Shops knocking on the wall need to be reported to the local urban management department. The specific process is as follows:
1. Go to the urban management department for reporting with relevant materials, including the address of the decorated shop, the drawings of the decoration design of the shop, the qualification of the construction unit and the decoration agreement.
2. after the urban management department verifies that the decoration of the shop meets the safety requirements, it can go to the property to handle the relevant formalities.
The above procedures are for reference only, so it is recommended that you consult relevant local departments according to the actual situation. In the process of knocking on the wall, it is necessary to pay attention to the fact that the load-bearing wall must not be smashed, and the non-load-bearing wall should be treated with caution to avoid affecting the building structure.