1, living room, dining room floor tile, bathroom, kitchen floor tile, balcony floor tile 40 yuan/_ main material, including labor and auxiliary materials.
5. Coating 17 yuan/_ The main material is provided by itself, including labor and auxiliary materials (the main material is only the last coating).
3. Kitchen cabinet, the cabinet body is made of Chinese fir self-connecting plate and painted, including drawing basket and seasoning basket. The countertop was originally wrapped in artificial stone, but the neighbor said that the artificial stone was not good, so it was replaced with quartz stone. The door panel is painted, and there is no bucket and disinfection cabinet. According to actual calculation, 850 yuan/_.
4. Ceiling, excluding modeling, Lafarge gypsum board and 56 yuan ceiling with wooden keel/_ including main and auxiliary materials and labor.
5, door 850 yuan/_.
6. TV cabinet (180CM*45CM*35CM)400 yuan.
7, shoe cabinet 430 yuan.
8. 430 yuan, a low cabinet beside the meal.
650 yuan, bookcase and writing desk.
10, balcony glove compartment (80CM*60CM*30CM)280 yuan.