Current location - Recipe Complete Network - Catering training - The self-evaluation report of glass curtain wall engineering quality is urgently needed as a model reference ...
The self-evaluation report of glass curtain wall engineering quality is urgently needed as a model reference ...

the

curtain

wall

sub

section

quality

quantity

inspection

receipt

report

to

Southeast Aluminum Co., Ltd.

Wuyuanwan Operation Center 1. It was built by Xiamen Road and Bridge Construction Investment Corporation, designed by Beijing Zhonghua Construction Planning and Design Institute Co., Ltd., provided by Tianjin Geological Engineering Survey and Design Institute, supervised by Xiamen Xiangyu Engineering Consulting Management Co., Ltd., and undertaken by Hunan Third Engineering Company. The glass curtain wall project was designed by Fujian Tianmin Building Decoration Co., Ltd., subcontracted by Hunan Third Engineering Company to Southeast Aluminum Co., Ltd., and the chemical rebar planting of glass curtain wall embedded parts was tested by Xiamen Construction Engineering Testing Center.

2. The functional layout of this project is an office building, with a building grade of Grade I and a frame shear wall structure. The building has thirteen floors, the seismic fortification intensity is Grade VII, the building fire protection classification is Grade II, the above-ground fire resistance grade is Grade II, and the civil air defense engineering grade is Grade VI. Its construction area is 26,623.73 square meters, and the project cost is 23,219,958,741 yuan. The subcontracting quantity of glass curtain wall in this project is 1,111 square meters, and the project cost is 3.5 million yuan. The glass curtain wall adopts blue hidden frame and semi-hidden frame glass curtain wall, which is divided into three sides, namely, axis 4-8 in the south, axis 8-4 in the north (height 33.3-49.2 m) and axis A-D/9 (height 39.6-49.2 m). Curtain wall columns, beams and the main structure are connected with Q235B angle code (aluminum specifications are 125*81*111*8 and 251*111*111*8) and stainless steel bolts embedded, and glass curtain wall is grounded with Ф12 galvanized round steel and Ф3.2 electrode.

II. Construction:

This glass curtain wall project was embedded with embedded parts on July 29th, 2116, officially started on October 2nd, 2116, completed on April 21th, 2117, and accepted by the curtain wall project sub-division on April 24th, 2117. Glass curtain wall projects are constructed in accordance with curtain wall construction drawings and construction specifications, and the quality meets the design requirements and construction specifications after self-inspection.

III. Self-control of project quality

a) Before the construction of glass curtain wall, a professional construction plan for curtain wall project shall be prepared and submitted to the supervisor for examination and approval. After the approval, the construction shall be carried out according to the plan.

b) Before curtain wall construction, axis lofting survey and elevation putright survey shall be carried out on the facade of curtain wall, and the construction shall be started only after being checked and inspected by the supervisor.

c) Before the construction of curtain wall embedded parts, curtain wall columns, beams, lightning protection grounding and other sub-projects, technical and safety disclosure shall be made to each team, and the problems easily existing in the construction process shall be put forward in time to strictly control the project quality.

d) The glass curtain wall materials that enter the site shall be reported to the supervisor for acceptance in time, and can only be used after approval.

e) after the curtain wall embedded parts are embedded, do a good job of concealment acceptance in time.

f) For each concealed work, the next working procedure shall be carried out only after the supervision, quality supervision station and other relevant departments have accepted the concealment;

g) during the construction of this project, it shall be carried out in strict accordance with Mandatory Provisions of Engineering Construction Standards, relevant construction acceptance specifications and relevant standards.

IV. Verification of quality control data

This curtain wall sub-division project * * * verified 8 control data, and 8 items met the requirements by self-evaluation. The specific verification conditions are as follows:

1, 1 copies of blue prints.the design, and 8 copies of design changes; .

2. *** 1 records of construction survey and setting-out of sub-division projects.

3. Ex-factory certificate and ex-factory inspection report of raw materials

<; 1> Curtain wall columns, beams and embedded parts (angle code, stainless steel bolts and iron plates): provided by Jiangmen Civil Affairs Hardware Electroplating Factory, Nanhai Jiujiang Xingye Metal Products Factory, Guangdong Shaogang Songshan Co., Ltd., Anshan Baode Iron and Steel Co., Ltd. and other companies. * * * Check 4 copies of steel warranty.

< 2> Galvanized round steel and welding electrode: provided by Fujian Tianyu Steel Products Co., Ltd. and Xiamen Luguang Industrial Corporation respectively, with Ф 12 round steel and Ф 3.2 welding electrode, with 1 copies of warranty.

< 3> Silicone-copper structural sealant, weather-resistant silicone sealants and special adhesive for 2118 project are provided by Jiangmen Daguangming Adhesive Co., Ltd. and Guangdong Sihui Ouliya Chemical Co., Ltd., with 2 quality certificates, 1 certificates and 3 factory inspection reports.

< 4> Curtain wall glass: provided by Suzhou Giant Star Glass Industry Co., Ltd., with specifications of 6+9+6㎜, 1 copies of product quality guarantee, 1 copies of factory inspection report and 15 copies of factory certificate.

4. 1 copies of compatibility test report of structural adhesive and weather-resistant adhesive for glass curtain wall.

5. 16 acceptance records of concealed works.

6. Three quality acceptance records of subdivisional work and two quality acceptance records of sub-divisions.

7. Setting-out and sampling survey of glass curtain wall construction survey: The deviation of the vertical axis lofting survey and elevation survey results of this sub-division project is within the allowable range of the specification and meets the requirements of the design and construction acceptance specification.

8. 1 copies of the verification certificate of the glass curtain wall grounding resistance test resistance meter (certificate number: DY2116-11925).

V. Test data of safety and function:

1. Embedded parts connecting curtain wall columns, beams and walls are embedded with chemical reinforcement, and 5 points are randomly selected by chemical reinforcement * * *, and the test report is 1, and the inspection results show that it meets the requirements.

2. The grounding resistance meter (model ZC29B-2) was used for the grounding welding test of the glass curtain wall, and 9 points were tested. The maximum measured value was 1.2 ohm (less than 1 ohm in the specification), which met the requirements of the specification.

VI. Curtain wall sub-division project quality evaluation:

1. Sub-division project quality evaluation table

No. Sub-division project name, sub-division project name, inspection lot number evaluation result

1. Curtain wall glass curtain wall 3 is qualified

2. Lightning protection and grounding installation grounding device and installation 1 are qualified

Lightning protection downlead 1 is qualified

Rating and rating 2. This curtain wall.

3. evaluation of visual quality: the self-evaluation of visual quality of this sub-division project is good after inspection.

in the process of construction, our company carries out construction and management in strict accordance with relevant documents, current national construction specifications, mandatory provisions and quality management regulations, so the quality of this project is effectively controlled and guaranteed. I would like to express my deep gratitude for the concern and strong support from relevant departments and leaders during the construction.

technical person in charge of the enterprise:

project manager:

technical person in charge of the project:

Southeast Aluminum Co., Ltd.

April 24, 2117