What department installs fire protection?
Question 1: Which department installed the fire-fighting equipment for qualified fire-fighting construction units?

Question 2: What is fire protection installation and the construction process of on-site fire protection project?

Prepare to set up a project team before construction.

1, the project department knows the general situation of the project, and determines my construction period, progress and employment plan according to the construction plan approved by the civil engineering drawings;

2. Make a material plan, provide a reasonable on-site actual consumption plan according to the project progress and construction drawings, and send it to the purchasing department; 3. The project supervisor should contact the construction and supervision unit to handle the handover procedures (submit qualification, organization design and work report, etc.). ); 4, organize the builder comes into play for safety education and technical disclosure 2,

Construction process flow

1, overall inspection by quality and safety department (1), fire water system

Organize project personnel to be familiar with drawings, construction qualification, organization design, work report, safety education, technical disclosure, planning, steel pipe entry inspection, reserved hole size verification, fabrication and installation of supports and hangers, derusting and oil brushing of pipelines, main pipeline installation, steel pipe inspection lot, concealed engineering inspection, branch pipe and pipeline installation, valve and fire hydrant entry inspection and valve strength leak test, valve and fire hydrant installation, Fire hydrant inspection lot inspection → spray inspection → spray installation → regulator, pump and pump adapter inspection → regulator, pump and pump adapter installation → pump adapter inspection lot inspection → system debugging → pipeline strength leak test, pipeline cleaning and disinfection records, fire hydrant test records, pipeline water test inspection → department (department) engineering inspection → pump alignment → completion drawing production → engineering inspection.

Organize project personnel to be familiar with drawings, construction qualification, organization design, work report, safety education, technical disclosure, planning, steel pipe and bridge approach inspection, steel pipe laying (fire prevention treatment of exposed steel pipe), inspection lot of steel pipe and bridge, concealment and engineering inspection, threading, bridge installation and wiring in bridge, cable approach inspection, threading inspection lot in pipe and wiring (soldering).

→ Equipment approach inspection → Equipment pedestal installation → Equipment installation → Equipment installation inspection lot and project, department/department project inspection → System debugging → System debugging project inspection → Point layout making → Project self-inspection → Rectification → Self-inspection qualified → Inspection company qualified → Inspection → Fire department qualified → Project handover → Sales service three,

Engineering department self-inspection

1, fire water system

Testing basis: DB64/T404-4 10-2005 Code for Quality Inspection and Evaluation of Fire Fighting Systems and GB5026 1-96 Code for Construction and Acceptance of Automatic Sprinkler Fire Fighting Systems.

Test items: fire pump, water pump adapter, outdoor fire hydrant, water pipe network, pressure, main equipment, fire pool, fire water tank, pneumatic water supply device, alarm valve group, hydraulic alarm bell, water flow indicator, sprinkler and system joint test II. Automatic fire alarm system.

Testing basis: DB64/T404-4 10-2005 Code for Quality Inspection and Evaluation of Fire Fighting System and GB50 166-98 Code for Construction and Acceptance of Automatic Fire Alarm System.

Inspection items: pipeline, system wiring, detector installation, manual alarm button, fire alarm controller, floor display, fire control room and system joint test shall be qualified by self-inspection.

Declaration and inspection

1, tested by the testing company 2, passed the test 3, reported to the fire department for acceptance 4, passed the acceptance 5,

accept

1. Users shall be trained in system operation, and the trainers shall sign for confirmation.

2. Hand over relevant engineering data, prepare final accounts, and cooperate with the finance department to collect the project payment.

3. Establish project sales service files and track users' clothing situation.

Question 3: What are the contents of fire engineering construction? 1. Build an automatic fire alarm system, including fire alarm broadcasting and fire fighting linkage;

Two, the construction of automatic fire extinguishing system, including automatic sprinkler system, gas fire extinguishing system, foam fire extinguishing system, nitrogen injection and oil drainage fire extinguishing system. ;

Three, smoke control system, including positive pressure air supply, alarm smoke exhaust;

Four, fire separation, including fire doors, fire shutter, fire water curtain belt;

Five, indoor fire hydrant system;

Six, emergency lighting and evacuation signs;

Seven, stop the fire.

Question 4: What key parts of the information are needed for fire protection engineering? The construction and completion report of the fire-fighting installation unit, the minutes of the blue prints.the design, the design change order, the equipment defect notice and the project contact list-these are all necessary materials to ensure the normal handover of the project. In the process of the project, we must give the greatest attention!

Secondly: the construction organization design, construction scheme, construction safety and technical disclosure of the fire protection installation unit. This part belongs to the internal audit data, which is mainly for the supervisor and Party A to check, but the content is also very important. After all, a good construction scheme is very beneficial to the whole project.

Other documents mainly include: quality certification documents of engineering pipe fittings and pipes of fire fighting installation units; Quality certification documents of engineering equipment and valves of fire fighting installation unit; Quality inspection, evaluation and construction records of the fire water department of the fire installation unit project; Quality inspection and evaluation, construction records and commissioning reports of engineering gas fire protection branch of fire protection installation unit; Quality inspection and evaluation, construction records and debugging reports of the fire-fighting electrical division of the fire-fighting installation unit; Quality inspection, evaluation and construction records of the routine fire pipeline and valve installation division of the fire installation unit project; Quality inspection, evaluation and construction records of conventional fire hydrant installation division of fire protection installation unit project. These documents are mainly in the form of forms, and the key to filling in the forms (generally simple) is to need the signature and seal of the relevant units. (Of course, there is no guarantee that all documents are completely in line with the actual situation. At this time, the important task is how to sign and seal smoothly. Your usual relationship with relevant departments is very important here. The documents should be completed and submitted to relevant departments as soon as possible, and your project manager should be reminded in time if there are any problems! The corresponding coordination will follow.

Project completion information: Ask for instructions on fire control project acceptance, and go to the fire station in advance for related work, construction and product filing. Remember that the fire control construction of the fire station is always the first, and sometimes Party A has no temper! Do everything possible to meet the questions raised by the fire department, because no matter how good the project is, the fire department will do it for nothing if it says a word! (Newcomers need to pay attention to this most)

Finally, the fire inspection report issued by the fire department! Months or even years of work are reflected at this moment! This report is a one-sentence summary of all your work, and all your work revolves around this report (this is the characteristic of fire engineering). This is also the beginning of your project warranty period, and the payment date of the final payment of the project. It is time to celebrate. Your manager must entertain you:-)

Generally speaking, librarians require careful work and good interpersonal relationships. Provide support to the project manager in key parts (mentioned above), because the information in construction is the guarantee of quality. It is important to communicate with the manager in time when you encounter problems. At the critical moment, we will also negotiate with Party A and the supervisor instead of the manager. Don't be afraid, as long as we stick to the principle, there will be no problem.

That's all I thought of. I can communicate with you if I have any questions. I have done many fire fighting projects, most of which are large-scale industrial projects. Fire fighting is actually quite simple, and it usually takes two years to understand. It's good for you to accumulate more contacts at work.

I just finished writing the last question and found your question again. I'll stick it on you again! By the way, where is your project?

Question 5: How to apply for the qualification certificate of fire protection installation usually requires the construction department above the prefecture level and the fire department of the prefecture-level fire brigade.

Requirements for applying for fire engineering qualification certificate:

1, enterprise credit

(1) has the qualification of an independent enterprise legal person;

(2) It has a good social reputation and corresponding economic strength, with a capital of not less than 5 million yuan and a net asset of not less than 6 million yuan in industrial and commercial registration;

(three) in the past five years, independently undertaken not less than two fire control facilities projects with a single building area of not more than 40,000 square meters (design or construction or integration of design and construction). Two items all include automatic fire alarm and its linkage control system and automatic fire extinguishing system, and at least item 1 includes gas fire extinguishing system or foam fire extinguishing system or smoke control and extraction system;

(4) In the past three years, the annual project settlement income is not less than 8 million yuan.

2. Technical conditions

(1) The technical person in charge of the enterprise has more than 6 years' experience in the design and construction of fire-fighting facilities, and has presided over at least 2 fire-fighting facilities projects (design or construction or integration of design and construction) with a single building area of not less than 20,000 square meters. Have the qualification of registered electrical engineer (public equipment) or senior engineer title;

(2) There shall be no less than 12 professional technicians with intermediate or above engineering titles engaged in fire control facilities engineering. Among them, no less than 1 person has at least 1 performance in design or construction of gas fire extinguishing system, no less than 1 performance in design or construction of foam fire extinguishing system, no less than 1 person has at least 1 performance in design or construction of smoke control and smoke extraction fire extinguishing system, and no less than 2 people have at least 65438+.

(three) the professional configuration of the enterprise is reasonable, and there are not less than 2 professionals in electrical, automation, water supply and drainage, and heating and ventilation. There shall be no less than 3 registered electrical engineers (structural engineers, public facilities) with professional qualifications or senior and above engineering titles, and no less than 3 registered construction engineers (project managers) with secondary and above.

3, technical equipment and management level

(1) Having necessary technical equipment and a fixed workplace;

(2) It has a perfect quality management system and operates well. There are technical, safety, management, personnel, finance, archives and other management systems.

Undertaking business scope

(a) enterprises that have obtained the qualification of fire control facilities engineering design and construction can engage in consulting, design, construction and integrated design and construction of fire control facilities engineering of various construction projects, and can also undertake general contracting and project management of corresponding projects; Including:

1, automatic fire alarm and its linkage control system;

2. Automatic sprinkler system;

3. Water spray fire extinguishing system;

4. Gas fire extinguishing system;

5. Foam fire extinguishing system;

6, dry powder fire extinguishing system and other automatic fire extinguishing systems;

7, smoke control system automatic fire facilities engineering;

(two) enterprises that have obtained the first-class qualification are not limited in the scale of undertaking fire control facilities projects;

(3) Enterprises with Grade II qualification can undertake fire protection facilities projects for civil buildings with a single building area of not more than 40,000 square meters, and factories and warehouses with a fire risk of Class C or below.

Question 6: What are the requirements for installing a fire contractor? Get to the point, there is only one condition:

Good relationship with local national fire department.

Question 7: What exactly does a fire-fighting installation budgeter do? The main tasks involved in the fire-fighting installation budget are: 1, compiling the tender budget of fire-fighting installation project, 2, settlement of engineering quantity, 3, providing specific unit project quotation when Party A has quotation demand, and 4, making on-site engineering statistics. These points are required by other bosses I know, depending on the specific work.

When it comes to what is the difference from ordinary cost makers, it is the classification of cost makers.

Cost engineers are divided into three categories: 1, civil engineering 2, municipal engineering 3 and installation engineering 3.

Installation works are divided into: 1, plumbing 2, and electrical appliances.

Specific work should use a specific type of certificate. You can't simply ask you to make a tender budget for municipal engineering, and as a result, you have to stamp a civil engineering cost engineer.

Question 8: How to handle the third-level qualification of fire protection: First, the submission channels of relevant materials for the qualification of fire protection facilities engineering contracting enterprises.

(1) Initial application, re-approval and qualification update of fire protection qualification.

1, apply for the first-and second-class fire professional qualification, and the applicant will submit the application materials to the provincial public security fire department;

2. To apply for the qualification of a third-level fire-fighting subject, the applicant shall submit the application materials to the local public security fire department;

3. To apply for additional fire protection qualification, the applicant shall submit the application materials to the local municipal construction department.

(two) the application for upgrading the fire protection qualification level.

1. If the applicant applies for the upgrade of the subject's fire protection qualification, the applicant shall submit the application materials to the provincial public security fire control institutions; If the enterprise's main fire-fighting qualification is upgraded from level 3 to level 2, the local public security fire department shall also submit the enterprise's initial declaration and annual assessment files to the provincial public security fire department.

2 enterprises to apply for additional fire qualification upgrade, the application materials will be submitted by the applicant to the relevant construction authorities.

(3) Annual assessment of fire fighting qualification

1. If the main project is fire fighting qualification, the assessment materials shall be submitted to the local public security fire department;

2. If the fire protection qualification is added, the assessment materials shall be submitted to the competent department of construction industry.

Second, the enterprise application materials

(1) Initial application, addition, upgrade, re-approval and extension of fire protection qualification.

Enterprises shall provide the Application Form for Qualification of Construction Enterprises (including electronic documents) and corresponding annexes in quadruplicate, which shall be bound in the following order:

Volume I: Comprehensive Information

1, a copy of the business license of the enterprise as a legal person;

2. Original and photocopy of enterprise qualification certificate;

3. Articles of association;

4, the enterprise nearly three years of construction statistics;

5. The audited financial statements of the enterprise in the last three years;

6. The certificate and identity certificate of the legal representative of the enterprise;

7, the identity certificate of the enterprise manager and the technical and financial person in charge, the title certificate and the relevant qualification standards for the technical person in charge on behalf of the project performance certificate;

8. Provide equipment purchase invoices and metrological verification certificates, real estate licenses or factory (office) housing lease contracts and other relevant certificates;

9, enterprise safety production license;

Among them, the enterprise applying for qualification for the first time does not need to provide the materials mentioned in items 2, 4, 5 and 9 above, but should provide the documents of enterprise safety production management system.

Enterprises applying for restructuring, division or merger need to re-examine their qualifications, and then provide the following information and incorporate it into this book:

10, enterprise reorganization, division and merger plan (including the division of production, personnel and engineering performance between the new enterprise and the original enterprise);

1 1, approval documents of enterprise restructuring, division and merger or resolutions of shareholders' meeting or workers' congress;

12, enterprise restructuring and separation should provide the financial statements and statistical statements of the enterprise in the three years before the restructuring and separation;

13. If the enterprises are merged, the financial statements, statistical statements and the latest consolidated statements of each enterprise in the three years before the merger shall be provided;

Volume II: Personnel Information

1, the identity certificate and registration certificate of the registered personnel listed in the application form for qualification of construction enterprises;

2. The professional title certificate, identity certificate and endowment insurance certificate of non-registered professionals required by the qualification standards of construction enterprises;

3, fire engineering construction enterprises must have professional and technical personnel title certificate, identity certificate and pension insurance certificate;

Volume III: Engineering Performance Data (not provided when applying for the lowest level qualification)

1, engineering contract, bid-winning notice;

2, in line with the provisions of the state completion acceptance certificate or quality verification data (automatic fire facilities inspection report, the local public security fire department issued by the construction project acceptance certificate)

(2) Annual assessment of fire fighting qualification

Enterprises need to provide the Application Form for Annual Examination of the Qualification of Shandong Fire Protection Facilities Engineering Contracting Enterprises in duplicate (including electronic documents) and corresponding attachments, which shall be bound in the following order:

1, a copy of the business license of the enterprise as a legal person;

2. Original and photocopy of enterprise qualification certificate;

3, the enterprise construction industry statistics this year;

4. The audited financial statements of the enterprise this year;

5, enterprise safety production license;

6, the legal representative of the enterprise, enterprise manager, technical director, financial director of the office documents, identity certificates, professional title certificates and other materials;

7. Equipment purchase invoice, metrological verification certificate, house property certificate or lease contract of office space and other relevant certificates;

8. The identity certificate, registration certificate, professional title certificate and endowment insurance certificate of the technicians listed in the Application Form for Annual Qualification Examination of Shandong Fire Protection Facilities Engineering Contracting Enterprises;

9, the provincial public security fire department training qualified fire facilities engineering and technical personnel training certificate;

10. Data of fire control facilities contracted this year:

(1) project contract and letter of acceptance;

(2) automatic fire control facilities inspection report;

......& gt& gt

Question 9: What about the fire installation business license? Have a business license first, and then go to the fire department to apply for a fire equipment experience permit with the business license, code certificate, legal person ID card, capital verification report and site lease contract. In many places, individuals cannot handle it, and only legal persons with independent legal personality can handle it.

Question 10: Do I need to report to the fire department for acceptance when installing Class A fire doors? * * * The acceptance of the manufacturer conforms to the national standard "Fire Door" GB 12955. For users, it is to check the type approval certificate, test report and factory certificate of fire protection products, covering the production date of fire protection products.