill out the "building interior decoration design fire audit declaration form", "Shanghai construction engineering construction site fire audit declaration form", remember to declare the unit should be the construction unit, not the construction unit, the need to build the unit stamp, and show the rental agreement or purchase agreement, if the construction unit to go to the office, can only say that it is on behalf of the office.

The content of the declaration form is basically for the main building materials, such as partition wall materials / floor materials / roof materials; need to prepare a copy of the overall fire acceptance of the premises of the drawings (generally in the management of the property).

Need to prepare the specific construction of the premises of the floor plan, electrical diagrams, and fire remodeling diagrams (if not fire facilities, you can explain in the notes), the above drawings need to be sun blueprints, and by the design qualification units (such as architectural design institutes) stamped on the map seal.

The local fire brigade will go to the scene within 10 working days to inspect, and written comments, if you agree, you can start, do not agree, may want to modify the renovation program; two weeks before the completion of the renovation, you can submit the "fire acceptance of construction works declaration form", the content and the declaration form is basically the same.

General fire brigade will be sampling 2~3 kinds of building materials to test, testing costs for each item about 1000 yuan (most likely to be drawn to the PVC pipe, carpentry boards, curtains, etc.), testing, if qualified, the construction unit at least 2 people to participate in the fire training (mandatory), the training fee of about 800 yuan / person (the cost of each place is estimated to be slightly different).